HomeMy WebLinkAbout11680 Goldring Rd # C & D - 2024 - Atlantic FishS.HyungJin
S.HyungJin
S.HyungJin
S.HyungJin
14
SCOPE OF WORK
8
8
MINIMUM 3'-0" WIDE DETECTABLE WARNINGS. SEE 07/A101.
S.HyungJin
07
-
S.HyungJin
S.HyungJin
S.HyungJin
S.HyungJin
S.HyungJin
S.HyungJin
S.HyungJin
S.HyungJin
S.HyungJin
E-2.1
POWER FLOOR PLAN
At
l
a
n
t
i
c
F
i
s
h
11
6
8
0
G
o
l
d
r
i
n
g
R
d
.
,
S
u
i
t
e
C
&
D
,
Ar
c
a
d
i
a
,
C
A
9
1
0
0
6
Sheet Title
Project Numbers
Date
Checked By
Drawn By
Key Plan N.T.S.
202309.03
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
Sheet Number
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
De
v
e
l
o
p
e
d
f
o
r
A
t
l
a
n
t
i
c
F
i
s
h
AG
E
N
C
Y
S
U
B
M
I
T
T
A
L
/
B
I
D
S
E
T
12
/
1
5
/
2
3
-
HACE INC, 2601 Walnut Ave., Suite A
Tustin, CA 92780
T.949.892.9732 E. hseo@haceinc.com
S.HyungJin
E-3.1
SINGLE LINE DIAGRAM
AND PANEL SCHEDULES
At
l
a
n
t
i
c
F
i
s
h
11
6
8
0
G
o
l
d
r
i
n
g
R
d
.
,
S
u
i
t
e
C
&
D
,
Ar
c
a
d
i
a
,
C
A
9
1
0
0
6
Sheet Title
Project Numbers
Date
Checked By
Drawn By
Key Plan N.T.S.
202309.03
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
Sheet Number
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
De
v
e
l
o
p
e
d
f
o
r
A
t
l
a
n
t
i
c
F
i
s
h
AG
E
N
C
Y
S
U
B
M
I
T
T
A
L
/
B
I
D
S
E
T
12
/
1
5
/
2
3
-
HACE INC, 2601 Walnut Ave., Suite A
Tustin, CA 92780
T.949.892.9732 E. hseo@haceinc.com
S.HyungJin
1.CONTRACTOR TO PROVIDE COMPLETE SEISMIC ANCHORAGE AND BRACING FOR ALL MECHANICAL EQUIPMENT THAT IS DIRECTLY MOUNTED ON
THE FLOOR OR ROOF AND ALL MECHANICAL EQUIPMENT THAT IS SUSPENDED FROM THE FLOOR, WALL OR SUPPORTED BY VIBRATION
ISOLATORS TO RESIST A HORIZONTAL FORCE ACTING IN ANY DIRECTION USING THE CRITERIA OUTLINED IN THE CALIFORNIA BUILDING CODE,
REFER TO CHAPTER 16A. PROVIDE ANCHORAGE CALCULATIONS AND DETAILS CERTIFIED BY A STRUCTURAL ENGINEER REGISTERED IN THE
STATE OF CALIFORNIA. THE INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE STRUCTURAL ENGINEER AND WITH ALL APPLICABLE
AMENDMENTS AND FIRE DEPARTMENTS.
2.CONTRACTOR TO PROVIDE COMPLETE SEISMIC BRACING AND ANCHORAGE OF ALL PIPING AND DUCTWORK. BRACING AND ANCHORAGE SHALL
CONFORM TO MASON INDUSTRIES"SEISMIC RESTRAINT GUIDELINES FOR SUSPENDED PIPING, DUCTWORK AND ELECTRICAL SYSTEMS", I.S.A.T.
OPA-0485 "ENGINEERED SEISMIC BRACING OF SUSPENDED UTILITIES", SMACNA "GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL
SYSTEMS", OR OTHER PRE-APPROVED SYSTEMS.
3.ALL PIPING, DUCTWORK AND CONDUIT CROSSING BUILDING SEISMIC SEPARATIONS SHALL BE PROVIDED WITH APPROVED FLEXIBLE
CONNECTORS.
SYMBOLSABBREVIATIONS
AS-BUILT DRAWINGS:
SEISMIC ANCHORGE:
WARRANTY:
OPERATION AND MAINTENANCE MANUALS:
TESTING AND OPERATION:
CONCEALED SPACES, CIRCULATION AIR:
HVAC GENERAL SPECIFICATIONS
GENERAL NOTES
AUTOMATIC TIME SWITCH:
MAINTENANCE LABEL:
CODE NOTES:
INSPECTION:
HVAC NOTESGENERAL NOTES
SCOPE:
CODES AND REGULATIONS:
SYMBOLS AND ABBREVIATIONS:
NATURE OF THE DRAWINGS:
PERMITS, LICENSEES, AND FEES:
FIELD VERIFICATION:
DISCREPANCIES:
COORDINATION:
SUBMITTALS:
SALVAGE:
DEMOLITION:
PROTECTION AND REPAIR OF NEW WORK:
PROTECTION, REPAIR, AND RESTORATION OF EXISTING:
CONSTRUCTION BARRIERS AND PASSAGES:
WORK SCHEDULING AND INTERRUPTIONS:
MATERIALS:
MATERIALS UNIFORMITY:
STRUCTURAL MEMBERS:
SEALING OF OPENINGS:
PLUMBING DISTINCTION:
AIR BALANCING:
MANUFACTURER'S INSTALLATION RECOMMENDATIONS:
WIRING: RESPONSIBILITY DISTINCTION:
APPLICABLE CODES
2022 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE 24 C.C.R.
2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R.
2022 CALIFORNIA ELECTRICAL CODE (CEC) , PART 3, TITLE 24 C.C.R.
2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R.
2022CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R.
2022 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R.
2022 CALIFORNIA FIRE CODE, PART 9, TITLE 24 C.C.R.
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE, PART 11, TITLE 24 C.C.R.
2022CALIFORNIA REFERENCED STANDARDS, PART 12, TITLE 24 C.C.R.
TITLE 19 C.C.R., PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS
2022 ASME A17.1 SAFETY CODE FOR ELEVATORS AND ESCALATORS
SUPPLY OR RETURN DUCTS CONVEYING HEATED OR COOLED AIR IN THE
FOLLOWING LOCATIONS ARE REQUIRED TO BE INSULATED WITH R-8
INSULATION: (1) OUTDOORS, (2) IN SPACE BETWEEN THE ROOF AND
INSULATED CEILING, 3) IN SPACE DIRECTLY UNDER THE ROOF WITH
FIXED VENTS OR OPENINGS TO THE OUTSIDE, (4) UNCONDITIONED
SPACE.
PLAN CHECK NOTE:THE SCOPE OF THIS SUBMITTAL IS:
SEISMIC BRACING
GREEN BUILDING REQUIREMENTS
MECHANICAL
At
l
a
n
t
i
c
F
i
s
h
11
6
8
0
G
o
l
d
r
i
n
g
R
d
.
,
S
u
i
t
e
C
&
D
,
Ar
c
a
d
i
a
,
C
A
9
1
0
0
6
Sheet Title
Project Numbers
Date
Checked By
Drawn By
Key Plan N.T.S.
202309.03
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
Sheet Number
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
De
v
e
l
o
p
e
d
f
o
r
A
t
l
a
n
t
i
c
F
i
s
h
AG
E
N
C
Y
S
U
B
M
I
T
T
A
L
/
B
I
D
S
E
T
12
/
1
5
/
2
3
-
HACE INC, 2601 Walnut Ave., Suite A
Tustin, CA 92780
T.949.892.9732 E. hseo@haceinc.com
4
FA
N
C
O
I
L
(E) FAN COIL
(E) WALK IN COOLER
WA
L
K
I
N
F
R
E
E
Z
E
R
COMPRESSORS 15lbs OF REFRIGERANT EACH AT 90%CAPACITY, AT
100% CAPACITY=15/.90= 16.66LBS OF REFRIGERANT EACH
TOTAL REFRIGERANT LOAD FOR BOTH COMPRESSORS=16.66X2=33.33LBS
27.5'X18'X9.5'=4,702 CUBIC FT
CMC ALLOWS MAXIMUM OF
31LBS PER EVERY 1000 CUBIC
FT OF SPACE (CMC TABLE
1102.3)
WE HAVE A MAXIMUM OF
16.66 LBS FOR THE ENTIRE
WALK IN COOLER
18'X10'X8'=1,440 CUBIC FT
CMC ALLOWS MAXIMUM OF
31LBS PER EVERY 1000
CUBIC FT OF SPACE (CMC
TABLE 1102.3)
WE HAVE A MAXIMUM OF
16.66 LBS FOR THE ENTIRE
WALK IN FREEZER
CALCULATION:
CALCULATION:
Lbs OF REFRIGERANT
16.66Lbs OF R-404A
Lbs OF REFRIGERANT
16.66Lbs OF R-404A
(E)Lbs OF REFRIGERANT FOR
EXISTING WALK IN COOLER
16.66Lbs
REFRIGERANT R-404A, SAFETY
GROUP A-1 PER CMC TABLE
1102.3 (ASHRAE 34: TABLE 4-1,
TABLE 4-2)
Lbs OF REFRIGERANT FOR
WALK IN FREEZER 16.66Lbs
REFRIGERANT R-404A, SAFETY
GROUP A-1 PER CMC TABLE
1102.3 (ASHRAE 34: TABLE 4-1,
TABLE 4-2)
TU
R
B
O
A
I
R
M
O
D
E
L
:
LE
D
1
2
4
B
E
C
O
X
(E) TURBO AIR MODEL:
LED124BECOX
(E) TURBO AIR MODEL:
TS035XR404A2A
(E) REFRIGERATION RACK
ON ROOF
TURBO AIR MODEL:
TS035XR404A2A
REFRIGERATION RACK
ON ROOF
INTERCONNECT
REFRIGERATION RACK
WITH FAN COIL
MECHANICAL
At
l
a
n
t
i
c
F
i
s
h
11
6
8
0
G
o
l
d
r
i
n
g
R
d
.
,
S
u
i
t
e
C
&
D
,
Ar
c
a
d
i
a
,
C
A
9
1
0
0
6
Sheet Title
Project Numbers
Date
Checked By
Drawn By
Key Plan N.T.S.
202309.03
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
Sheet Number
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
De
v
e
l
o
p
e
d
f
o
r
A
t
l
a
n
t
i
c
F
i
s
h
AG
E
N
C
Y
S
U
B
M
I
T
T
A
L
/
B
I
D
S
E
T
12
/
1
5
/
2
3
-
HACE INC, 2601 Walnut Ave., Suite A
Tustin, CA 92780
T.949.892.9732 E. hseo@haceinc.com
SCALE:
MECHANICAL FLOOR PLAN
1/8"=1'-0"
4
T-24 FORMS
At
l
a
n
t
i
c
F
i
s
h
11
6
8
0
G
o
l
d
r
i
n
g
R
d
.
,
S
u
i
t
e
C
&
D
,
Ar
c
a
d
i
a
,
C
A
9
1
0
0
6
Sheet Title
Project Numbers
Date
Checked By
Drawn By
Key Plan N.T.S.
202309.03
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
Sheet Number
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
De
v
e
l
o
p
e
d
f
o
r
A
t
l
a
n
t
i
c
F
i
s
h
AG
E
N
C
Y
S
U
B
M
I
T
T
A
L
/
B
I
D
S
E
T
12
/
1
5
/
2
3
-
HACE INC, 2601 Walnut Ave., Suite A
Tustin, CA 92780
T.949.892.9732 E. hseo@haceinc.com
4
At
l
a
n
t
i
c
F
i
s
h
11
6
8
0
G
o
l
d
r
i
n
g
R
d
.
,
S
u
i
t
e
C
&
D
,
Ar
c
a
d
i
a
,
C
A
9
1
0
0
6
Sheet Title
Project Numbers
Date
Checked By
Drawn By
Key Plan N.T.S.
202309.03
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
Sheet Number
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
De
v
e
l
o
p
e
d
f
o
r
A
t
l
a
n
t
i
c
F
i
s
h
AG
E
N
C
Y
S
U
B
M
I
T
T
A
L
/
B
I
D
S
E
T
12
/
1
5
/
2
3
-
HACE INC, 2601 Walnut Ave., Suite A
Tustin, CA 92780
T.949.892.9732 E. hseo@haceinc.com
PLUMBING LEGEND
NOTES AND SCHEDULES
ABBREVIATIONSYMBOL DESCRIPTION
(E)ELECTRIC WATER HEATER SCHEDULE
SYMBOL SERVICE LOCATION
STORAGE ROOM
MANUFACTURER &
MODEL NO.
AO SMITH
DEL-20
KW TYPE
ELECT ELECTRIC TANK TYPE WATER HEATER 20 GALLON
CAPACITY 4.5KW UPPER AND LOWER ELEMENT
NONE SIMULTANEOUS, 23GPH AT 80RISE, 208V 1PH
OPERATING WEIGHT 250LBS
REMARKS
DOMESTIC
HOT WATER 4.5
PLUMBING FIXTURE SCHEDULE
(E)EXPANSION TANK SCHEDULE
·2022 CALIFORNIA BUILDING CODE
·2022 CALIFORNIA ELECTRICAL CODE
·2022 CALIFORNIA FIRE CODE
·2022CALIFORNIA ENERGY CODE (TITLE 24)
·2022 CALIFORNIA PLUMBING CODE WITH ALL APPLICABLE AMENDMENTS
·2022 CALIFORNIA MECHANICAL CODE WITH ALL APPLICABLE AMENDMENTS
·2022CALIFORNIA GREEN CODE WITH ALL APPLICABLE AMENDMENTS
ALL PLUMBING FIXTURES ON PLUMBING FIXTURE AND EQUIPMENT SCHEDULE MEET THE REQUIREMENTS
OF CALIFORNIA GREEN CODE 2022.
·WATER CONSERVING PLUMBING FIXTURES AND FITTINGS 5.303.3
·WATER CLOSETS 5.303.3.1
·URINALS 5.303.3.2
·SHOWER HEADS 5.303.3.3
·FAUCETS AND FOUNTAINS 5.303.3.4
·COMMERCIAL KITCHEN EQUIPMENT 5.303.4
·STANDARDS FOR PLUMBING FIXTURES AND FITTINGS 5.303.6
·CPC CHAPTER 17
CALIFORNIA GREEN CODE NOTES
APPLICABLE CODES
1. WATER CLOSETS:
A.THE HEIGHT OF ACCESSIBLE WATER CLOSETS SHALL BE A MINIMUM OF 17"
(431.8 mm) AND A MAXIMUM OF 19" (482.6 mm) MEASURED TO THE TOP OF
TOILET SEAT. FLUSH CONTROLS SHALL BE OPERABLE, BE AN OSCILLATING
HANDLE WITH A MAXIMUM OPERATING FORCE OF 3 LBS. (.67 N) OR BY A
REMOTE LOW VOLTAGE BUTTON. THE HANDLE OF THE BUTTON SHALL BE
LOCATED SO IT IS OPERABLE WITHOUT REQUIRING EXCESSIVE BODY
MOVEMENT. (LOCATE ON WIDE SIDE OF WATER CLOSET).
2. LAVATORIES:
A.LAVATORIES SHALL BE MOUNTED WITH A CLEARANCE OF AT LEAST 29" (736.6
mm) FROM THE FLOOR TO THE BOTTOM OF THE APRON WITH KNEE
CLEARANCE UNDER THE FRONT LIP EXTENDING A MINIMUM OF 30" (762 mm)
IN WIDTH WITH 8" (203.2 mm) MINIMUM OF DEPTH AT THE TOP. TOE
CLEARANCE SHALL BE THE SAME WIDTH AND SHALL BE A MINIMUM OF 9"
(228.6 mm) HIGH FROM THE FLOOR AND A MINIMUM OF 17" (431.8 mm) DEEP
FROM THE FRONT OF THE LAVATORY.
B.HOT WATER AND DRAIN PIPES UNDER LAVATORIES SHALL BE INSULATED OR
OTHERWISE COVERED. THERE SHALL BE NO SHARP OR ABRASIVE SURFACES
UNDER LAVATORIES.
C.FAUCET CONTROLS AND OPERATING MECHANISMS SHALL BE OPERABLE
WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING OR
TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE CONTROLS
SHALL BE NO GREATER THAN 5 LBS. (22.2 N). LEVER-OPERATED PUSH TYPE
AND ELECTRONICALLY CONTROLLED MECHANISMS ARE EXAMPLES OF
ACCEPTABLE DESIGNS. SELF-CLOSING VALVES ARE ALLOWED IF THE FAUCET
REMAINS OPEN FOR AT LEAST 10 SECONDS.
ADA REQUIREMENTS
1.MINIMUM OF 65% OF NON HAZARDOUS CONSTRUCTION WASTE TO BE RECYCLE. CGC 5.408.1.
2.TESTING AND ADJUSTING OF NEW SYSTEMS SHALL COMPLY AS OUTLINED IN CGC SECTION
5.410.2.4
3.OPERATIONS AND MAINTENANCE SCHEDULE (O&M) AS LISTED IN CGC SECTION 5.410.4.5 SHALL
BE DELIVERED TO THE BUILDING OWNER OR REPRESENTATIVE AND THE FACILITIES OPERATOR.
4.DURING CONSTRUCTION, ENDS OF DUCT OPENING ARE TO BE SEALED, AND MECHANICAL
EQUIPMENT IS TO BE COVERED. CGC 5.504.3.
5.VOC'S MUST COMPLY WITH THE LIMITATIONS LISTED IN SECTION 5.504.4.2 AND TABLES 4.504.3,
5.504.4.1, 5.504.4.2, 5.504.4.3 AND 5.504.4.5 FOR: ADHESIVES, SEALANTS, PAINTS, AND COATINGS,
CARPET AND COMPOSITION WOOD PRODUCTS. CGC 5.504.4.4 .
GREEN BUILDING STANDARD NOTES
FIXTURE FLOW RATES
FIXTURE TYPE MAXIMUM FLOW RATE
LAVATORY FAUCETS NONRESIDENTIAL
KITCHEN FAUCETS
WASH FOUNTAINS
METERING FAUCETS
METERING FAUCETS FOR WASH FOUNTAINS
FLUSHOMETER VALVE WATER CLOSETS
URINALS
GRAVITY TANK TYPE WATER CLOSETS
FLUSHOMETER TANK WATER CLOSETS
ELECTROMECHANICAL HYDRAULIC WATER CLOSETS
1.8 GPM @ 60 PSI
0.35 GPM @ 60 PSI
1.8 GPM @ 60 PSI
1.8 [ RIM SPACE (IN.) / 20 GPM @ 60 PSI ]
0.2 GALLONS / CYCLE
0.20 [ RIM SPACE (IN.) / 20 GPM @ 60 PSI ]
1.12 GALLONS / FLUSH
0.125 GALLONS / FLUSH
1
1.12 GALLONS / FLUSH 1
1.12 GALLONS / FLUSH 1
1.12 GALLONS / FLUSH 1
INCLUDES SINGLE AND DUAL FLUSH WATER CLOSETS WITH AN EFFECTIVE FLUSH OF 1.12 GALLONS
OR LESS:
SINGLE FLUSH TOILET - THE EFFECTIVE FLUSH VOLUME SHALL NOT EXCEED 1.12 GALLONS (4.34
LITERS). THE EFFECTIVE FLUSH VOLUME IS THE AVERAGE FLUSH VOLUME WHEN TESTED IN
ACCORDANCE WITH ASME A 112.19.233.2.
DUAL FLUSH TOILETS - THE EFFECTIVE FLUSH VOLUME SHALL NOT EXCEED 1.12 GALLONS (4.34
LITERS). THE EFFECTIVE FLUSH VOLUME IS DEFINED AS THE COMPOSITE, AVERAGE FLUSH VOLUME
OF TWO REDUCED FLUSHES AND ONE FULL FLUSH. FLUSH VOLUMES WILL BE TESTED IN
ACCORDANCE WITH ASME A 112.19.2 ASME A 112.19.14.
CALGREEN MANDATORY MEASURES
SHOWERHEADS (LOW FLOW)
GENERAL NOTES
NO LEAD REQUIREMENT
ALL MATERIALS, DEVICES, ETC...INSTALLED IN THE DOMESTIC HOT AND COLD WATER SYSTEMS
SHALL COMPLY WITH CALIFORNIA HEALTH AN SAFETY CODE SECTION 116875- AB1953
1.BEFORE COMMENCEMENT OF WORK, THE CONTRACTOR SHALL VERIFY THE
EXACT LOCATIONS, ELEVATIONS AND CHARACTERISTICS OF ALL UTILITIES
AND PIPING, AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT OF ANY
DISCREPANCIES.
2.EXACT LOCATIONS AND MOUNTING HEIGHTS OF PLUMBING FIXTURES SHALL
BE OBTAINED FROM THE ARCHITECTURAL DRAWINGS.
3.SEE ARCHITECTURAL DRAWINGS FOR HANDICAP FIXTURE LOCATIONS AND
MOUNTING HEIGHTS. INSULATE ALL EXPOSED WATER AND DRAIN PIPING
BELOW LAVATORIES AND SINKS WITH TRUEBRO NO. 102W AND 105W
INSULATION KIT AND OFFSET P-TRAP TO WALL. ALL WATER CLOSET FLUSHING
LEVERS SHALL BE TO THE WIDE SIDE OF THE STALL.
4.TRAPS FOR ALL SINKS SHALL TRAP STRAIGHT BACK TO WALL WITH ALL
REQUIRED OFFSETS HAPPENING WITHIN THE WALL.
5.PLUMBING WORK SHALL BE INSTALLED SO AS TO AVOID INTERFERENCE WITH
ELECTRICAL AND MECHANICAL EQUIPMENT AND STRUCTURAL FRAMING.
6.THE CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL CEILING
ACCESS PANELS WITH THE ARCHITECTURAL REFLECTED CEILING PLAN AND
THE ELECTR. LIGHTING LAYOUT.
7.CLEANOUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE. THE CONT'R
SHALL COORDINATE ALL CLEANOUT LOCATIONS WITH EQUIPMENT, CABINETS,
ETC., AND THE ARCHITECT PRIOR TO ANY INSTALLATION.
8.VALVES, UNIONS, ETC. TO BE SAME SIZE AS PIPE UNLESS OTHERWISE
INDICATED ON DRAWINGS.
9.WORK AND MATERIAL SHALL BE PERFORMED AND INSTALLED IN COMPLIANCE
WITH ALL APPLICABLE CODES AS ADOPTED AND AMENDED BY THE
INSPECTING AUTHORITY. NOTHING IN THESE DRAWINGS IS TO BE CONSTRUED
TO PERMIT WORK NOT CONFORMING TO THESE CODES OR OTHERS
APPLICABLE TO THIS PROJECT:
10.BEFORE FABRICATION OR INSTALLATION THIS CONTRACTOR SHALL VERIFY
EXACT LOCATIONS OF ALL EQUIPMENT PROVIDED UNDER ANOTHER SECTION
OF SPECIFICATIONS. EXACT ROUGH-IN LOCATIONS AND REQUIREMENTS
SHALL BE COORDINATED IN FIELD.
11.WASTE AND VENT PIPING SHALL SLOPE AT 2% UNLESS OTHERWISE
INDICATED.
12.VALVES, TRAP PRIMER, WATER HAMMER ARRESTERS OR OTHER EQUIPMENT
SHOWN IN WALLS OR ABOVE NON-ACCESSIBLE CEILINGS SHALL BE INSTALLED
BEHIND AN ACCESS PANEL.
13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND REPAIRING
ALL AREAS DAMAGED BY HIS OPERATIONS.
14.EXISTING PIPING DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED
WITH MATERIALS TO MATCH EXISTING BY THE CONTRACTOR.
15.EXISTING PIPING, FIXTURES AND EQUIPMENT THAT IS REMOVED SHALL BE
DISPOSED OF AS DIRECTED BY THE OWNER'S REPRESENTATIVE.
16.PIPING THROUGH FIRE RATED WALLS SHALL BE PER U.L. FIRE RESISTANCE
SYSTEM NO. WL1001. SEE ARCHITECTURAL PLANS FOR ALL LOCATIONS.
17.ANCHORAGE DETAILS FOR EQUIPMENT WHICH ARE NOT APPROVED DURING
PLAN REVIEW ARE SUBJECT TO APPROVAL OF THE STRUCTURAL ENGINEER
OF RECORD AND STRUCTURAL ENGINEER PRIOR TO INSTALLATION AND
INSPECTION BY THE PROJECT INSPECTOR.
18.HOT WATER PIPING SHALL BE INSULATED IN ACCORDANCE WITH SECTION 123,
TABLE 1-G OF THE TITLE 24 REGULATIONS.
19.ITEMS NOT SPECIFIED OR SHOWN IN THE DRAWINGS OR SPECIFICATIONS BUT
NECESSARY FOR THE COMPLETE CODE APPROVED INSTALLATION OR FOR
COMPLETE OPERATION OF THE SYSTEM/INSTALLATION SHALL BE PROVIDED
AS REQUIRED AT NO ADDED COST TO THE OWNER.
20.PIPE SIZES SHALL BE THE SAME AS THE UPSTREAM PIPE SIZES UNLESS
OTHERWISE INDICATED ON PLAN.
21.UNLESS SPECIFIED ON STRUCTURAL DRAWINGS, ANY ALTERATION OR
MODIFICATIONS A STRUCTURAL ELEMENTS BY CUTTING, DRILLING, BORING,
BRACING, WELDING ETC. SHALL HAVE WRITTEN APPROVAL STRUCTURAL
ENGINEER OF RECORD PRIOR START WORK.
22.CLEANOUTS SHALL BE INSTALLED AS PER SECTION 707.0 AND 719.0 OF THE
PLUMBING CODE.
23.EACH PLUMBING VENT SHALL TERMINATE NOT LESS THAN TEN FEET FROM OR
AT LEAST THREE FEET ABOVE ANY WINDOW, DOOR, OPENING, AIR INTAKE, OR
VENT SHAFT.
24.WATER CLOSET BOWLS FOR PUBLIC USE SHALL BE OF THE ELONGATED TYPE.
25.PROVIDE TRAP PRIMERS AT FLOOR DRAINS AND SINKS TO MAINTAIN WATER
SEALS.
26.POTABLE WATER SYSTEMS ON THIS PROJECT SHALL BE DISINFECTED PRIOR
TO USE ACCORDING TO THE METHOD SET IN SECTION 609.9 OF THE PLUMBING
CODE.
27.PLUMBING DRAWINGS ARE DIAGRAMMATIC. THE LOCATION AND ELEVATION OF
ALL PLUMBING PIPING IS APPROXIMATE AND SHALL BE VERIFIED AND
COORDINATED WITH ALL OTHER TRADES, STRUCTURAL CONDITIONS, AND
BUILDING CONSTRUCTION PRIOR TO START INSTALLATION.
1.APPLIANCE AND PLUMBING VENTS AND THE DISCHARGE OUTLET OF EXHAUST FANS SHALL BE
AT LEAST TEN (10) FEET IN A HORIZONTAL DIRECTION, OR THREE (3) FEET ABOVE THE
OUTSIDE-AIR INTAKES FOR THE HVAC UNITS.
2.APPLIANCES DESIGNED TO BE FIXED IN POSITION SHALL BE SECURELY FASTENED IN PLACE
PER BUILDING CODE REQUIREMENTS OR APPLICABLE MANUFACTURER INSTALLATION
REQUIREMENTS.
3.SHOWER AND TUB COMBINATIONS SHALL BE PROVIDED WITH INDIVIDUAL CONTROL VALVES
OF THE PRESSURE
BALANCE, THERMOSTATIC, OR COMBINATION PRESSURE/THEMOSTATIC MIXING VALVE TYPE.
HANDLE POSITION TOPS SHALL BE ADJUSTED TO DELIVER A MAXIMUM MIXED WATER
SETTING OF 120°F.
4.EXPOSED GAS PIPING PIPING SHALL BE PROTECTED AGAINST CORROSION BY COATING OR
WRAPPING WITH AN INERT MATERIAL APPROVED FOR SUCH APPLICATIONS.
5.ROOF DRAINS, OVERFLOW DRAINS AND RAINWATER PIPING WITHIN THE INTERIOR OF THE
BUILDING SHALL BE TESTED IN ACCORDANCE WITH THE PROVISIONS OF THE CALIFORNIA
PLUMBING CODE FOR TESTING DRAIN, WASTE AND VENT SYSTEMS.
6.CLEANOUTS FOR HORIZONTAL BUILDING STORM DRAINS SHALL COMPLY WITH THE
REQUIREMENTS OF SECTION 719 OF THE CALIFORNIA PLUMBING CODE
7.ROOF DRAIN AND OVERFLOW DRAIN PIPING WITHIN THE BUILDING SHALL UTILIZE APPROVED
DRAINAGE PATTERN FITTINGS.
8.FIRE DEPARTMENT APPROVAL SHALL BE OBTAINED BEFORE ISSUANCE OF PERMIT
9.EACH VENT SHALL RISE VERTICALLY TO A POINT OF NOT LESS THAN SIX (6) INCHES IN HEIGHT
ABOVE THE FLOOD LEVEL RIM OF THE FIXTURE BEFORE BEING CONNECTED TO ANY OTHER
VENT.
10.NO GAS PIPING SHALL BE INSTALLED IN OR ON THE GROUND UNDER ANY BUILDING,
STRUCTURE, OR FOUNDATION UNLESS INSTALLED IN GAS TIGHT CONDUIT.
11.RAIN WATER PIPING LOCATED ON THE EXTERIOR OF A BUILDING SHALL BE NOT LESS NO. 26
GAGE GALV. SHEET METAL AND WHEN THE CONDUCTOR IS CONNECTED TO A BUILDING
STORM DRAIN, A DRAIN CONNECTION SHALL BE EXTENDED ABOVE THE FINISHED GRADE AND
JOINED AT A POINT PROTECTED FROM MECHANICAL DAMAGE.
12.ROOF DRAINAGE SHALL NOT BE DISCHARGED INTO THE SANITARY WASTE SYSTEM.
13.PLUMBING FIXTURES , EQUIPMENT AND COMPONENT SHALL BE APPROVED AND COMPLY
WITH AB1953.
14.THE INSTALLATION OF CPVC SHALL COMPLY WITH THE 2022 C.P.C. 604.1.1.
PLAN CHECK NOTES
a) ALL FIXTURES, EQUIPMENT, PIPING AND MATERIALS SHALL BE LISTED
b) ALL PLUMBING FIXTURES SHALL MEET THE FLOW REQUIREMENTS SPECIFIED IN
LOS ANGELES PLUMBING CODE.
c) ALL PLUMBING FIXTURES THAT PROVIDE WATER FOR HUMAN CONSUMPTION
SHALL COMPLY WITH THE CALIFORNIA LEAD FREE LAW (PER SECTION 116875 OF
THE CALIFORNIA HEALTH AND SAFETY CODE)
PLAN CHECK NOTES
(E) 1 1/2"CW(E) 1 1/2"CW
FS-2
FS-1 FS-1
(E)3-COMP-1
(E)HS-1
RELOCATED(E)MS-1
(E)FD-1
ABOVE FLOOR TYPE
(E)TD-1
(E
)
3
/
4
"
H
W
(E
)
3
/
4
"
C
W
(E
)
3
/
4
"
H
W
(E
)
3
/
4
"
C
W
(E
)
3
/
4
"
H
W
(E
)
3
/
4
"
C
W
(E
)
1
"
C
W
(E)3/4"CW
(E)3/4"HW
(E
)
3
/
4
"
H
W
(E)EWH-1
(E)TP-1
(E)ET-1
(E)WC-1 (E)WC-1
(E)L-1(E)L-1
HB-1
CONNECT 3/4"CW AND 34"HW
TO EXISTING 3/4"CW AND
3/4"HW IN CEILING SPACE
3/4"CW AND 34"HW DOWN IN
WALL TO FIXTURE
CAP ALL WATER SUPPLIES
THAT WERE SUPPLYING MOP
SINK. FIELD VERIFY
(E)FS-1
At
l
a
n
t
i
c
F
i
s
h
11
6
8
0
G
o
l
d
r
i
n
g
R
d
.
,
S
u
i
t
e
C
&
D
,
Ar
c
a
d
i
a
,
C
A
9
1
0
0
6
Sheet Title
Project Numbers
Date
Checked By
Drawn By
Key Plan N.T.S.
202309.03
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
Sheet Number
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
De
v
e
l
o
p
e
d
f
o
r
A
t
l
a
n
t
i
c
F
i
s
h
AG
E
N
C
Y
S
U
B
M
I
T
T
A
L
/
B
I
D
S
E
T
12
/
1
5
/
2
3
-
HACE INC, 2601 Walnut Ave., Suite A
Tustin, CA 92780
T.949.892.9732 E. hseo@haceinc.com
HOT AND COLD WATER
FLOOR PLAN
SCALE:
HOT AND COLD WATER FLOOR PLAN
1/8"=1'-0"
FS-1
FS-1
FS-1
(E)3-COMP-1
(E)HS-1
RELOCATED (E)MS-1
(E)FS-1
(E)FD-1
4"
C
W
V
(E)4"CWV
(E)3"V
(E)4"CWV
(E)3"V
(E
)
4
"
W
(E
)
4
"
W
(E
)
4
"
W
ABOVE FLOOR TYPE
2"W 2"W
(E
)
4
"
W
(E)4"S(E)4"S(E)4"S(E)4"S(E)4"S
(E) TOILET ROOM TO REMAIN
(E) TOILET ROOM TO REMAIN
(E)TP-1
2%SLOPE
2%
S
L
O
P
E
2%
S
L
O
P
E
4"
C
W
V
At
l
a
n
t
i
c
F
i
s
h
11
6
8
0
G
o
l
d
r
i
n
g
R
d
.
,
S
u
i
t
e
C
&
D
,
Ar
c
a
d
i
a
,
C
A
9
1
0
0
6
Sheet Title
Project Numbers
Date
Checked By
Drawn By
Key Plan N.T.S.
202309.03
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
Sheet Number
De
s
c
r
i
p
t
i
o
n
Da
t
e
Re
v
i
s
i
o
n
De
v
e
l
o
p
e
d
f
o
r
A
t
l
a
n
t
i
c
F
i
s
h
AG
E
N
C
Y
S
U
B
M
I
T
T
A
L
/
B
I
D
S
E
T
12
/
1
5
/
2
3
-
HACE INC, 2601 Walnut Ave., Suite A
Tustin, CA 92780
T.949.892.9732 E. hseo@haceinc.com
SOIL WASTE AND VENT
FLOOR PLANSCALE:
SOIL, WASTE AND VENT FLOOR PLAN
1/8"=1'-0"
SCALE:
TRAP PRIMER DETAIL
NOT TO SCALE 2
SCALE:
FLOOR SINK DETAIL
NOT TO SCALE 1