Loading...
HomeMy WebLinkAbout140 E Santa Clara St - 2023 - T.I. FOR EPITOMERX COMPOUND PHARMACYJune 6, 2024 12/11/23 Plan Check Correction 1A Ren. 11-30-2025 No. C-38027 2103 EPI STJ ARC C D 01/08/24 Plan Check Correction 2B 01/22/24 Plan Check Correction 3 05/02/24 Plan Check Correction 4 E 06/06/24 Plan Check Correction 5 SHEET INDEX PROJECT CONTACTS PROJECT SUMMARY Epitomerx Compound Pharmacy LEGAL DESCRIPTION: APPLICABLE CODES: CONSTRUCTION TYPE: OCCUPANCY GROUP: BUILDING TYPE: PROJECT DESCRIPTION: PROJECT ADDRESS: COVER SHEETG-001 A-101 ARCHITECT: OWNER: Type V-A (B) Business MH Architects Redondo Beach, CA 90278 Phone: 1.310.977.9779 Contact: Martin Hsieh 2511 185th Street ZONE:(DMU) Downtown Mixed Use SPRINKLERED: Epitomerx Compound Pharmacy 140 E Santa Clara Street, Suite 23, Arcadia, CA 91006 EpitomeRX Inc. Tenant Improvement (2,308 sq.ft.) in a Portion of Existing1-story Commercial Building. 1-story Commercial Building A-102 COVER SHEET G-001 TRACT PARCEL MAP AS PER BK 111 P 13-14 OF PM*(EXPOR TO SBE 804-19-24D PAR 2) LOT 2 APN. 5773-011-036 2022 CBC, 2022 CPC, 2022 CMC, 2022 CEC, 2022 CRC, 2022 CalGreen, 2022 Cal Energy Code, & Local Municipal Codes as adopted by the City of Arcadia Yes EXISTING / PROPOSED FLOOR PLAN & WINDOW / DOOR SCHEDULES BUILDING STATISTICS BUILDING AREA: COMPOUND PHARMACY (UNIT 23) AREA: (E) 140 E SANTA CLARA BUILDING TOTAL AREA:15,750 Sq. Ft. 2,308 Sq.Ft. SITE NaturalNAT. Concrete MaximumMAX. ArchitecturalARCH. MinimumMIN. MechanicalMECH. BetweenBTWN. ManufacturerMFR. BuildingBLDG. MicrowaveMICRO. BlockBLK. MetalMTL. BeamBM. NumberNO. ClearCLR. On CenterO.C. CeilingCLG. PlywoodPLYWD. ColumnCOL. CONC. RisersRIS. ContinuousCONT. Rough OpeningR.O. DryerDRY. Roof RaftersR.R. DiameterDIA. RevisionREV. Dimension(s)DIM. RefrigeratorREFR. DishwasherD.W. RequiredREQ'D. V.I.F. DrawingsDWGS. Sheet HDR. SHT. Elevation WASH. ELEV. SimilarSIM. EqualEQ. INT. SteelSTL. Existing(E) StructuralSTRUCT. Exterior F.J. EXT. Finish, FinishedFIN. TreadsTR. Tempered FloorFLR. Tongue & GrooveT.&G. FootingFT'G. Top ofT.O. GalvanizedGALV. TypicalTYP. GradeGRD. Unless Noted OtherwiseU.N.O. Gypsum BoardGYP. BD. Verify In Field HGT. Header Washer Interior WD. Height Wood Ceiling Joist Water Heater ABBREVIATIONS C.J. LEGEND W.H. Floor Joist New TEMP. FRZ. (N) Freezer Casement Slider CSMT. SL. G.D. Garbage Disposal F.A.U. Forced Air Unit AX.X X X XX AX.X AX.X # # # SEPARATE PERMITS NOTES: ITEMS DEFERRED FROM THE ORIGINAL BUILDING PLAN CHECK ARE REQUIRED TO HAVE A SEPARATE PLAN CHECK & PERMIT PRIOR TO INSTALLATION. EVERY PERMITSHALL HAVE SUFFICIENT DRAWINGS, DETAILS & SUPPORTING DATA TO STAND ON ITS OWN WITHOUT REFERENCE TO PREVIOUSLY APPROVED PLANS. IN ADDITION, THE ARCHITECT OR ENGINEER OF RECORD IS RESPONSIBLE FOR THE REVIEW &SUBMITTAL OF THE DEFERRED ITEMS & DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL & SHALL INDICATE TO THE BUILDING DEPARTMENT THAT THEY HAVE BEEN FOUND TO BE IN GENERAL COMPLIANCE WITH THE DESIGN OF THE BUILDING. PROVIDEA COMPLETE PACKAGE FOR SUBMISSION OF DEFERRED ITEMS. THESE ITEMS SHALL BE SUBMITTED & REVIEWED UNDER SEPARATE PERMIT APPLICATION FEES. CONTACTTHE CITY FOR SUBMISSION INSTRUCTIONS. CONCRETE MASONRY WALL NEW WALL SHEARWALL DOOR WINDOW DETAIL INTERIOR ELEVATIONS SECTION DIMENSION TO CENTER LINE DIMENSION TO FACE OF FRAMING/MASONRY (UNLESS NOTED OTHERWISE) SLOPE ELEVATION HEIGHTS Detail # Sheet # Room # Sheet # Sect. # Sheet # X X'-X" X'-X" X'-X" S_-2021SIGNAGE: VICINITY MAP SITE PLANA-001 ENLARGED FLOOR PLAN, REFLECTED CEILING PLAN, EXTERIOR ELEVATIONS MEP & T-24 ENERGY: Ishii Engineering Cypress, CA 90630 Phone: 1.714.236.0492 Contact: Cliff Ishii 5252 Orange Ave. Suite104 CLEANROOMMANUFACTURER: Travis Cleanair Loveland, CO 80537 Phone: 1.970.966.4339 Contact: Austin Lingenfelter 200 E 7th Street, Suite 204 GENERAL NOTES: 1. REPAIR PATCH & FINISH ALL GYPSUM BOARD (NEW AND EXISTING) AS REQUIRED TO BE READYFOR FINISH. 2. PATCH, REPAIR, AND/OR REPLACE EXISTING CONSTRUCTION IN AREA OF WORK, AS REQUIREDFOR A FINISHED APPEARANCE. 3. PROVIDE 20GA. STUDS AT ALL NEW DOOR JAMBS AND HEAD CONDITIONS. 4. CONTRACTOR TO FIELD VERIFY AND NOTIFY THE ARCHITECT OF ANY AND ALL DISCREPANCIES IN& DAYS PRIOR TO BID DUE DATE. 5. PROVIDE ALL DEMOLITION AS REQUIRED TO ACCOMMODATE NEW CONSTRUCTION. 6. OBTAIN TENANT & BUILDING MANAGER'S APPROVAL OF WALL CHAULKLINES PRIOR TOINSTALLATION OF BASE TRACKS. 7. ALL FLOORS SHALL BE LEVEL AND CLEAN PRIOR TO START OF WALL ERECTION. PATCH, REPAIRAND/OR REPLACE AS REQUIRED. 8. ALL DESIGN-BUILD CONTRACTORS TO COMPLY W/ ALL CODES & REGULATIONS. 9. ALL DESIGN-BUILD CONTRACTORS MUST SURVEY THE PROJECT SITE PRIOR TO START OFDESIGN WORK. ADVICE THE ARCHITECT & DAYS PRIOR TO BID, OF ANY DISCREPANCY WITHARCHITECT'S DRAWINGS. 10. ALL DIMENSIONS ARE TO FACE OF STUD UNLESS OTHERWISE NOTED. A-601 ARCHITECTURAL DETAILS M-000 COVER SHEET M-100 EQUIPMENT SCHEDULE, VENTILATION CALCULATIONS & AIR BALANCE CHART M-200 MECHANICAL PLANS M-201 MECHANICAL ROOF PLANS M-300 DETAILS M-301 EQUIPMENT CUTSHEETS P-000 COVER SHEET P-001 FIXTURE SCHEDULE P-100 EXISTING / DEMOLITION PLUMBING PLANS P-200 COLD & HOT WATER PLUMBING PLAN AND COLD & HOT WATER PLUMBING P-201 WASTE & VENT PLUMBING PLAN AND PLUMBING ROOF PLAN P-300 DETAILS P-301 REFERENCE DRAWINGS & DETAILS E-000 COVER SHEET E-200 EXISTING / DEMOLITION POWER PLAN & POWER PLAN E-201 PARTIAL EXISTING / DEMOLITION ELECTRICAL ROOF PLAN & ELECTRICAL E-300 EXISTING / DEMOLITION LIGHTING PLAN & LIGHTING PLAN E-400 PANEL SCHEDULES E-500 INDOOR LIGHTING TITLE 24 FORMS AND CALCULATIONS E-501 LIGHTING FIXTURE MANUFACTURER DATA SHEETS E-600 DETAILS PLAN CEILING SPACE ROOF PLAN & INTERIOR ELEVATIONS CR-1NP NEGATIVE SUITE CR-2NP NEGATIVE SUITE CR-1PP POSITIVE SUITE CR-2PP POSITIVE SUITE M-400 TITLE 24 ENERGY CALCULATIONS M-401 TITLE 24 ENERGY CALCULATIONS M-402 TITLE 24 ENERGY CALCULATIONS A-602 ARCHITECTURAL DETAILS S1.0 GENERAL NOTES & ABBREVIATIONS S2.0 PARTIAL FOUNDATION PLAN & DETAILS S2.1 PARTIAL ROOF FRAMING PLAN & DETAILS M-302 EQUIPMENT CUTSHEETS SCALE: 1/16" = 1'-0" Site Plan SITE PLAN A-001 June 6, 2024 12/11/23 Plan Check Correction 1A Ren. 11-30-2025 No. C-38027 2103 EPI STJ ARC C D 01/08/24 Plan Check Correction 2B 01/22/24 Plan Check Correction 3 05/02/24 Plan Check Correction 4 E 06/06/24 Plan Check Correction 5 N E E SCALE: 1/4" = 1'-0" Proposed Floor Plan EXISTING & PROPOSED FLOOR PLANS &WINDOW/ DOORSCHEDULES A-101 June 6, 2024 12/11/23 Plan Check Correction 1A Ren. 11-30-2025 No. C-38027 2103 EPI STJ ARC C D 01/08/24 Plan Check Correction 2B 01/22/24 Plan Check Correction 3 05/02/24 Plan Check Correction 4 E 06/06/24 Plan Check Correction 5 A NSCALE: 1/4" = 1'-0" Existing Floor Plan N E ENLARGED PLAN, R. CEILING PLAN EXTERIOR ELEV.,INTERIOR SECTION& ELEVATIONS A-102 June 6, 2024 12/11/23 Plan Check Correction 1A Ren. 11-30-2025 No. C-38027 2103 EPI STJ ARC C D 01/08/24 Plan Check Correction 2B 01/22/24 Plan Check Correction 3 05/02/24 Plan Check Correction 4 E 06/06/24 Plan Check Correction 5 NSCALE: 1/4" = 1'-0" Reflected Ceiling Plan SCALE: 3/8" = 1'-0" Interior Elevations SCALE: 1/4" = 1'-0" West Elevation SCALE: 1" = 1'-0" Enlarged Floor Plan A SCALE: 3/8" = 1'-0" Section A E E SCALE: 3" = 1'-0" SCALE: NTSSCALE: NTS A - WIRE TIE AND TIE SPACING DETAIL B - CEILING GRID DETAIL SCALE: N.T.S RESTROOM SCALE: 6"=1'-0" Grab Bar H.C. Lavatory SCALE: 3/4"=1'-0"SCALE: 3/8"=1'-0" Fixture Mounting Heights SCALE: 3/8"=1'-0" Accessory Mounting Heights SCALE: 3/4"=1'-0"SCALE: N.T.SSCALE: N.T.S SCALE: N.T.SSCALE: 1/2"=1'-0" June 6, 2024 12/11/23 Plan Check Correction 1A Ren. 11-30-2025 No. C-38027 2103 EPI STJ ARC C D 01/08/24 Plan Check Correction 2B 01/22/24 Plan Check Correction 3 05/02/24 Plan Check Correction 4 E 06/06/24 Plan Check Correction 5 16 ARCHITECTURAL DETAILS A-601 17 9 10 19 7 20 6 1 11 12 1514 SCALE: NTS 5 SCALE: 3/8"=1'-0" Detectable Warning Tile SCALE: N.T.S Handicapped Van Parking Sign SCALE: 1/8" = 1' - 0"- June 6, 2024 12/11/23 Plan Check Correction 1A Ren. 11-30-2025 No. C-38027 2103 EPI STJ ARC C D 01/08/24 Plan Check Correction 2B 01/22/24 Plan Check Correction 3 05/02/24 Plan Check Correction 4 E 06/06/24 Plan Check Correction 5 ARCHITECTURAL DETAILS A-602 16 17 18 SCALE: NTS 431 76 11 12 ACRYLIC EXHAUST 12" COLLAR (116" AFF) Revisions Facility Project Sheet Title Building ID:Floor Lev:Section: Scale Drwn By Chckd By Issue Date Permit No. Sheet Of Sheets Architect/Engineer Of Record: NO DESCRIPTION DATE As indicated BC JR EPITOME RX ARCADIA, CA NEGATIVE SUITEPROJECT NUMBER: 4245 1ST FLOOR C O N S T R U C T I O N D O C U M E N T S Dec 8, 2023 A Plan Check Corrections 03/15/2024 CR-1NP LEGEND: FW: FULL WHITE OPAQUE ACRYLIC BW: BOTTOM WHITE OPAQUE ACRYLICSP: SINK PANEL ND: NON-DEDICATED RECEPTACLE D#: DEDICATED RECEPTACLE L#: 2X4 LED LIGHT, 120V M: MAGNEHELIC (MAY BE POSITIVE OR NEGATIVE) TO REFLECT ROOM PRESSURE OUTLET TEL / DATA SWITCH 2 4 D-WALL ELEVATION 1/4" = 1'-0" 3 C-WALL ELEVATION 1/4" = 1'-0" 2 B-WALL ELEVATION 1/4" = 1'-0" 1 A-WALL ELEVATION 1/4" = 1'-0" ND ND ND NDND ND ND @ 29-1/2" ND ND ND ND ND ND ND ND NEGATIVEPRESSURE GENERAL ND Mx1 8 CLEAN ROOM - ELECTRIC 1/4" = 1'-0" 9 CLEAN ROOM - AIRFLOW 1/4" = 1'-0" NEGATIVE PRESSURE (1,382 CUFT) ~15 ACPH ~-.01 to -.03 NEG NSH TO OUT TO O U T S I D E 18 " G R I L L E ~3 5 0 C F M 14" VENT 14" VENT~350 CFM GENERAL (1,014 CUFT) Owner’s Requirements (Not Provided with Room) Mechanical Notes 1. Non-sterile Hazardous cleanrooms must be exhausted to the outside at a minimum of 12 air changes per hour and read -0.01 to -0.03 on the room's magnehelic gauge. 2. Vents with opposed blade dampers are furnished to allow pressure to be controlled in and between rooms. 3. The room has been supplied with a magnehelic gauge near the entrance. A Tubing diagram has been provided to depict how the magnehelics are installed by TCA. 4. The attached Air Flow Diagram is illustrative. Owner’s mechanical engineer/contractor shall determine the proper placement of all supply. 1. Owner’s mechanical contractor shall engineer, furnish and install all ductwork to the FFU’s, exhausts and returns as well as any AHU’s for space conditioning. 2. Owner’s mechanical contractor shall engineer, furnish and install all required ductwork for any hoods that are installed in the clean room suite. Contractor shall make and seal any penetrations made in the ceiling tiles to accommodate the ductwork. 3. Owner’s mechanical contractor shall balance the HVAC system, as required.Any required air flows will be designated on the Air Flow 1. The clean room suite is designed to accommodate electrical receptacles in the wall columns. Dedicated 15-20A receptacles to service hoods (verify equipment requirements with manufacturer) and non-dedicated receptacles for other equipment and services have been provided. A flush mounted 3”x2”x2 ¾” deep switch box with a ¾” EMT conduit stubbed above thesidewall has been provided for each location. 2. A separate flush mounted 3”x2”x2 ¾” deep switch box with a ¾“ EMT conduit stubbed above the sidewall has been provided near the main door to the clean room suite for use to control the lightsin the suite. 3. Provisions for installing communications/data into the clean room suite have been provided. A flush mounted 3”x2”x2 ¾” deep switch box with a ¾” EMT conduit stubbed above the sidewall has been provided for each location. A blank cover will be installed over the switch box. 4. Lights provided are universal voltage (120-277V), 0-10V 10% dimmable, LED fixtures. The fixtures are powder coated white. 5. Digital Monitoring System (if supplied with clean room suite) consists of a PLC/HMI unit in a cabinet mounted near the main door and a Digital Space Monitor (DSM) cabinet for each room inthe clean room suite. Communications between the cabinets and fan filter units (if control issupplied) is through supplied plenum rated CAT5e cables. The system will be installed per theattached wiring diagram, except for the 120V power supply which shall be furnished and installed by others. Connection to a Building Management System shall be by Owner’s contractor. 6. Automatic Doors (if supplied with clean room suite) consist of ASSA ABLOY SW100 Low Energy Swing Door Operators with BEA MS11 Adjustable Range, Stainless Steel Touchless Actuators. Door operators are interconnected so only one door may be opened at a time. 1. Owner’s electrician shall engineer, furnish, and install all wiring and receptacles for each outlet. Owner’s electrician shall seal all electrical covers using a silicone caulk equivalent to C.R. Laurence Co. – 33SC caulk. Electrical system shall be sized to handle proposed equipment andshall meet all federal, state, and local requirements. 2. Owner’s electrician shall engineer, furnish, and install all wiring and switches for the lightingsystem. Owner’s electrician shall seal all electrical covers using a silicone caulk equivalent toC.R. Laurence Co. – 33SC caulk. Lights shall be wired to meet all federal, state, and localrequirements. 3. Owner’s electrician shall engineer, furnish, and install a dedicated 120V circuit to the Digital Monitoring System (if supplied with clean room suite). 4. Owner’s electrician shall engineer, furnish, and install all data and communications systems. Owner’s electrician shall seal all electrical covers using a silicone caulk equivalent to C.R. Laurence Co. – 33SC caulk. 5. Owner’s electrician shall engineer, furnish, and install 120V power wiring for the automatic door operators (if supplied with clean room. Electrical Notes Owner’s Requirements (Not Provided with Room) 8'-4 1/2" A.F.F. T / FRAME 0'-0" A.F.F. T / FIN. FLOOR 8'-0" A.F.F. B / CLEANROOM FIN. CEILING 9'-3/8" A.F.F. T / DSM 9'-8" A.F.F. T / PLENUM 8'-4 1/2" A.F.F. T / FRAME 0'-0" A.F.F. T / FIN. FLOOR 8'-0" A.F.F. B / CLEANROOM FIN. CEILING 9'-3/8" A.F.F. T / DSM 9'-8" A.F.F. T / PLENUM 8'-4 1/2" A.F.F. T / FRAME 0'-0" A.F.F. T / FIN. FLOOR 8'-0" A.F.F. B / CLEANROOM FIN. CEILING 9'-3/8" A.F.F. T / DSM 9'-8" A.F.F. T / PLENUM 8'-4 1/2" A.F.F. T / FRAME 0'-0" A.F.F. T / FIN. FLOOR 8'-0" A.F.F. B / CLEANROOM FIN. CEILING 9'-3/8" A.F.F. T / DSM 9'-8" A.F.F. T / PLENUM 6 CLEAN ROOM - R.C.P. 1/4" = 1'-0" NEGATIVE PRESSURE L1 L2 L3 GENERAL DSM 5 CLEAN ROOM - FLOOR PLAN 1/4" = 1'-0" CR-1NP 1 CR-1NP 3 CR-1NP 4 C D A FW FW FW BW BW CL 42" DOOR 116" AFF ACRYLICEXHAUST CR-1NP 2 VE N T 42" DOOR FW FW FW FW FW FW FW S P FW S P FW FWFW 12'-0" BW VE N T CL CL CL 24" PASSTHRU w/INTERLOCK B BW FW SINK (OTHERS) SINK (OTHERS) 11 ' - 1 0 " NEGATIVE PRESSURE (8'-0", 1,382 CUFT) GENERAL (8'-0", 1,014 CUFT) E 16 ' - 2 " 28 ' - 0 " Architectural Notes Owner’s Requirements (Not Provided with Room) Plumbing and Fire Protection Notes 1. Doors are 42” x 84” narrow style (unless specified otherwise), 1-3/4” thick, with offset pivots, MS lock (keyed outside and ADA thumb turn inside), classic style push/pull handle, and glazed with .220” thick acrylic or polycarbonate glazing. ACRYLITE sheet self-ignition temperature (ASTM D-1929) is 850°F (455°C), smoke density as measured by ASTM D2843 is 6.4%, and the rate of burning as measured by ASTM D-635 is 1.0 in/min (25mm/min) for 1/8” (3mm) thick sheet. 2. Door closers are size 4, grade 1, hydraulic with back check. 3. Wall panels are constructed out of microbial resistant, powder painted, extruded aluminum shapes and .220” thick acrylic sheets glazed with rubber seals on both sides. Walls are 4-1/2” thick. ACRYLITE sheet self-ignition temperature (ASTM D-1929) is 850°F (455°C), smoke density as measured by ASTM D2843 is 6.4%, and the rate of burning as measured by ASTM D-635 is 1.0 in/min (25mm/min) for 1/8” (3mm) thick sheet. 4. Ceilings are fabricated from microbial resistant, powder painted, extruded aluminum shapes and CRF vinyl finished,clean room rated ceiling tiles. Tiles will be caulked in place. CertainTeed Envirogard Ceiling Tiles ASTM E1264 -Class A rating 5. Floors are not included in contract but can be made of different components. If vinyl floor is used it shall be installed after the cleanroom is installed and coved up the wall. Vinyl floor shall be seamless, if seams exists they shall be heat welded. If epoxy floor is used it is necessary for the floor to be installed prior to the installation of the cleanroom so the cleanroom can sit on top of it. 1. Owner is responsible for installing all equipment in the cleanroom suite unless specified otherwise. If openings in the clean room envelope are required (e.g. hood exhausts), Owner is responsible for ensuring the seal around the openings. TCA will discuss with Owner whether ceiling tiles will be left out to allow trades to complete their workabove the ceiling. Additional ceiling tiles and caulking material may be left for Owner’s contractors to use to seal theroom. 2. Owner’s contractor shall design, furnish and install any required soffit to close the space between the clean room suiteand the building. 3. Owner’s flooring contractor shall furnish and install the flooring to meet all USP 797/800 requirements. 4. Owner’s mechanical contractor shall design, furnish and install all fixtures (sink/hardware) and piping required for sinks, including escutcheon plates around all piping penetrations in clean room walls. Escutcheon plates shall besilicon caulked into place. 5. Owner’s fire protection contractor shall design, furnish and install the fire protection system for the clean room suite, as required. All sprinkler heads shall be of the concealed design. Contractor shall be responsible for all ceiling penetrations and seals. 1. Provisions have been made in a wall panel, if required, for a sink to be mounted in the cleanroom suite by Owner’s mechanical contractor. Sewer and hot/cold water piping should be plumbed 8” – 12” out from adjacent walls to allowthe installation of the clean room suite. A centerline measurement has been provided to locate the required plumbing.A 35-3/4" wide x 48" high x 1/4" thick aluminum plate has been provided to mount the sink. Holes to mount the sinkshould be drilled and tapped into the aluminum plate. 2. All sewers shall be located outside the clean room. 7 ARCHITECTURAL NOTES 1/4" = 1'-0" DSM PLENUM DSM PLENUM DSMPLENUM DSMPLENUM CR-2NP13 CR-2NP12 ALUMINUMALLOY ACRYLIC PANEL TYP. TYP. 2 2 1 3 4 CR-2NP13 CR-2NP12 TYP. TYP. Fail-Safe CLM 2x4 LD4 LED lighting CR-2NP14 CR-2NP14 11 WALL PROFILES: A-WALL INTERIOR 1/4" = 1'-0" 16 WALL PROFILES: A-WALL EXTERIOR 1/4" = 1'-0" 12 WALL PROFILES: B-WALL INTERIOR 1/4" = 1'-0" 13 WALL PROFILES: C-WALL INTERIOR 1/4" = 1'-0" 17 WALL PROFILES: B-WALL EXTERIOR 1/4" = 1'-0" 14 WALL PROFILES: D-WALL INTERIOR 1/4" = 1'-0" 18 WALL PROFILES: C-WALL EXTERIOR 1/4" = 1'-0" 19 WALL PROFILES: D-WALL EXTERIOR 1/4" = 1'-0" 15 WALL PROFILES: E-WALL GENERAL SIDE 1/4" = 1'-0" 20 WALL PROFILES: E-WALL NEGATIVE SIDE 1/4" = 1'-0" 12" 40" 116" 1612"1612" 96" 116" 96" 40" 96" 45" 1612"1612" 40" 1612" 45"40" 40" 96" 45"45"40"40" 96" 96" 1612"1612" 96" 116" 116" 96" 5534"5534" 1612" 45" 1612" 5534" 1612" 5534" 1612" 45" 1612" 96" 1612" 40" 40"2912" 96" PLENUM PLENUM PL E N U M PL E N U M 10 WALL PROFILE REFERENCE 1/4" = 1'-0" CR-2NP 3 CR-2NP 7 CR-2NP 10 C D A FW FW FW BW BW CL 42" DOOR 116" AFF ACRYLIC EXHAUST VE N T 42" DOOR FW FW FW FW FW FW FW S P FW S P FW FWFW 12'-0" BW VE N T CL CL CL 24" PASSTHRU w/INTERLOCK BW FW SINK (OTHERS) SINK(OTHERS) 11 ' - 1 0 " CR-2NP 6 NEGATIVE PRESSURE (8'-0", 1,382 CUFT) GENERAL (8'-0", 1,014 CUFT) CR-2NP 5 CR-2NP 2 CR-2NP 8 CR-2NP 4 CR-2NP 11 CR-2NP 9 16 ' - 2 " 28 ' - 0 " E 1612"1612" Revisions Facility Project Sheet Title Building ID:Floor Lev:Section: Scale Drwn By Chckd By Issue Date Permit No. Sheet Of Sheets Architect/Engineer Of Record: NO DESCRIPTION DATE As indicated BC JR EPITOME RXARCADIA, CA NEGATIVE SUITE PROJECT NUMBER: 4245 1ST FLOOR C O N S T R U C T I O N D O C U M E N T S Dec 8, 2023 A Plan Check Corrections 03/15/2024 CR-2NP LEGEND: FW: FULL WHITE OPAQUE ACRYLIC BW: BOTTOM WHITE OPAQUE ACRYLIC SP: SINK PANEL ND: NON-DEDICATED RECEPTACLE D#: DEDICATED RECEPTACLE L#: 2X4 LED LIGHT, 120V M: MAGNEHELIC (MAY BE POSITIVE OR NEGATIVE) TO REFLECT ROOMPRESSURE OUTLET TEL / DATA SWITCH 2 514" 412" 412" 514" 412" NARROW WALL POST TYP GAUGE: .078 MATERIAL: 6063-T6 CORNER POST TYP GAUGE: .125 MATERIAL: 6063-T6 WALL POST TYP GAUGE: .095 MATERIAL: 6063-T6 12 WALL POST DETAILS 1/2" = 1" 134" 412" INTERIOR PANEL SIDE TYP GAUGE: .060 MATERIAL: 6063-T6 INTERIOR PANEL SIDE TYP GAUGE: .060 MATERIAL: 6063-T6 INTERIOR PANEL SIDE TYP GAUGE: .060MATERIAL: 6063-T6 13 CEILING ANCHOR DETAILS 1/2" = 1" 0.22" THICK ACRYLIC ISO VIEW NOT TO SCALE 0'-214" 0' - 4 12" 0' - 1 34" 0' - 6 14"CEILINGTILE 100% SILICONE CAULK 1X1X1/8" L-ANGLE 3/4" PAN HEAD SCREW 2x2x1/8" L-ANGLE 3/4" FLAT HEAD SCREWS TOP OFWALL PANEL 3/4" PAN HEAD SCREW FLAT HEAD SCREWSSTAGGERD EVERY 12" STRAIGHT STOP TYPGAUGE: .060 MATERIAL: 6063-T6 CEILING TYP GAUGE: .078 MATERIAL: 6063-T5 WALL HEADER TYP GAUGE: .090 MATERIAL: 6063-T6 0.22" THICK ACRYLIC EXPANSIONANCHOR 3/8" x 3" 2 PER PANELOPPOSITE ENDS 0' - 1 34" 0' - 5 34"0' - 7 12" 0'-412" 0.889" COVE FORMERCAPPING STRIP (OTHERS) COVE FORMER (OTHERS) 2mm THICK VINYL FLOORING (OTHERS) COVABLE BASE TYPGAUGE: .110 MATERIAL:6063-T6 ISO VIEW NOT TO SCALE WALL FOOTER TYP GAUGE: .095MATERIAL: 6063-T6 ANGLED STOP TYP GAUGE: .050 MATERIAL: 6063-T6 6" MAX TYP 6" STAGGER, TYP 3' - 1 1 1 / 2 " M A X PA N E L W I D T H HILTI KB-TZ AT PANEL < 2'-0" HILTI KB-TZ AT PANEL > 2'-0" VERT. MULLION POST HORIZ MULLIONBASE TRACK 14 WALL ANCHOR DETAILS 1/2" = 1" (4) 3/8" DIA. X 2" EMBED (2) 3/8" DIA. X 2" EMBED AHU RETURN AIR (SOURCED OUTSIDECLEANROOM SUITE) AC SUPPLY 4 D-WALL ELEVATION 1/4" = 1'-0" 3 C-WALL ELEVATION 1/4" = 1'-0" 2 B-WALL ELEVATION 1/4" = 1'-0" 1 A-WALL ELEVATION 1/4" = 1'-0" 8'-4 1/2" A.F.F. T / FRAME 0'-0" A.F.F. T / FIN. FLOOR 8'-0" A.F.F. B / CLEANROOM FIN. CEILING 9'-3/8" A.F.F. T / DSM 9'-8" A.F.F. T / PLENUM 6 CLEAN ROOM - R.C.P. 1/4" = 1'-0" 5 CLEAN ROOM - FLOOR PLAN 1/4" = 1'-0" L1CR-1PP 4 9'-8 1/4" A.F.F. T / HEPA 8'-4 1/2" A.F.F. T / FRAME 0'-0" A.F.F. T / FIN. FLOOR 8'-0" A.F.F. B / CLEANROOM FIN. CEILING 9'-3/8" A.F.F. T / DSM 9'-8" A.F.F. T / PLENUM 9'-8 1/4" A.F.F. T / HEPA 8'-4 1/2" A.F.F. T / FRAME 0'-0" A.F.F. T / FIN. FLOOR 8'-0" A.F.F. B / CLEANROOM FIN. CEILING 9'-3/8" A.F.F. T / DSM 9'-8" A.F.F. T / PLENUM 9'-8 1/4" A.F.F. T / HEPA 8'-4 1/2" A.F.F. T / FRAME 0'-0" A.F.F. T / FIN. FLOOR 8'-0" A.F.F. B / CLEANROOM FIN. CEILING 9'-3/8" A.F.F. T / DSM 9'-8" A.F.F. T / PLENUM 9'-8 1/4" A.F.F. T / HEPA HEPAHEPAHEPAPLENUMDSMx2 PLENUM HEPA HEPA DSMx2 HEPAHEPAPLENUM DSMx2 HEPAHEPA PLENUM DSMx2 16'-6"13'-6" 12 ' - 0 " 30'-0" A C D BE ISO 7POSITIVE PRESSURECLEANROOM (8'-0", 1,412 CUFT) ISO 8 POSITIVE PRESSUREANTE ROOM (8'-0", 1,164 CUFT) FWFW SP FW FW FW FW FW FW FW FW FW FWFW FW FW BW BW BW F W FW FW CLCLCLCLCLCLCL 24" PASSTHRUw/INTERLOCK SINK (OTHERS) VENT VE N T 116" AFF ACRYLIC RETURN DMS 42" DOOR 42 " D O O R L2 L3 L4 H1 H2 H3 DSMx2 ISO 7POSITIVE PRESSURECLEANROOM ISO 8POSITIVE PRESSUREANTE ROOM Architectural Notes Owner’s Requirements (Not Provided with Room) Plumbing and Fire Protection Notes 1. Doors are 42” x 84” narrow style (unless specified otherwise), 1-3/4” thick, with offset pivots, MS lock (keyed outside and ADA thumb turn inside), classic style push/pull handle, and glazed with.220” thick acrylic or polycarbonate glazing. ACRYLITE sheet self-ignition temperature (ASTM D-1929) is 850°F (455°C), smoke density as measured by ASTM D2843 is 6.4%, and the rate of burning as measured by ASTM D-635 is 1.0 in/min (25mm/min) for 1/8” (3mm) thick sheet. 2. Door closers are size 4, grade 1, hydraulic with back check. 3. Wall panels are constructed out of microbial resistant, powder painted, extruded aluminum shapes and .220” thick acrylic sheets glazed with rubber seals on both sides. Walls are 4-1/2” thick. ACRYLITE sheet self-ignition temperature (ASTM D-1929) is 850°F (455°C), smoke density as measured by ASTM D2843 is 6.4%, and the rate of burning as measured by ASTM D-635 is 1.0 in/min (25mm/min) for 1/8” (3mm) thick sheet. 4. Ceilings are fabricated from microbial resistant, powder painted, extruded aluminum shapes and CRF vinyl finished, clean room rated ceiling tiles. Tiles will be caulked in place. CertainTeed Envirogard Ceiling Tiles ASTM E1264 - Class A rating 5. Floors are not included in contract but can be made of different components. If vinyl floor is used it shall be installed after the cleanroom is installed and coved up the wall. Vinyl floor shall beseamless, if seams exists they shall be heat welded. If epoxy floor is used it is necessary for the floor to be installed prior to the installation of the cleanroom so the cleanroom can sit on top of it. 6. Cleanroom trim constructed out of microbial resistant, powder painted, extruded aluminum will be installed on all visible sides of the cleanroom suite. If an additional soffit is required to 1. Owner is responsible for installing all equipment in the cleanroom suite unless specified otherwise. If openings in the clean room envelope are required (e.g. hood exhausts), Owner is responsiblefor ensuring the seal around the openings. TCA will discuss with Owner whether ceiling tiles will be left out to allow trades to complete their work above the ceiling. Additional ceiling tiles andcaulking material may be left for Owner’s contractors to use to seal the room. 2. Owner’s contractor shall design, furnish and install any required soffit to close the space between the clean room suite and the building. 3. Owner’s flooring contractor shall furnish and install the flooring to meet all USP 797/800 requirements. 4. Owner’s mechanical contractor shall design, furnish and install all fixtures (sink/hardware) and piping required for sinks, including escutcheon plates around all piping penetrations in clean room walls. Escutcheon plates shall be silicon caulked into place. 5. Owner’s fire protection contractor shall design, furnish and install the fire protection system for the clean room suite, as required. All sprinkler heads shall be of the concealed design. Contractor shall be responsible for all ceiling penetrations and seals. 1. Provisions have been made in a wall panel, if required, for a sink to be mounted in the cleanroom suite by Owner’s mechanical contractor. Sewer and hot/cold water piping should be plumbed 8” – 12” out from adjacent walls to allow the installation of the clean room suite. A centerline measurement has been provided to locate the required plumbing. A 35-3/4" wide x 48" high x 1/4" thick aluminum plate has been provided to mount the sink. Holes to mount the sink should be drilled and tapped into the aluminum plate. 2. All sewers shall be located outside the clean room. Owner’s Requirements (Not Provided with Room) Electrical Notes 1. The clean room suite is designed to accommodate electrical receptacles in the wall columns. Dedicated 15-20A receptacles to service hoods (verify equipment requirements with manufacturer) and non-dedicated receptacles for other equipment and services have been provided. A flush mounted 3”x2”x2 ¾” deep switch box with a ¾” EMT conduit stubbed above the sidewall has been provided for each location. 2. A separate flush mounted 3”x2”x2 ¾” deep switch box with a ¾“ EMT conduit stubbed above the sidewall has been provided near the main door to the clean room suite for use to control the lightsin the suite. 3. Provisions for installing communications/data into the clean room suite have been provided. A flush mounted 3”x2”x2 ¾” deep switch box with a ¾” EMT conduit stubbed above the sidewall hasbeen provided for each location. A blank cover will be installed over the switch box. 4. Lights provided are universal voltage (120-277V), 0-10V 10% dimmable, LED clean room Class 100 rated fixtures. The fixtures are powder coated white. 5. Fan Filter Units (HEPA’s) operate Full-Load Amps: 115V/60Hz/1 Ph = 3.0A (Standard); 208-240V/50/60 Hz/1 Ph = 1.5A (Special Order); 277V/60 Hz/ 1 Ph = 1.2A (Special Order). Units should always remain on. 6. Digital Monitoring System (if supplied with clean room suite) consists of a PLC/HMI unit in a cabinet mounted near the main door and a Digital Space Monitor (DSM) cabinet for each room in the clean room suite. Communications between the cabinets and fan filter units (if control is supplied) is through supplied plenum rated CAT5e cables. The system will be installed per the attached wiring diagram, except for the 120V power supply which shall be furnished and installed by others. Connection to a Building Management System shall be by Owner’s contractor. 7. Automatic Doors (if supplied with clean room suite) consist of ASSA ABLOY SW100 Low Energy Swing Door Operators with BEA MS11 Adjustable Range, Stainless Steel Touchless 1. Owner’s electrician shall engineer, furnish, and install all wiring and receptacles for each outlet. Owner’s electrician shall seal all electrical covers using a silicone caulk equivalent to C.R. Laurence Co. – 33SC caulk. Electrical system shall be sized to handle proposed equipment and shall meet all federal, state, and local requirements. 2. Owner’s electrician shall engineer, furnish, and install all wiring and switches for the lighting system. Owner’s electrician shall seal all electrical covers using a silicone caulk equivalent to C.R. Laurence Co. – 33SC caulk. Lights shall be wired to meet all federal, state, and local requirements. 3. Owner’s electrician shall engineer, furnish, and install all wiring for the Fan Filter Units (HEPA’s). It is recommended that units be wired directly back to a circuit breaker in the electrical panel.Units shall be wired to meet all federal, state, and local requirements. 4. Owner’s electrician shall engineer, furnish, and install a dedicated 120V circuit to the Digital Monitoring System (if supplied with clean room suite). 5. Owner’s electrician shall engineer, furnish, and install all data and communications systems. Owner’s electrician shall seal all electrical covers using a silicone caulk equivalent to C.R. Laurence Co. – 33SC caulk. 6. Owner’s electrician shall engineer, furnish, and install 120V power wiring for the automatic door operators (if supplied with clean room suite). Owner’s electrician shall furnish and install Mx2 D1 D2 ND ND NDNDNDNDND ND ND ND ND 7 CLEAN ROOM - ELECTRIC 1/4" = 1'-0" 8 CLEAN ROOM - AIRFLOW 1/4" = 1'-0" POSITIVE PRESSURE ANTE (1,164 CUFT)~36 ACPH>.02 POS ANTE TO OUT POSITIVE PRESSURE CLEANROOM (1,412 CUFT)~51 ACPH>.02 POS CR TO ANTE 420 CFM 360 CFM 360 CFM ~ 280 CFM ~ 240 CFM ~ 240 CFM 18" GRILLE~760 CFM 22 " V E N T ~1 , 1 4 0 C F M 22" VENT~1,200 CFM Mechanical Notes Owner’s Requirements (Not Provided with Room) 1. The clean room suite has been designed so that positive pressure rooms are maintained at 0.02 InWC or greater and negative pressure rooms are maintainedbetween -0.01 to -0.03 InWC. 2. Non-sterile Hazardous cleanrooms must be exhausted to the outside at a minimum of 12 air changes per hour. 3. Fan Filter Units (FFU’s - HEPA’s) have adjustable speed settings. AJ Manufacturing 2’x4’ Criti-Clean Ultra units have a speed setting button and value display on the room side of the unit. The fan speed is set either by using the up or down buttons or from the Digital Monitoring System (if supplied with clean room suite). Design airflows will be designated on the Air Flow Diagram. Airflow values are approximate. 4. FFU’s are furnished with a collar adapter to connect to the building HVAC system. The FFU’s sponge pre-filter has been removed from the unit. If a single collar adapter is furnished, it should be connected to the Owner furnished A/C supply via a balance damper system. If a double collar adapter is furnished, one collar should be connected to the Owner furnished A/C supply via a balance damper system and the other should be connected to the furnished clean room return plenum (a balance damper is not required on this line). Collar sizes will be designated on the Air Flow Diagram. 5. If the cleanroom suite is supplied with a Return Plenum (normally located in the Ante Room), it is designed to recycle a portion of the conditioned air back tothe FFU’s to reduce the required sizing of the air handling unit (AHU) supplying the suite. If the cleanroom suite is supplied with a Return Plenum, it should beducted back to each FFU (as shown on the Air \ Flow Diagram) using rigid duct to reduce resistance in the ductwork. 6. A separate (AHU), supplied by others, is recommended for all cleanroom suites to adequately control the suite temperature. The AHU should be designed to keep the suite at 68°F, or less (due to gowning requirements of personnel), year-round. The thermostat for the AHU should be installed in the Ante Room (on the dirty side of the Line of Demarcation (LOD)).The AHU should be controlled to always be running (not in auto). 7. Vents with opposed blade dampers are furnished to allow pressure to be controlled in and between rooms. 8. Each room in the clean room suite has been supplied with a magnehelic gauge near the entrance to the clean room suite. Pressure differentials between rooms are also displayed and recorded by the Digital Monitoring System, if supplied with clean room suite. A Tubing diagram has been provided to depict how the magnehelics and Digital Monitoring System, if provided, are installed by TCA. 1. Owner’s mechanical contractor shall engineer, furnish, and install all ductwork to the FFU’s, exhausts and returns as well as any AHU’s for space conditioning. 2. If supplied with clean room suite, returns shall be ducted to each FFU. Connection sizes and airflows will be designated on the Air Flow Diagram. 3. If supplied with clean room suite, exhausts shall be ducted to the outside meeting all applicable federal, state and local codes. Owner’s mechanical contractorshall engineer, furnish, and install an exhaust fan to ensure the specified air flow is achieved. 4. Owner’s mechanical contractor shall furnish and install all controls for the AHU that supplies air to the clean room suite. 5. Owner’s mechanical contractor shall engineer, furnish, and install all required ductwork for any hoods that are installed in the clean room suite. Contractor shallmake and seal any penetrations made in the clean room ceiling tiles to accommodate the ductwork. 6. Owner’s mechanical contractor shall balance the HVAC system, as required. The required air flows will be designated on the Air Flow Diagram. 700 CFMH1 10" 10" 10" 10" H2 H3 10"10"10" 10"10" 600 CFM 600 CFM CR-1PP 1 CR-1PP 2 CR-1PP 3 ISO 7 POSITIVE PRESSURE CLEANROOM ISO 8 POSITIVE PRESSURE ANTE ROOM Facility Project Sheet Title Building ID:Floor Lev:Section: Scale Drwn By Chckd By Issue Date Permit No. Sheet Of Sheets Architect/Engineer Of Record: As indicated BC JR EPITOME RX ARCADIA, CA POSITIVE SUITEPROJECT NUMBER: 4245 1ST FLOOR C O N S T R U C T I O N D O C U M E N T S Dec 8, 2023 CR-1PP LEGEND: FW: FULL WHITE OPAQUE ACRYLIC BW: BOTTOM WHITE OPAQUE ACYLIC SP: SINK PANEL ND: NON-DEDICATED RECEPTICAL D#: DEDICATED RECEPTACLE L#: 2X4 LED LIGHT, 120V H#: 2X2 OR 2X4 HEPA FILTER FAN FILTER UNIT, ¼ TO ⅓ HP, 120V, 3.0A (208-240V OR 277V AVAILABLE W/ 6 WEEK NOTICE) M: MAGNEHELIC (MAY BE POSITIVE OR POSITIVE AND NEGATIVE) TO REFLECT ROOM PRESSURELOD: LINE OF DEMARCATIONOUTLET TEL/DATA SWITCH120v POWER 2 Revisions NO DESCRIPTION DATE A Plan Check Corrections 03/15/2024 1 3 2 CR-2PP13 CR-2PP12 TYP. TYP. ALUMINUMALLOY ACRYLICPANEL Fail-Safe CLM 2x4 LD4 LED lighting 4 PLENUM CR-2PP14 Facility Project Sheet Title Building ID:Floor Lev:Section: Scale Drwn By Chckd By Issue Date Permit No. Sheet Of Sheets Architect/Engineer Of Record: As indicated BC JR EPITOME RX ARCADIA, CA POSITIVE SUITEPROJECT NUMBER: 4245 1ST FLOOR C O N S T R U C T I O N D O C U M E N T S Dec 8, 2023 CR-2PP LEGEND: FW: FULL WHITE OPAQUE ACRYLIC BW: BOTTOM WHITE OPAQUE ACYLIC SP: SINK PANEL ND: NON-DEDICATED RECEPTICAL D#: DEDICATED RECEPTACLE L#: 2X4 LED LIGHT, 120V H#: 2X2 OR 2X4 HEPA FILTER FAN FILTER UNIT, ¼ TO ⅓ HP, 120V, 3.0A (208-240V OR 277V AVAILABLE W/ 6 WEEK NOTICE) M: MAGNEHELIC (MAY BE POSITIVE OR POSITIVE AND NEGATIVE) TO REFLECT ROOM PRESSURELOD: LINE OF DEMARCATIONOUTLET TEL/DATA SWITCH120v POWER 2 10 WALL PROFILE REFERENCE 1/4" = 1'-0" CR-2PP 19 16'-6"13'-6" 12 ' - 0 " 30'-0" A C D B E ISO 7 POSITIVE PRESSURE CLEANROOM (8'-0", 1,412 CUFT) ISO 8 POSITIVE PRESSURE ANTE ROOM (8'-0", 1,164 CUFT) FWFW SP FW FW FW FW FW FW FW FW FW FWFW FW FW BW BW BW F W FW FW CLCLCLCLCLCLCL 24" PASSTHRU w/INTERLOCK SINK (OTHERS) VENT VE N T 116" AFFACRYLICRETURN DMS 42" DOOR 42 " D O O R CR-2PP 16 CR-2PP 17 CR-2PP 18 CR-2PP 12 CR-2PP 13 CR-2PP 14 CR-2PP 11 CR-2PP 20 CR-2PP 15 11 WALL PROFILES: A-WALL INTERIOR 1/4" = 1'-0" 16 WALL PROFILES: A-WALL EXTERIOR 1/4" = 1'-0" 12 WALL PROFILES: B-WALL INTERIOR 1/4" = 1'-0" 17 WALL PROFILES: B-WALL EXTERIOR 1/4" = 1'-0" 13 WALL PROFILES: C-WALL INTERIOR 1/4" = 1'-0" 18 WALL PROFILES: C-WALL EXTERIOR 1/4" = 1'-0" 14 WALL PROFILES: D-WALL INTERIOR 1/4" = 1'-0" 19 WALL PROFILES: D-WALL EXTERIOR 1/4" = 1'-0" 15 WALL PROFILES: E-WALL ANTE ROOM SIDE 1/4" = 1'-0" 20 WALL PROFILES: E-WALL CLEANROOM SIDE 1/4" = 1'-0" 96" 116" 116" 96" 96" 96" 96" 96" 96" 96" 116" 96" 96" 116" 1612"1612"1612" 45" 1612"1612"1612" 45" 1612"1612"1612"1612"1612"1612"1612" 45" 45" 65-3/4" 6534"5534" 55-3/4" 40" 55" 40" 40"55"40" 40"40" 40"40" PLENUM PLENUM PL E N U M PL E N U M 12" 12" 12" Revisions NO DESCRIPTION DATE A Plan Check Corrections 03/13/2024 514" 412" 514" 412" 412" 134" 412" STRAIGHT CORNER POST TYPGAUGE: .125 MATERIAL: 6063-T6 WALL POST TYP GAUGE: .095MATERIAL: 6063-T6 INTERIOR PANEL SIDE DOUBLE GLAZE TYPGAUGE: .060 MATERIAL: 6063-T6 INTERIOR PANEL SIDE SINGLE GLAZE TYPGAUGE: .060 MATERIAL: 6063-T6 INTERIOR PANEL SIDE SINGLE GLAZE TYP GAUGE: .060 MATERIAL: 6063-T6 INTERIOR PANEL SIDE SINGLE GLAZE TYPGAUGE: .060 MATERIAL: 6063-T6 INTERIOR PANEL SIDESINGLE GLAZE TYP GAUGE: .060 MATERIAL: 6063-T6 INTERIOR PANEL SIDEDOUBLE GLAZE TYP GAUGE: .060 MATERIAL: 6063-T6 RADIUS WALL POST TYP GAUGE: .156 MATERIAL: 6063-T6 RADIUS WALL POST TYP GAUGE: .156MATERIAL: 6063-T6 12 WALL POST DETAILS 1/2" = 1" 0.22" THICK ACRYLIC ISO VIEW NOT TO SCALE 0'-214" 0' - 4 12" 0' - 1 34" 0' - 6 14"CEILINGTILE 100% SILICONE CAULK 1X1X1/8" L-ANGLE 3/4" PAN HEAD SCREW 2x2x1/8" L-ANGLE 3/4" FLAT HEAD SCREWS TOP OFWALL PANEL 3/4" PAN HEAD SCREW FLAT HEAD SCREWS STAGGERD EVERY 12" STRAIGHT STOP TYPGAUGE: .060 MATERIAL: 6063-T6 CEILING TYP GAUGE: .078 MATERIAL: 6063-T5 WALL HEADER TYP GAUGE: .095MATERIAL: 6063-T613CEILING ANCHOR DETAILS 1/2" = 1" 0.22" THICK ACRYLIC EXPANSIONANCHOR 3/8" x 3" 2 PER PANELOPPOSITE ENDS 0' - 1 34" 0' - 5 34"0' - 7 12" 0'-412" 0.889" COVE FORMERCAPPING STRIP (OTHERS) COVEFORMER (OTHERS) 2mm THICK VINYL FLOORING (OTHERS) COVABLE BASE TYP GAUGE: .110 MATERIAL:6063-T6 ISO VIEW NOT TO SCALE WALL FOOTER TYP GAUGE: .090MATERIAL: 6063-T6 ANGLED STOP TYP GAUGE: .050 MATERIAL: 6063-T6 14 WALL ANCHOR DETAILS 1/2" = 1" 6" MAXTYP 6" STAGGER, TYP 3' - 1 1 1 / 2 " M A X PA N E L W I D T H (2) 3/8" DIA. X 2" EMBED HILTI KB-TZAT PANEL < 2'-0" (4) 3/8" DIA. X 2" EMBED HILTI KB-TZ AT PANEL > 2'-0" VERT. MULLION POST HORIZ MULLION BASE TRACK HILTI KB-TZ AT PANEL > 2'-0"