Loading...
HomeMy WebLinkAbout400 W Duarte Rd - 2024 - Shade StructureDATE OF SHEETS SHEET NO. CHECKED JOB NO. A R C H I T E C T 16 6 W . L O N G D E N A V E . A R C A D I A , C A . 9 1 0 0 7 B R U C E R E N F R E W 62 6 - 4 4 7 - 5 2 2 6 REVISIONS BY DRAWN BY B R U C E RENFRE W 1 CH U R C H O F T H E G O O D S H E P H E R D AR C A D I A , C A . 40 0 W . D U A R T E R O A D OWNER: 2500 2500 2. SITE PLAN 4. ELEVATIONS S1-2. STRUCTURAL DETAILSS1-1. STRUCTURAL PLAN VIEW, ELEVATION, NOTES 3. FLOOR PLANS 400 W. DUARTE RD. 626 447 2181 TRACT - TR 4090 LEGAL DESCRIPTION 626-447-5226 ARCHITECT 166 W. LONGDEN AVE.ARCADIA, CA. 91007 LOT - PORTION LOT 1 BUILDING DATA MAP BOOK 43-47 ARCADIA, CA. 91007 BRUCE RENFREW- ARCHITECT 1392 sq.ft. 24'x58' NEW 1-STORY SHADE STRUCTURE CHURCH OF THE GOOD SHEPHERD 1. GENERAL NOTES TYPE OF CONSTRUCTION V-B SHEET INDEX...................... 7/21/24PROJECT SUMMARY GOOD SHEPHERD CHILDREN'S CENTER BUILDING HEIGHT 13'-4" OCCUPANCY A-3 562-464-4766 CONTRACTOR - STRUCTURAL ENGINEER 11815 BURKE ST.SANTA FE SPRINGS, CA. 90670 CUSTOM CANOPIES STRUCTURAL ENGINEERJAMES L. MITCHELLS 3081 EXP. 6/30/2025 DATE OF SHEETS SHEET NO. CHECKED JOB NO. A R C H I T E C T 16 6 W . L O N G D E N A V E . A R C A D I A , C A . 9 1 0 0 7 B R U C E R E N F R E W 62 6 - 4 4 7 - 5 2 2 6 REVISIONS BY DRAWN BY B R U C E RENFRE W 2 CH U R C H O F T H E G O O D S H E P H E R D AR C A D I A , C A . 40 0 W . D U A R T E R O A D WESLEY HALL FELLOWSHIP HALL WESLEY LOUNGE ADMINISTRATION CHAPEL SANCTUARYASBURY HOLLY AVE. D U A R T E R D . PLANTER PLANTED PLANTED PLANTED PLANTED PLANTED PLANTED PLANTER PLANTER PLANTER PLANTER PLANTER PLANTER PLANTED PL A N T E R PL A N T E R PL A N T E R PL A N T E R PLANTED PLANTER PLANTER PL A N T E R PL A N T E R PLANTER PL A N T E R ElectricalVault EXISTING HC PARKING SITE PLAN 1/32"= 1'-0" 481.11 532.9 43 6 . 0 0 4 2 3 . 9 9 R= 1 5 . 0 0 PLANTED NEW WALKWAY NOPARKINGNOPARKINGNOPARKING NOPARKING NOPARKING NOPARKING NO P A R K I N G NEW RAMP 4'-0" PAINTEDHC WALK EXISTING HC PARKING NEW EXISTING HC PARKING NEWLOADING ZONE NO PAR K I N G DETECTABLE WARNING - TRUNCATED DOMESARMOR-TILE, SURFACE APPLIED 4'x3' FEDERAL YELLOW FILL IN LOW PRAVING SPEED BUMP REPAVE PARKING AREA (NEW AC PAVING) REMOVE PAVING AND REPLACEWITH 4" CONCRETE SLAB w/ 6x6 #10 WIRE MESH SLOPE TO DRAINS EXISTING WOODFENCE WORK DONE IN 2012 ElectricalSwitch Gear NEW SHADE COVER 24'- 0 " 1392 sqft 40'- 0 " ROOF EAVE ROOF EAVE 5'-4 " 5'-4 " EXISTING HC RAMPEXISTING HC RAMP 58'-0" 1'-0"1'-6"+/- 7/21/24 DATE OF SHEETS SHEET NO. CHECKED JOB NO. A R C H I T E C T 16 6 W . L O N G D E N A V E . A R C A D I A , C A . 9 1 0 0 7 B R U C E R E N F R E W 62 6 - 4 4 7 - 5 2 2 6 REVISIONS BY DRAWN BY B R U C E RENFRE W 3 CH U R C H O F T H E G O O D S H E P H E R D AR C A D I A , C A . 40 0 W . D U A R T E R O A D OVERALL FLOOR PLAN 1/16 "= 1'-0" ADMINISTRATION FELLOWSHIP HALL CHAPEL SANCTUARYASBURY HALL WESLEY HALL SECOND FLOOR SECOND FLOOR SECOND FLOOR WESLEY LOUNGE TOILET ROOMWOMEN'S COVERED EXISTING TOILET ROOM WALKWAY WALKWAYCOVERED PARKING LOT DN KITCHEN NEW MOP SINK HTD SD EXISTING EXISTINGMEN'S 5'- 1 " 24 ' - 0 " 5'- 4 " 1392 sqft 15 ' - 3 " 40 ' - 0 " NEW SHADE COVER 1392 sqft 58'-0"+/- 1'-0" +/- 7/21/24 26'-6" 1'-6" DATE OF SHEETS SHEET NO. CHECKED JOB NO. A R C H I T E C T 16 6 W . L O N G D E N A V E . A R C A D I A , C A . 9 1 0 0 7 B R U C E R E N F R E W 62 6 - 4 4 7 - 5 2 2 6 REVISIONS BY DRAWN BY B R U C E RENFRE W 4 CH U R C H O F T H E G O O D S H E P H E R D AR C A D I A , C A . 40 0 W . D U A R T E R O A D 8'- 2 " 1/4"=1'-0" NORTH ELEVATION 2' - 1 " 9' - 1 " FL 9' - 1 " 9' - 1 " 2' - 1 " FL PL EAST ELEVATION 1/4"=1'-0" ASBURY HALL STORAGE SHED 5'-0" CLEAR FROMEAVE TO SHADECOVER 5'-0" CLEAR FROMEAVE TO SHADECOVER 5'-1" 5'-4"24'-0" 13 ' - 4 " NEW SHADE COVER EXISTING EXISTING ASBURY HALLEXISTING NEW SHADE COVER 1'-0" 58'-0" 1'-6"+/- EXISTING HC RAMP EXISTING HC RAMP 13 ' - 4 " 7/21/24 S1-1 NTS Ch u r c h o f t h e G o o d S h e p h e r d 40 0 W e s t D u a r t e R o a d Ar c a d i a , C a 9 1 0 0 7 Church of the Good Shepherd NOTES:1 - Steel Structure not designed for snow load accumulation in excess of 5.0 psf. All Sails/cables shall be removed prior to snow load accumulation E3473 Creative Shade PLAN VIEW HDPE Fabric to be Alnet ExtrablockOffice or State Fire MarshallRegistration No. F-94501 Ø5/16" 7x19 wire rope cont. around perimeterwith dbl cable clamps @ lap Detail BS1-2 typ. Fin. Grade Field Verify ELEVATION VIEW Detail C S1-2 typ. Column perplan Above typ. Detail AS1-2 typ. Ø5" Sch 40 pipe typ. Ø4" S c h 4 0 p i p e Ø4" Sch 40 pipe Ø4" Sc h 4 0 p i p e Detail AS1-2 typ. 13'-4" 8'-0" 12/12/23 DESIGN CRITERIA Design to conform to: 2022 California Building Code (CBC) as applicable 2022 California Green Building Standards Code (CalGreen) 2022 California Electrical Code (CEC) 2022 California Mechanical Code (CMC) 2022 California Plumbing Code (CPC) 2022 California Fire Code (CFC) 2022 California Building Energy Efficiency Standards (CBEES) City of Arcadia Municipal Code Live Loads : 5 psfWindspeed: 95 mphExposure: BRisk Category: IIGCpi = 0.0 ( open/roof only)Seismic Criteria: Site Class: D R = 1.25 (Cantilever Column) Importance Factor = 1.0, Rho=1.0 STEELStructural steel shall conform to ASTM A-36Machine bolts shall conform to ASTM A-307Pipe sections shall conform to ASTM A53 Gr. B (Fy=35 ksi)HSS sections shall conform to ASTM A500 Gr. B (Fy=42 ksi) WELDINGWelding shall be done by AWS D1.1 Structural certified welders.Welding to be performed by LADBS approved TYPE I fabricatorNO FIELD WELDING REINFORCEMENTRebar shall conform to ASTM A 615 Grade 60Clearance from soil shall be a minimum of 3" SOIL CAPACITY (CBC Chpt.18) No current Geotechnical Report Allowable end bearing =1500psfAllowable lateral bearing =150x2=300 pcf for cantilever Structure in clayey sand not sensitive to deflection FOOTINGSSquare footing can be substituted for round with a min. width equal to diameter measurementConcrete f'c = 2500 psi min.Course agragate 1" (Max)Slump 4.0 +/- 1"W/C Ratio = .54 (Max) FABRICASTM E84 19B Class ANominal fabric mass 9.38 to 10.32 oz./sq yard CLEARANCE FROM OTHER STRUCTURESCanopies shall be at least 6" away from any other structurewhich may be damaged due to deflection **No Special Inspection Required** James L. Mitchell Structural EngineerKyle, Texas 78640 24'-0" 58'-0" 19'-0"20'-0"19'-0" Ø4" S c h 4 0 p i p e Ø4" Sc h 4 0 p i p e st D 7/20/8/30/6/5/24 2- Ø58" Thru-Bolt @ 3" gaand 1" edge typ. Hip pipeper S1-1 Ridge pipeper S1-1 Ø3 12" Sch 40 Spigot Min 6" Hip pipeper S1-1 12" Round bar forcable hold down Detail B Hip pipe per S1-1 Pipe column per S1-1 Ø516" 7x19 rope aroundperimeter with dbl cable clamps @ lap Refer toBlowup View (2) Ø58" Rafter bolts Ø4" Sch 40 stub Hip pipe per S1-1 Ø3 12" Sch 40 Spigot Blowup View 3/16 14" Detail A Ø6 12" x 12" plate 12" Round bar forcable hold down S1-2 NTS Ch u r c h o f t h e G o o d S h e p h e r d 40 0 W e s t D u a r t e R o a d Ar c a d i a , C a 9 1 0 0 7 Church of the Good Shepherd E3473 Creative Shade 516 12/12/23 Min. 18"Cable overlap Min. 18"Cable overlap Detail A Top View Hip Rafter per S1-1 plan HDPE Fabric Cable claps 2 min. Ø12" Bar to hold cable down Ø516" 7x19 rope around perimeterw/ dbl cable clamps @ lap Ø 516" 7x19 rope around perimeterw/ dbl cable clamps @ lap Detail C 2% Slope for drainage Fin GradeField Verify (8) - #4 verticals (3) - #3 ties 2" apart for first 6" (3) - #3 ties 10" O.C. Min. 3" distance from soil Note if square holeused, provide 3-#4 eq.spaced each face(8-#4 total) Concrete footing 316 Pipe column perS1-1 Ø24" 3'-6" Footing depth5'-6" Foundation Detail at Pipe Column 18" Overlap 14" End plate with Ø = Pipe Ø + 1" James L. Mitchell Structural Engineer Kyle, Texas 78640 Thur-Bolts per Detail B/S1-2 st D 7/20/8/30/6/5/24 Structural CalculaƟon Package Church of Good Shepherd - Arcada, California 58’x24’x8’ Eve Hip Canopy Custom Canopies, Inc. st D 7/20/ 8/30/ 6/5/24 Good Shepherd – Arcadia, Ca Page 2 Structural CalculaƟons Structure Type 58’x24’x8’ Eve Hip Canopy Embedded Columns within Deep foundaƟons Deep FooƟng FoundaƟon -No Geotech Use Chpt 18 -Assume Clayey Sand -End Bearing (not control design) = 1500 psf -Passive Bearing = 150x2 = 300 pcf (2x based on canƟlever structure not deflecƟon sensiƟve) -Non-Constrained condiƟon Codes -2022 CBC -ACI 318-19 -AISC 360-16 -ASCE 7-16 -ASCE 19 -ASCE 55 Materials -Plate steel = A36 -Pipe Steel = A500 Gr. B (42 ksi) -Bolts = A307 (galv) -Welds = E70xx min -Cable = 5/16”Ø 7x19 Wire Rope = 9800 lbs MBS = 4455 lbs @ F.S. = 2.2 -Concrete = 28 day compressive strength =2500 psi (Type I/II with 1” max. coarse agg.) -Reinforcing = ASTM A615 gr. 60 -Fabric = Alnet Extrablok Loading -Self weight of hip/ridge members, fabric and cable -Cable pretension <= 300 lbs -Fabric pre-stretch = 8.0 plf -Live Load = Awning = 5.0 psf -Snow Load = 5.0 psf (limit to awning Live Load) -Seismic (R=1.25) NOT control as no real mass other than pipe self weight -Wind Load per ASCE 7-16 (GCpi = 0.0 for open structure) -V = 95 mph -Risk Category = II -Exposure = C -P = 15.7 psf fown, 5.7 psf up, 8.6 psf up on sides Good Shepherd – Arcadia, Ca Page 3 Structural CalculaƟons NOTES: 1 - Steel Structure not designed for snow load accumulation in excess of 5.0 psf. All Sails/cables shall be removed prior to snow load accumulation PLAN VIEW HDPE Fabric to be Alnet Extrablock Office or State Fire Marshall Registration No. F-94501 Ø5/16" 7x19 wire rope cont. around perimeter with dbl cable clamps @ lap Detail B S1-2 typ. Fin. Grade Field Verify ELEVATION VIEW Detail C S1-2 typ. Column per plan Above typ. Detail A S1-2 typ. Ø5" Sch 40 pipe typ. Ø4 " S c h 4 0 p i p e Ø4" Sch 40 pipe Ø4" Sc h 4 0 p i p e Detail A S1-2 typ. 13'-4" 8'-0" 24'-0" 58'-0" 19'-0"20'-0"19'-0" Ø4 " S c h 4 0 p i p e Ø4" Sc h 4 0 p i p e st D 7/20/ 8/30/ 6/5/24 Good Shepherd – Arcadia, Ca Page 4 Structural CalculaƟons Analysis -Dlubal FEA Model -Form Finding loads applied to cables and fabric as part of “Prestress” -Steel check also performed by Dlubal per ASD Results -All Post = 5”Ø Sch. 40 -Hip and Ridge members = 4”Ø Sch. 40 -Cable = 5/16”Ø galvanized 7x19 wire rope -Fabric = Alnet FoundaƟon Design -FooƟng Design -Enercalc design for fooƟng bury depth using 300 pcf passive bearing -Flexural check per SP Column -Typical fooƟng use 24”Ø – 2500 psi concrete fooƟng buried 5’-6” below fin. Grade/top of undisturbed soil Lap pipe >50% = 3’-6” to develop Mcol base ConnecƟon Design -Cable/Fabric Sail Corner -Cable wraps around stub verƟcal member at each hip corner and tuck below hold-down rod so sail cannot upliŌ -Cable lapped with two cable clamps min. -Hip-to-ridge and hip-to-post uƟlize spigot/internal sleeve to transmit moment and shear loads, while 2-5/8”Ø Thru-bolts resist axial tension loads only -Spigot to be 3.5” sch. 40 - Smaller secƟon relaƟve to hip member inside diameter. with Mp >= M Hip demand Special inspecƟon -Per CBC Chapter 17 – Minor Structures allowed -All material low strength -Concrete = 2500 psi does not require S.I. -LADBS cerƟfied Steel Fabricator -No field welding -NO Special InspecƟon Required Wind Loading AG&E Associates, PLLC JOB TITLE Custom Canopies, Inc. Structural Engenuity JOB NO. SHEET NO. CALCULATED BY WCE DATE 4/10/2024 CHECKED BY DATE Wind Loads - Open Buildings: 0.25 ≤ h/L ≤ 1.0 Ultimate Wind Pressures Type of roof = Pitched Free Roofs G = 0.85 Wind Flow =Clear Roof Angle =14.9 deg NOTE: The code requires the MWFRS be Main Wind Force Resisting System designed for a minimum pressure of 16 psf. Kz = Kh (case 2) = 0.57 Base pressure (qh) =11.3 psf Roof pressures - Wind Normal to Ridge Cnw Cnl Cn =1.10 -0.40 p =10.6 psf -3.8 psf Cn =0.10 -1.10 p =1.0 psf -10.6 psf NOTE: 1). Cnw and Cnl denote combined pressures from top and bottom roof surfaces. 2). Cnw is pressure on windward half of roof. Cnl is pressure on leeward half of roof. 3). Positive pressures act toward the roof. Negative pressures act away from the roof. Roof pressures - Wind Parallel to Ridge, Ɣ = 90 deg Procedure not allowed h/L is less than 0.25 h = 11.0 ft ≤ h >h ≤ 2h > 2h 2h = 22.0 ft Cn =-0.80 -0.60 -0.30 p =-7.7 psf -5.8 psf -2.9 psf Cn =0.80 0.50 0.30 p =7.7 psf 4.8 psf 2.9 psf Fascia Panels -Horizontal pressures Fascia pressures not applicable - roof angle exceeds 5 degrees. qp =0.0 psf Windward fascia:0.0 psf (GCpn = +1.5) Leeward fascia:0.0 psf (GCpn = -1.0) Components & Cladding - roof pressures Kz = Kh (case 1) = 0.70 a = 3.0 ft a2 =9.0 sf Base pressure (qh) =13.8 psf 4a2 =36.0 sf G = 0.85 positive negative positive negative positive negative 2.20 -2.21 1.70 -1.70 1.10 -1.10 1.70 -1.70 1.70 -1.70 1.10 -1.10 1.10 -1.10 1.10 -1.10 1.10 -1.10 25.7 psf -25.9 psf 19.9 psf -19.9 psf 12.9 psf -12.9 psf 19.9 psf -19.9 psf 19.9 psf -19.9 psf 12.9 psf -12.9 psf 12.9 psf -12.9 psf 12.9 psf -12.9 psf 12.9 psf -12.9 psf The C&C pressure shall not be less than 16 psf acting in either direction normal to the surface. Wind pressure zone 3 zone 2 >9, ≤ 36 sf > 36 sf ≤ 9 sf >9, ≤ 36 sf > 36 sf Clear Wind Flow CN zone 1 Clear Wind Flow Effective Wind Area ≤ 9 sf A B Horizontal Distance from Windward EdgeWind Flow Load Case A B Load Case Wind Flow Clear Wind Flow Ɣ = 0 & 180 deg Wind Direction AG&E Associates, PLLC JOB TITLE Custom Canopies, Inc. Structural Engenuity JOB NO. SHEET NO. CALCULATED BY WCE DATE 4/10/2024 CHECKED BY DATE Location of Wind Pressure Zones MAIN WIND FORCE RESISTING SYSTEM COMPONENTS AND CLADDING Dlubal RFEM6 Model Foundation Design Page 1 Description Typical Footing Pole Embedment in SoilRev: 560100 User: KW 0604922, Ver 5.6.1, 25 Oct 2002 (c)1983 2002 ENERCALC Engineering Software : Scope : Title :Job # Description : Dsgnr:Date: 2:14PM, 29 MAY 24 General Information 300.00 3,000.00 1.000 Pole is Circular 30.000 in No Surface Restraint 1,200.00 8.000 0.00 8.000 0.000 Applied Loads... lbspsf pcfAllow Passive Max Passive distance to bottom Load duration factor Diameter ft Point Load ftdistance from base Distributed Load #/ft ftdistance to top Summary Moments @ Surface... Total Lateral Point load Distributed load Total Moment 9,600.00 0.00 9,600.00 1,200.00 ft #ft # lbs Without Surface Restraint... Required Depth 5.414 ft Press @ 1/3 Embed... Actual 541.67 psf Allowable 541.36 psf x y 24 in diam. Code: ACI 318-02 Units: English Run axis: About X-axis Run option: Investigation Slenderness: Not considered Column type: Structural Bars: ASTM A615 Date: 12/21/10 Time: 13:23:13 pcaColumn v4.10. Licensed to: HKS, Inc.. License ID: 54884-1015350-4-2274E-2A0A7 File: untitled.col Project: Custom Canopies Column: 24"-2500 psi Engineer: f'c = 2.5 ksi fy = 60 ksi Ag = 452.389 in^2 6 #4 bars Ec = 2850 ksi Es = 29000 ksi As = 1.20 in^2 rho = 0.27% fc = 2.125 ksi Xo = 0.00 in Ix = 16286 in^4 e_u = 0.003 in/in Yo = 0.00 in Iy = 16286 in^4 Beta1 = 0.85 Min clear spacing = 7.88 in Clear cover = 3.38 in Confinement: Tied phi(a) = 0.8, phi(b) = 0.9, phi(c) = 0.65 P (kip) Mx (k-ft) 700 -100 160-160 (Pmax)(Pmax) (Pmin)(Pmin) fs=0.5fy fs=0 fs=0.5fy fs=0 HDPE Fabric Data Product Marketed by: ALNET PTY (LTD) MOORSOM AVENUE, EPPING, INDUSTRY II Issue Date :06/01/2022 CAPE TOWN, S. AFRICA, , Expiration Date :06/30/2023 This product meets the minimum requirements of flame resistance established by the California State Fire Marshal for products identified in Section 13115, California Health and Safety Code. The scope of the approved use of this product is provided in the current edition of the CALIFORNIA APPROVED LIST OF FLAME RETARDANT CHEMICALS AND FABRICS, GENERAL AND LIMITED APPLICATIONS CONCERNS published by the California State Fire Marshal. Issued By Vikkie Franklin Fire Engineering License Manager Fire Engineering & Investigations Division Reviewed and Approved By Patricia Setter Deputy State Fire Marshal III Fire Engineering & Investigations Division OFFICE OF THE STATE FIRE MARSHAL Please visit calfire.govmotus.org for more information on Licensing and Permitting with CAL FIRE Fabric Registration LICENSE NUMBER:F-094501 FLAME RETARDANT EXTRA BLOCK SHADECLOTH Page 1 of 1 Issue Date :06/01/2022 Expiration Date :06/30/2023 023 4