Loading...
HomeMy WebLinkAbout900 S Baldwin Ave - 2025 - Music SchoolFilename: Sheet Title: Date: Scale: Project No.: Drawn By: ALEN DENG Reviewed By: No. Not for construction until reviewed, signed, and dated. Sheet #: Description Date A Project for: Revisions: A 2 3 4 5 6 7 8 9 1211 A10 J I B C D E F G H 1 2 9876543 121110 J I G F E D C B H PERMIT# 13 131 Stamp COMMERCIAL RESIDENTIAL SO L I D W A Y C O N S T R U C T I O N G R O U P TE L : 6 2 6 . 9 6 2 . 1 1 2 2 FA X . 6 2 6 . 9 6 2 . 0 2 2 9 12 1 1 N . A Z U S A C A N Y O N R O A D W E S T C O V I N A C A 9 1 7 9 0 E- M A I L : S A M @ S O L I D W A Y C O N S T R U C T I O N . C O M 駿業 建 築 裝 修 集 團 DC & Consulting Inc. Tel: 626-962-0997 E-mail:admin@dcdesignconsulting.com 1211 N. Azusa Canyon Rd,#B West Covina, CA 91790 Fax: 626-962-0229 A-1 TITLE SHEET 90 0 S B A L D W I N A V E . AR C A D I A C A 9 1 0 0 7 NO. C31901 Exp.12/31/26 S A E E D MA P R O R I F B C S E TAT OF SIG RE NET JE . O H F I C S L I AL E. N IN GN E RE AINOR GI N N - L VIC LI BUILDING CORRECTION 10-3-20237 4. THE BUILDING EXTERIOR AND PARKING AREA ARE UNDER DIFFERED SUBMITTAL. (FOR INTERIOR ONLY) NOTES: THE SEPARATE PERMIT FROM PROTRK CONSTRUCTION INC. APPROVED PLANS WITH WORKING PERMIT #COMM-24-0840 BY 7-17-2024. THE DETAILS SEE ADDENDUM SHEET. (T.I. WORK ONLY) 8 REVISION 2-20-2025 Filename: Sheet Title: Date: Scale: Project No.: Drawn By: ALEN DENG Reviewed By: No. Not for construction until reviewed, signed, and dated. Sheet #: Description Date A Project for: Revisions: A 2 3 4 5 6 7 8 9 1211 A10 J I B C D E F G H 1 2 9876543 121110 J I G F E D C B H PERMIT# 13 131 Stamp COMMERCIAL RESIDENTIAL SO L I D W A Y C O N S T R U C T I O N G R O U P TE L : 6 2 6 . 9 6 2 . 1 1 2 2 FA X . 6 2 6 . 9 6 2 . 0 2 2 9 12 1 1 N . A Z U S A C A N Y O N R O A D W E S T C O V I N A C A 9 1 7 9 0 E- M A I L : S A M @ S O L I D W A Y C O N S T R U C T I O N . C O M 駿業 建 築 裝 修 集 團 DC & Consulting Inc. Tel: 626-962-0997 E-mail:admin@dcdesignconsulting.com 1211 N. Azusa Canyon Rd,#B West Covina, CA 91790 Fax: 626-962-0229 A-1.4 DETAIL 90 0 S B A L D W I N A V E . AR C A D I A C A 9 1 0 0 7 NO. C31901 Exp.12/31/26 S A E E D MA P R O R I F B C S E TAT OF SIG RE NET JE . O H F I C S L I AL E. N IN GN E RE AINOR GI N N - L VIC LI BUILDING CORRECTION 1-11-20194 BUILDING CORRECTION 1-21-20257 REVISION 2-20-20258 Filename: Sheet Title: Date: Scale: Project No.: Drawn By: ALEN DENG Reviewed By: No. Not for construction until reviewed, signed, and dated. Sheet #: Description Date A Project for: Revisions: A 2 3 4 5 6 7 8 9 1211 A10 J I B C D E F G H 1 2 9876543 121110 J I G F E D C B H PERMIT# 13 131 Stamp COMMERCIAL RESIDENTIAL SO L I D W A Y C O N S T R U C T I O N G R O U P TE L : 6 2 6 . 9 6 2 . 1 1 2 2 FA X . 6 2 6 . 9 6 2 . 0 2 2 9 12 1 1 N . A Z U S A C A N Y O N R O A D W E S T C O V I N A C A 9 1 7 9 0 E- M A I L : S A M @ S O L I D W A Y C O N S T R U C T I O N . C O M 駿業 建 築 裝 修 集 團 DC & Consulting Inc. Tel: 626-962-0997 E-mail:admin@dcdesignconsulting.com 1211 N. Azusa Canyon Rd,#B West Covina, CA 91790 Fax: 626-962-0229 A-1.5 DETAIL 90 0 S B A L D W I N A V E . AR C A D I A C A 9 1 0 0 7 NO. C31901 Exp.12/31/26 S A E E D MA P R O R I F B C S E TAT OF SIG RE NET JE . O H F I C S L I AL E. N IN GN E RE AINOR GI N N - L VIC LI BUILDING CORRECTION 1-11-20194 BUILDING CORRECTION 1-21-20257 REVISION 2-20-20258 EXISTING FLOOR PLAN & DEMO PLAN (E) FLOOR PLAN 1/4" = 1'-0" 0 Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. A-3 ROOF PLAN 1/8" = 1'-0" 0 360 Education Academy 900 ELEVATION & DETAIL 90 0 S B A L D W I N A V E . AR C A D I A C A 9 1 0 0 7 COMMERCIAL RESIDENTIAL SO L I D W A Y C O N S T R U C T I O N G R O U P 駿業 建 築 裝 修 集 團 DC & Consulting Inc. A-3.1 1. Permanent ladders required by Section 304.3.1.2 shall be constructed in accordance with the following: 1 ). Side railings shall extend not less than 30 inches (762 mm) above the roof or parapet wall. 2 ). Landings shall not exceed 18 feet (5486 mm) apart measured from the finished grade. 3 ). Width shall be not less than 14 inches (356 mm) on center. 4 ). Rungs spacing shall not exceed 12 inches (305 mm) on center and each rung shall be capable of supporting a 300 pound (136.1 kg) load. 5 ). Toe space shall be not less than 6 inches (152 mm). 2. 1013.6 Roof access. Guards shall be provided where the roof hatch opening is located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall be constructed so as to prevent the passage of a 21-inch-diameter sphere. NOTES: 3 FIRE CORRECTION 9-15-2023 NO. C31901 Exp.12/31/26 S A E ED MA P R O R I F B C S E TAT OF SIG RE NETJE . O H F I C S LI AL E. N IN GN E RE AINOR GI N N - L VIC LI (N) FRONT ELEVATION 3/16" = 1'-0" (N) SIDE ELEVATION 3/16" = 1'-0" (E) SIDE ELEVATION 3/16" = 1'-0" (N) REAR ELEVATION 3/16" = 1'-0" (E) FRONT ELEVATION 3/16" = 1'-0" 15 ' - 3 " 11 ' - 1 1 " 9' - 6 " 8' - 6 " 3' - 0 " 1'-0" 3' - 0 " 1' - 0 " 2'-0" 7" 3' - 0 " 5' - 8 " 1' - 0 " 8' - 7 " 14 ' - 1 1 " 3' - 0 " 3' - 0 " LADDER FOR ACCESS TO EQUIPMENT O ROOF 1'-11" 9" 14 ' - 1 1 " 15 ' - 3 " 3' - 0 " 15 ' - 3 " 8' - 7 " 15 ' - 3 " 8' - 7 " 1' - 0 " 5' - 8 " 15 ' - 3 " 9' - 7 " 1' - 0 " 3' - 0 " 14 ' - 1 1 " 7" 3' - 0 " 1' - 0 " 3' - 0 " 6'-8" 9' - 6 " 8' - 0 " 6' - 0 " 8' - 7 " 1' - 0 " 6' - 8 " 15 ' - 3 " 5' - 8 " 8' - 7 " KNOX BOX 6' - 0 " 7" 5'-2"EX WALL (N) LANDING SECTION 1/4" = 1'-0" G FINISHGRADE 2' - 0 " 2' - 0 " A.Exterior stairway notes: 1.Maximum rise 7 inches (4" min) and minimum run (tread) of 11 inches. [CBC 1011.5.2] B.Handrails shall satisfy the following: [CBC 1014] 1. Handrail shall be 34-38 inches above the nosing of treads. [CBC 1014.2] 2.The handgrip portion of handrail shall not be less than 1-·114 inches nor more than 2 inches in cross-sectional dimension. [CBC HR··50S.7] 3.The handgrip shall extend 12" beyond the top and 12" + tread width beyond bottom tread and return of handrail to newel post or wall. [CBC UB-50S.10] 4.Handrail extension length is measured to start of radius return. [CBC llB-S05.4 and Fig UB-50S.10.2 and 3] NOTES: 5' - 8 " 2'-3" 9' - 7 " EX WOOD (E)TYPICAL PARAPET FLASHING SLOPE:1:12 EX WOOD DETAIL 2 DETAIL 1 EX HEADER EXISTING CONCRETE SLAB 4X6 JOIST 2X6 BLOCK 3 DETAIL 3 1 1 2 11 ' - 0 " 11 ' - 0 " WALL LIGHT WALL LIGHT 1'-0" 3' - 0 " 3' - 0 " 1'-0" 2'-0" 3' - 0 " 6' - 0 " CANCEL (NOT PART OF THE PERMIT) 8 REVISION 2-3-2025 CANCEL (NOT PART OF THE PERMIT) (N ) P o w e r R o o m (E ) E l e c . R a c k BREAK ROOM COMMERCIAL RESIDENTIAL SO L I D W A Y C O N S T R U C T I O N G R O U P 駿業 建 築 裝 修 集 團 DC & Consulting Inc. (N) FLOOR PLAN A-4 7'-10" X 10'-6" =82 (N) STUDY 4 AREA: 88 S.F (N) STUDY 3 AREA: 88 S.F (N) STUDY 2 AREA: 88 S.F (N) STUDY 1 AREA: 88 S.F (N) PIANO ROOM 4 AREA: 177 S.F Door/WINDOW Schedule (N) PIANO ROOM 1 AREA: 127 S.F (N)RECORD EQUIPMENT ROOM AREA: 205 S.F (N)MEN RESTROOM AREA: 106 S.F (N) STUDY 6 AREA: 103 S.F (N) RECORD ROOM AREA: 265S.F (N) CORRIDOR (N)WOMEN RESTROOM AREA: 97S.F (N)STUDENT PERFORM ROOM AREA: 833S.F ■TOILET ROOM SHALL BE PROVIDED OPENABLE A VERTICAL DUCT NOT LESS THAN 100 SQUARE INCHES IN AREA FOR THE FIRST WATER CLOSET PLUS 50 SQUARE INCHES ADDITIONAL WATER CLOSET . PROVIDING A COMPLETE CHANGE OF AIR EVERY 15 MINUTES. ■ NOTES: THE REST ROOM FLOORS SHALL HAVE A SMOOTH, HARD NONABSORBENT SURFACE WHICH EXTENDS UPWARD ONTO THE WALLS AT LEAST 6" [CBC 1210.] TOILET ROOMS MUST BE VENTED TO THE OUTSIDE AIR BY MEANS OF AN OPENABLE, SCREENED WINDOW (NOT LESS THAN 16 MESH SCREENING), AN AIR SHAFT, OLIGHT-SWITCH-ACTIVATED EXHAUST FAN. (N) STUDY 5 AREA: 86 S.F (N) SITTING AREA: 86 S.F AREA: 140S.F (N) LOBBY AREA :475 S.F ■SIGN ABOVE THE DOOR:"EXIT DOOR MUST BE OPENABLE FROM EGRESS SIDE WITHOUT THE USE OFA KEY, SPECIAL KNOWLEDGE, OR EFFORT." (CBC1008.1.9)■LIMIT THRESHOLD = 1/2" MAX. LOWER 10" OF THE DOOR SHALL BE SMOOTH PLANE SURFACE 1 HR FIRE RATED WALL 1 HR FIRE RATED WALL(CORRIDOR) N.T.S 1 25 Students llB-211.2 Minimum number. No fewer than two drinking fountains shall be provided. When provided, one drinking fountain shall comply with Sections IJB-602.l through IJB- 602.6, IJB-602.8 and IJB-602.9 and one drinking fo A B B B B BB 2 3 3 3 3 3 3 3 3 15 2 90 0 S B A L D W I N A V E . AR C A D I A C A 9 1 0 0 7 B 3 PROPOSED FLOOR PLAN N (N) PIANO ROOM 2 AREA: 127 S.F (N) PIANO ROOM 3 AREA: 127 S.F 3 3 3333 3 3 3 4 3 2'-0" 3' - 1 " 3' - 5 " 1' - 9 " 1'-6" 1. ONE HOUR FIRE-RATED CORRIDORS ARE REQUIRED PER CBC SEC. 1020 2. Provide a level landing on each side of a door extending 60" on direction of door swing and 48" in opposite direction of door swing, measured with door closed. [CBC 11B-404.2.4 and Table IlB- 404.2.4.1] 3. A landing shall extend 24" past strike side of exterior doors on pull side and 18" minimum past strike edge of interior doors. Provide 12" on push side, if the door has both a latch and a closer. [CBC Table 11 B-404.2.4.I] 1' - 0 " 1 HR FIRE RATED WALL(CORRIDOR) 1 HR FIRE RATED WALL(CORRIDOR) ∅5'-0" ∅5'-0" 1'-6"1'-6" 1'-6"1'-6"2'-10"1'-6"1'-6"1'-1"3'-0" 5' - 0 " 4. Doors, in any position, shall not reduce the minimum dimension of the ramp landing to less than 42 inches. [CBC 11B-40S.7.S] N.T.S 4 HANDRAILS(BOTH SIDE) LADDER FOR ACCESS TO EQUIPMENT TO ROOF NOTE: DRINKING FOUNTAIN (DETAIL SEE "A-6"-B ) CORRIDOR 1 HR FIRE RATED WALL 1 HR FIRE RATED WALL 1 HR FIRE RATED WALL(N) CORRIDOR (N ) CO R R I D O R 1 HR FIRE RATED WALL 1 H R F I R E R A T E D W A L L C D 3 FIRE CORRECTION 11-08 1LEGEND: A-6 PARTITIONWALL PARTITION WALL DETAIL 2 NO. C31901 Exp.12/31/26 S A E ED MAPRO R I F B C S E TAT OF SIG RE NETJE . O H F I C S L I AL E. N IN GN E RE AINOR GI N N - L VIC LI 2'-6" 4' - 0 " 5'-0" E 7'-7" B B B B 3/4 HOURS FIRE RATED PER CBC Table 716.6 8'-4" 5' - 8 " 5' - 8 " 8'-4" 10 ' - 6 " 38 ' - 6 " 24 " 42" 112'-3" 16 ' - 1 0 " 16 ' - 4 " 2' - 0 " 1' - 5 " NOTES: 1. EXISTING STRUCTURE REMAIN; 2. EXISTING INSULATION REMAIN; 3. EXISTING DRYWALL CEILING REMAIN. 8" 1' - 0 " ENCLOSE TRASH AREADETAIL SEE "A-6"-D SL O P E : 1 : 1 2 HANDRAILS(BOTH SIDE) 5' - 8 " 4' - 2 " 4'-6" NOTES: LEVER HANDLEFOR FAUCET CONTROL (N ) S T O R E F R O N T W I N D O W ( T E M P E R ) (N ) S T O R E F R O N T W I N D O W ( T E M P E R ) C C D D D D D F G 3'-5" 5' - 8 " 2' - 0 " AED GLAZED OPENING ANALYSIS NOTES: 7'-10"7'-10"7'-10" 12'-7" 7'-0"7'-0"7'-0"7'-0" 6'-11" 82 X 0.25 = 21 7'-0"7'-0" 6' - 8 " N.T.S 2 7'-10" X 10'-6" =82 7'-10" X 10'-6" =82 12'-7" X 10'-6" =169 7'-0" X 11'-0" =77 7'-0" X 11'-0" =77 7'-0" X 11'-0" =77 7'-0" X 11'-0" =77 7'-0" X 10'-6" =74 7'-0" X 10'-6" =74 6'-11" X 10'-6" =73 6'-8" X 10'-6" =70 3'-6" X 4'-0" =14 3'-6" X 4'-0" =14 3'-6" X 4'-0" =14 3'-6" X 4'-0" =14 3'-6" X 4'-0" =14 3'-6" X 4'-0" =14 3'-6" X 4'-0" =14 3'-6" X 4'-0" =14 3'-6" X 4'-0" =14 3'-6" X 4'-0" =14 3'-6" X 4'-0" =14 3'-6" X 4'-0" =14 82 X 0.25 = 21 82 X 0.25 = 21 169 X 0.25 = 42 77 X 0.25 = 19 77 X 0.25 = 19 77 X 0.25 = 19 77 X 0.25 = 19 74 X 0.25 = 18 74 X 0.25 = 18 73 X 0.25 = 18 70 X 0.25 = 17 (3) #8 SHEET WOODSCREWS /EACH (2) #8 SHEET METALSCREWS /EACH 25GA. MTL STUD3-5/8"x1-1/4"ICC # ESR-3016 @24" O.C 25GA. MTL BRACING3-5/8"x1-1/4"ICC # ESR-3016 @48" O.C 25GA. MTL STUD3-5/8"x1-1/4"ICC # ESR-3016 @24" O.C 10'-6"A.F.F 11'-0"A.F.F 5/8" DRY WALL FIN.TYPE "X" GYP. BD. PARTITIONWALL 2 3 5/8" DRY WALL FIN. TYPE "X" GYP. BD. 5/8" DRY WALL FIN. TYPE "X" GYP. BD. 25 GA. MTL TRACK3-5/8"x1-1/4"W/(2)#8 METAL SCREW 10'-6"A.F.F N.T.S 3 (3) #8 METALSCREWS /EACH 25GA. MTL BRACING3-5/8"x1-1/4"ICC # ESR-3016 @48" O.C (3) #8 WOODSCREWS /EACH 25GA. MTL STUD3-5/8"x1-1/4"ICC # ESR-3016 @24" O.C (3) #8 SHEET METALSCREWS /EACH PARTITION WALL DETAIL The student perform room appears to be an A-3 occupancy I.Doors serving an occupant load of 50 or more or Group H occupancies shall swing in the direction of exit travel. [CBC 1010.1.2.1] ii. All exit doors and gates from an A-3 occupancy shall not be provided with a latch or lock, unless it is panic hardware. [CBC 1010.2.9] iii. Every assembly area shall have the occupant load posted in a conspicuous place near the main exit of the room. [CBC 1004.9] iv. When additional doors are provided, they shall conform to the provisions for exit doors. [CBC 1010.1] NOTES 2: 7 BUILDING CORRECTION 10-6-2023 CANCEL (NOT PART OF THE PERMIT) 8 REVISION 2-3-2025 Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. 1 1 / 2 " NOTES ADJACENT WALLS OPPOSITE WALLS NOTES WITHIN 6'-0" FROM WALLS OPENING MATERIAL OR CHECK L/R <200 NOTES:THE SUSPENDED LAY-IN CEILING SHALL COMPLY WITH THE 2016 CBC. # 1SEE N O T E MAX (TYP) ƒ NOTES: 1. The suspended ceiling system shall comply with CBC 808 and seismic design per ASCE 7-16, 13.5.6. And construction shall comply with the 2022 CBC. 2.Heavy Duty T-Bar grid system as required by the evaluation report(ICC-ESR1308). N CEILING PLAN A-5 (N ) P o w e r R o o m (E ) E l e c . R a c k COMMERCIAL RESIDENTIAL SO L I D W A Y C O N S T R U C T I O N G R O U P 駿業 建 築 裝 修 集 團 DC & Consulting Inc. DETAIL A-6 1 HR FIRE CONSTRUCTION. PER CBC2016 "TABLE721.1(3)-22-1.1": ONE HOUR FIRE RATED CEILING: Base layer 5/8″ Type X gypsum board applied at right angles to steel framing 24″ on center with 1″ Type S drywall screws spaced 24″ on center. Face layer 5/8″ Type X gypsum board applied at right angles to steel framing attached through base layer with 1 5/8″ Type S drywall screws 12″ on center at end joints and intermediate joints and 1 1/2″ Type G drywall screws 12 inches on center placed 2″ back on either side of face layer end joints. Joints of the face layer are offset 24″ from the joints of the base layer. 2 5 GA. MTL STUD 3-5/8"x1-1/4" @24"O.C.(TYP) ICC-ESR-3016 (3) #8 WOODSCREWS /EACH CORRIDOR DOUBLE 5/8" DRY WALL FIN. TYPE "X" GYP. BD. 5/8" DRY WALL FIN. TYPE "X" GYP. BD. 5/8" DRY WALL FIN. TYPE "X" GYP. BD.DOUBLE 5/8" DRY WALL FIN. TYPE "X" GYP. BD.25 GA. MTL TRACK3-5/8"x1-1/4"W/(2)#8 METAL SCREW 25GA. MTL STUD3-5/8"x1-1/4"ICC # ESR-3016 @24" O.C 10'-6"A.F.F10'-6"A.F.F 25GA. MTL BRACING3-5/8"x1-1/4"ICC # ESR-3016 @48" O.C ONE HOUR FIRE RATED CEILING: 10'-6"A.F.F DRINKING FOUNTAIN DETAIL H/ C TOILET DETAIL ∅5'-0"∅5'-0" 4' - 1 1 " 59 " M I N . @ F L O O R M O U N T E D 3' - 0 " CLEARANCE DOOR PERMITTED TO SWING OVERHATCHED PORTION OF MANEUVERINGSPACE 5'-0"2'-10"4'-11" 1'-6"1'-6" 2' - 1 0 " 3'-0"4'-11"5'-0" 7' - 1 1 " 7' - 1 1 " 4' - 7 " 7'-4" 5'-1"5'-3" 1'-6"1'-6" 4' - 1 1 " 3' - 0 " 5'-1"1'-6"3'-0"4'-11" 3' - 3 " 4' - 7 " ACCESSIBLE WATER CLOSET COMPARTMENTS SHALL COMPLY WITH THE FOLLOWING: I. THE WATER CLOSET COMPARTMENT SHALL BE EQUIPPED WITH A DOOR THAT HAS AN AUTOMIATIC-CLOSING DEVICE, AND SHALL HAVE A CLEAR, UNOBSTRUCTED OPENING WIDTH OF 32 INCHES WHEN LOCATED AT THE END AND 34 INCHES WHEN LOCATED AT THE SIDE WITH THE DOOR POSITIONED AT AN ANGLE OF 90 DEGREES FROM ITS CLOSED POSITION. PER CBC 11B-213 CEILING SECTION DETAIL 5' - 0 " 59 " M I N . @ F L O O R M O U N T E D CLEARANCE NOTE: ONE HOUR FIRE-RATED CORRIDORS ARE REQUIRED PER CBC SEC. 1020 NO. C31901 Exp.12/31/26 S A E E D MAPRO R I F B C S ETATOF SIG RE NETJE . O H F I C S L I AL E. N IN GN E RE AINOR GI N N - L VIC LI 90 0 S B A L D W I N A V E . AR C A D I A C A 9 1 0 0 7 2' - 1 0 " 4 BUILDING CORRECTION 1-8-2019 HAND SINK CLEARANCES 9" M I N 27 " M I N 29 " M I N 34 " M A X 6"MAX TOE CLEARANCES 19"MIN KNEECLEARANCES30"WIDE 8" MIN. 11 MIN. DEEP CMU SECTION DETAIL 3" C L R 30" 12 " FINISHED GRADE 4" D-3 8'-4" 5' - 8 " 7'-8" 8'-4" 5' - 8 " 9' - 6 " 7'-8" 9' - 6 " 6' - 0 " 2' - 5 " 8' - 6 " ENCLOSE THE TRASH CAN ELEVATIONENCLOSE THE TRASH CAN FLOOR PLAN 8"2X4 WOOD RAFTER 4X4 METAL POST METAL DOOR 2X4 WOOD RAFTER CMU WALL( 1 HOUR FIRE RATED) 4X4 METAL POST CMU CMU 8' - 0 " 6' - 0 " 4X6 BEAM 2X4 WOOD RAFTER 4X6 BEAM 8" 1' - 0 " 8" MASONRY 1. STANDARD CONCRETE BLOCK SHALL CONFORM TO ATSM C90-06B, GRADE N-1(STANDARD 21-4). 2. MINIMUM STRENGTH OF GROUT (U.N.O): F'M = 2,000 PSI. 3. GROUT MIX: 1 PART CEMENT, 3 PARTS SAND, 2 PARTS PEA GRAVEL (3/8" MAX.) 4. GROUTER MIX: 1 PART CEMENT, 1/4 PART LIME PUTTY, 3 1/2 PARTS DAMP LOOSE SAND. 5. SET AND BRACE VERTICAL REINFORCING BEFORE LAYING MASONRY UNITS. 6. LAP ALL REINFORCING BARS 48 DIAMETER 2 SPLICES UNLESS OTHERWISE NOTE. 7. PROVIDE 1/2" CLEAR TO ALL REINFORCING STEEL. STEEL SPLICES MAY BE TIED. 8. GROUT ALL BLOCK MASONRY CELLS SOLID IN 6'-0" MAXIMUM LIFTS. 9. PROVIDE 3/4" MINIMUM GROUT AROUND ALL ANCHOR BOLTS. 10. PROVIDE VERTICAL MASONRY CONTROL JOINTS AT 20 FT. O/C MAXIMUM. 11. REINFORCING STEEL: A.) ASTM A615, GRADE 40 FOR #4 OR SMALLER BARS. B.) ASTM A615, GRADE 60 FOR #5 AND LARGER BARS. (PER 2022 CBC-606.3) Provide a toe clearance of 9 inches minimum above the finish floor and 6 inches deep minimum beyond the compartment-side face of the partition. SEE DETAIL"G" PER CBC 11B-604.8.1.4 6 BUILDING CORRECTION 3-22-2019 13 " 18" PARTITION DETAIL PER FIG.11B-604.8.1.4(a) (3) #8 METALSCREWS /EACH CANCEL (NOT PART OF THE PERMIT) 8 REVISION 2-3-2025 HANDICAPED DETAIL WALL-MOUNTED WATER CLOSETS SIDE VIEW FRONT VIEW 1 A. F . F . TYPICAL RESTROOM WALL SIGNAGE Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. HD-1 Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. E-1 T-24 1)ALL ELECTRICAL WORK SHALL BE DESIGNED PER 2014 LOS ANGELES COUNTY ELECTRICAL CODE, 2013 CALIFORNIA ELECTRICAL CODE, AND 2011 NATIONAL ELECTRICAL CODE 2)110.3(B) THIRD PARTY LISTING: ADD NOTE ON THE PLANS STATING "ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY UL OR A LOS ANGELES COUNTY APPROVED THIRD PARTY TESTING FACILITY." PER SECTION 11 0.3(B). 4 21 POWER PLAN ':+56+0))0& 2 #5 / # ' #/28Œ9#+%$75 2 # / $ ' 5+0).'.+0'&+#)4#/ 3 2#2# #(#( %Ä )0&%Ä )0& ' 6(75' ' 6(75' Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. E-2 CentralVacuum TV TV TVTV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TVTV TV TV TV TV TVTV TV POWER PLAN EXHAUST FAN MIN 75 CFM REFLECTED CEILING PLAN Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. E-3 SWITCH AUTO TIME OVERRIDESWITCH St EX PANEL "B" EX PANEL "A" DAYLIT ZONE RESTROOM INTERLOCK SWITCH WITH LIGHT AND EXH.FAN RESTROOM INTERLOCK SWITCH WITH LIGHT AND EXH.FAN PS PS PHOTO SENSOR 1a 1a 1a 1a 1a 1a 1a 3b 3b 3c 3c 3e 3e 3f 3f 3ef 3bc 3g 3g 3h 3h 3i3i3j 3ij 3k 3m 3m 3m 3m 3k 3k 3k 3n 3n 3p 3np 3km 3p3q 3q 3r 3qr 3r 3s 3s 3t 3st 3t3u 3uv 3u 3v 3v 5x 5x 5x 5x 5y 5y5y 5y 5xy 1a 5a 5a 5b 5ab 5b5c 5c 5d 5d 5d5e 5e 5f 5e 5f5g 5g 5h 5h 5gh 5i 5i 5j 5ij 5j 5j 5i 5k 5k 5k 5m 5m5m 5km 5x 5x 5y 5n 5n 5p 5np 5q 7rs 7r7s 7tu 7t 7t 7t7t 7t 7t 7t 7t 7t 7t 7t 7u 7u 7u 7u 7u 7u7u 7u 7u 7u7u CEILING PLAN 1bc 1b 1a 1a 1a 1a 1a 1a 1a 1b 1b 1c 1c 1c Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. E-4 ROOF PLAN 3/4"C 3#8&1#10 GND 3/4"C 3#8&1#10 GND 3/4"C 3#8&1#10 GND GENERAL NOTES DUCT FLASHING CLEAT CLEAT DUCT CURB MIN. 4" HIGH FLASHING ROOFING SPIRAL 18 GA. FROM EXHAUST FAN NOT TO SCALE 2 1- 3 NOT TO SCALE The person with overall responsibility for construction or the person responsible for the installation of regulated features, materials, components, or manufactured devices shall post, or make available with .the building permit(s) issued for the building, the required Installation Certificate(s) for features, materials, components, or manufactured devices regulated by the Appliance Efficiency Regulations or Part 6. Such Installation Certificate(s) shall be made available to the enforcement agency for,all appropriate inspections. These ce'rtificates shall: i) Identify features, materials, components, or manufactured devices required to verify compliance with the Appliance Efficiency Regulations and Part 6. ii) Include a statement indicating that the features, materials, components, or manufactured devise conform to the Appliance Efficiency RegUlations and Part 6 and the requirements for such features, materials, components, or manufactured devices given in the plans and specifications approved by the local enforcement agenc,y . iii) State the, number of the building permit under which the construction or installation was performed. Within 90 days after issuance of certificate of occupancy record drawings shall be provided to the owner. If a building design feature, material, component or manufactured device is changed before final construction and installation, such that the building may no longer comply with Part 6, the building must be brought into compliance, and so indicated on amended plans and Certificate of Compliance(s) that shall be submitted for approval. Sec.10-103 (a) 2B C.) The builder shall provide the building owner or the person(s) responsible for building maintenance (in case of multi-tenant or centrally operated buildings) at occupancy the following: 1) Operating information: The appropriate certificate(s) of compliance and a list of the features, materials, components, and mechanical devices installed in the building and instructions on how to operate them efficiently. 2) Maintenance information: Required routine maintenance actions shall be clearly stated and incorporated on a readily accessible label. The label maY be limited to identifying the operation and maintenance manual. 3) Ventilation information: A description or the quantities of outdoor and recirculated air that the ventilation systems are designed to provide to each area.Sec. 10-103 (b) 2,3 &4 All insulating material shall be installed in. compliance with the fLamespread rating and smoke density requirements of the CBG. Sec. 110.8 (c) The Lesser of the minimum rate of outdoor air required by Sec. 120.1 (b) 2, or three complete air changes shall be supplied to the entire building during the one-hour period immediately before the building is normally occupied. Sec. 120.1 (c) 2 All air distribution system ducts and plenums, including, but not limited to, building cavities, mechanical closets, air-handler boxes and support platforms 'used as ducts or plenums, shall be installed, sealed and insulated to meet the requirements of the 2013 California Mechanical Code and SMACNA -006-2006 HVAC Duct Constriction Standards. Supply-air and return-air ducts conveying heated or cooled air shall be insulated to a minimum installed level of R-8, unless ducts are in conditioned space. The thermostatic controls for HVAC systems shall, meet the following requirements as applicable: ' a) Each space conditioning zone shall be controlled by an individual thermostatic control that responds to temperature within the zone and meets the applicable requirements of Section (b). b) Each Thermostatic control required by Section (a) shall be capable of being set locally or remotely by adjustment or selection of sensors to control: 1)&RPIRUWKHDWLQJGRZQWRr2)RUORZHU 2)&RPIRUWFRROLQJXSWRr)RUKLJKHU 3) Both heating and cooling, the thermostatic controls shall be capable of providing a temperature range or dead band of at least 5 OF within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Sec. 120.2 (a) & (b) OutdoorairsuPplyandeXhaustequipmentshallbe installed with dampers that automatically close upon fan shutdown. Sec. 120,2 (f) EACH SPACE -conditioning system shall be installed with controls that comply with The FOLLOWING 1.) Capable of automatically shutting off the system during periods of non-use and shall have: a) An automatic time switch control device complying with Sec. 110.9, with an accessible manual override that allows operation of the system for up to 4 hours; or b) An occupancy sensor; or c) A four-hour timer that can be manually operated. EXCEPTION: Mechanical systems serving retail stores and associated malls, restaurants, grocery stores, churches, and theaters equipped with 7-day programmable timers. 2) Automatically restart and temporarily operate the system as required to maintain: . a) A setback heating thermostat setpoint, if the system provides mechanical heating; (;&(37,21$UHDZLWKWKHGHVLJQZLQWHURXWGRRUWHPSHUDWXUHRIJUHDWHUWKDQr) b) A setup cooling thermostat setpoint, if the system provides mechanical cooling. (;&(37,21$UHDZLWKWKHGHVLJQVXPPHURXWGRRUWHPSHUDWXUHRIOHVVWKDQr) The piping for all space conditioning and service water heating systems shall be insulated in accordance with TABLE 120.3 -A. .Sec. 120.3 WATER HEATING SYSTEM SHALL BE EQUIPPED WITH AUTOMATIC temperature CONTROLS CAPABLE OF adjustment Trom the LOWEST to The HIGHEST acceptable temperature settings for the intended use as listed in Table 2, Chapter 9 of the ASHRAE Handbook, HVAC APPLICATIONS Volume, service water heating systems and equipment shall meet the applicable requirements of the Appliance Efficiency Regulations. as required by Sec. 110.1. Sec. 110.3 (b) Lavatories in public restrooms shall have controls that limit the water supply temperature to 110 rF. .Sec.110.3 (c) 3 Air Conditioning System (HVAC) Compliance: The following items represent additional information required on the plans, or comments) regarding the energy calculations for mechanical compliance. A.) Indicate on the plans the HVAC equipment location, manufacturer, model no., heating/cooling and supply air capacities, and heating/cooling efficiencies. Submit manufacturer's data sheets for verification. B.) Indicate manufacturer's name, model no., type, capacity, and the location of water heater on the plans. C.)Energy calculation indicates lighting credit. Electrical plan checker verification is required for: 1.)Proposed lighting power density of watts/square feet 2) Using the tailored method. Based on the Compliance Approach or credit in the Performance Compliance Approach, the following acceptance tests are required. Please follow the instructions on the Certificate of Compliance (NRCC-MCH-01-E) to cornplete the form (List all equipment that require an acceptance test and state who is responsible for performing each acceptance test). Duct systems used with blower type equipment which are portions of a heating, cooling, absorption, evaporative cooling or outdoor air ventilation system shall be sized in accordance with Chapter 17 of the California Mechanical Code. Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. M-1 MECH. DETAIL LEGEND MECHANICAL EQUIPMENT SCHEDULE  Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. 400 CFM400 CFM 1300 CFM 300 CFM 100 CFM 200 CFM 200 CFM 200 CFM 200 CFM 200 CFM 100 CFM 100 CFM 100 CFM 200 CFM 200 CFM 400 CFM ‘ 100 CFM 300 CFM 200 CFM 200 CFM 200 CFM 300 CFM 200 CFM ‘ ‘ 12X12CD 12X12CD 12X12CD 18X18RG ‘ 10X10CD 10X10CD 10X10RG 8X8RG 8X8RG 10X10RG 10X10CD 10X10CD 10X10CD 10X10CD 10X10CD 8X8CD 10X10CD 200 CFM 10 X10 CD 10X10CD 8X8CD 8X8CD 10X10CD 10X10CD 10X10CD ‘‘‘ ‘‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘‘ ‘‘ ‘ ‘ ‘‘‘ ‘‘ ‘ ‘ ‘ ‘‘ ‘ 400 CFM 12X12CD 400 CFM 12X12CD ‘ ‘‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘‘‘‘ 200 CFM 8X8CD ‘ ‘ ‘ ‘ ‘ 200 CFM 10X10CD 200 CFM 10X10CD 200 CFM 10X10CD ‘‘‘ 200 CFM 10X10CD ‘ 150 CFM8X8RG ‘ ‘‘‘ ‘ ‘  M-2 ‘ 300 CFM10X10RG 150 CFM8X8RG 150 CFM8X8RG 150 CFM 8X8RG 150 CFM8X8RG150 CFM8X8RG 300 CFM10X10RG 150 CFM 8X8RG150 CFM8X8RG150 CFM8X8RG      ‘  ‘ ‘‘ ‘‘ ‘‘ A/C DUCT LAYOUT PLAN    Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. M-3 ROOF PLAN Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. M-4 MECH. T-24 M-5 Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. MECH. T-24 M-5 Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. M-6 MECH. T-24 Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. P-1 Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. P-2 FLOOR PLAN (HOT & COLD) 1/4"=1'-0"NOTES: Potable water supply to beverage dispensers, carbonated beverage dispensers, or coffee machines shall be protected by an air gap or an approved vented backflow preventer (VBFP) in accordance with ASSE 1022. VENTED BACKFLOW PREVENTER(VBFP) Not for construction until reviewed, signed, and dated. A Project for: A 2 3 4 5 6 7 8 9 1211 A10 B C E F G 1 2 9876543 121110 J I G F E D C B H 13 131 SO L I D W A Y C O N S T R U C T I O N G R O U P 倯ᾝ ᔪ ㇹ 㼍 ؞ 䳶 ൈ DC & Consulting Inc. P-3 FLOOR PLAN (WASTE & VENT) 1/4"=1'-0" SHEET INDEX S-S STRUCTURAL COVER SHEET AND NOTES S-1 ROOF PLAN AND DETAILS GENERAL NOTES: 1. ALL WORK SHALL CONFORM TO THE CALIFORNIA BUILDING CODE 2022 EDITION. 2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE JOB SITE WITH COMPLETE SET OF LATEST DRAWINGS PRIOR TO START OF CONSTRUCTION. NOTES AND DIMENSIONS SHALL BE CHECKED AND VERIFIED WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS; ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT STRUCTURAL ENGINEER OF RECORD BEFORE COMMENCING WORK, SO THAT PROPER REMEDIAL WORK CAN BE EXECUTED. 3. UNLESS SPECIFICALLY DETAILED ON THESE DRAWINGS, CONTRACTOR SHALL FURNISH AND INSTALL ADEQUATE SHORING, BRACING, ETC. REQUIRED TO SAFELY EXECUTE ALL WORK AND SHALL BE FULLY RESPONSIBLE FOR THE SAME. 4. DETAILS AND CONDITIONS NOT SPECIFICALLY SHOWN SHALL BE CONSTRUCTED IN ACCORDANCE WITH DETAILS SHOWN FOR SIMILAR CONDITIONS AND MATERIAL. 5. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS THE BEST PRESENT KNOWLEDGE, BUT WITHOUT GUARANTEE OF ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH THE DRAWINGS THEY SHALL BE REPORTED TO THE STRUCTURAL ENGINEER OF RECORD SO THAT THE PROPER REVISIONS MAY BE MADE. MODIFICATIONS OF DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER OF RECORD. 6. BUILDING SHALL NOT BE OCCUPIED DURING REMODEL WORK WHERE: A. THE BUILDING STRENGTH IS SUBSTANTIALLY WEAKENED AT ANY POINT DURING THE REMODEL WORK. B. REQUIRED EXITS ARE NOT AVAILABLE OR ARE OBSTRUCTED. C. REQUIRED FIRE SAFETY DEVICES SUCH AS SPRINKLERS, STANDPIPES, AND THE ALARM SYSTEMS ARE NOT OPERATIONAL. 7. WHERE REQUIRED NECESSARY PERMITS FROM PUBLIC WORKS SHALL BE SECURED AND THE NECESSARY BARRIERS, PROTECTION FENCES AND/OR CANOPIES SHALL BE ERECTED ALONG PUBLIC WAYS PRIOR TO STARTING CONSTRUCTION. 8. A SEPARATE MECHANICAL PERMIT SHALL BE SECURED FOR ALL ELECTRICAL, PLUMBING AND HEATING-VENTILATING WORK. 9. STRUCTURAL ELEMENTS (INCLUDING WALLS & FOOTINGS) WHICH PROJECT INTO PUBLIC PROPERTY REQUIRES PUBLIC WORKS APPROVAL PRIOR TO ISSUANCE OF BUILDING PERMIT. 10. THE CALCULATIONS & DESIGN ARE TO CONFORM TO THE EXISTING CONDITIONS AS NOTED ON THE DRAWINGS, AND THEY DO NOT TAKE INTO ACCOUNT ANY FUTURE LOADINGS. 11. NO CALCULATIONS HAVE BEEN MADE TO DETERMINE THE ADEQUACY OF THE EXISTING STRUCTURE FOR BOTH FRAMING AND LATERAL LOAD RESISTING SYSTEMS UNDER THE CURRENT BUILDING CODE. 12. IN THE EVENT OF CONFLICT BETWEEN THESE REQUIREMENTS AND THOSE OF GOVERNING AGENCIES, THE MORE STRINGENT SHALL APPLY, SUBJECT TO THE ACCEPTABILITY OF THE GOVERNING AGENCY AND THE CONTRACTOR NOTIFYING THE ENGINEER OF ANY DEVIATIONS PRIOR TO PROCEEDING. 13. PLANS AND DETAILS WERE DEVELOPED BASED UPON A FIELD INVESTIGATION BY THE STRUCTURAL ENGINEER OF RECORD AND REFLECT THE ACTUAL CONDITIONS OF THE BUILDING AS OBSERVED. 14. IN ADDITION TO THE INSPECTIONS TO BE MADE BY EMPLOYEES OF THE BUILDING DEPARTMENT, THE OWNER SHALL EMPLOY A REGISTERED DEPUTY INSPECTOR PER DEMAND FROM BUILDING INSPECTOR. 15. STRUCTURAL OBSERVATION IS REQUIRED FOR THE STRUCTURAL SYSTEM. STRUCTURAL OBSERVATION IS THE VISUAL OBSERVATION OF THE ELEMENTS AND CONNECTIONS OF THE STRUCTURAL SYSTEM AT SIGNIFICANT CONSTRUCTION STAGES AND THE COMPLETED STRUCTURE FOR GENERAL CONFORMANCE TO THE APPROVED PLANS. STRUCTURAL OBSERVATION DOES NOT WAIVE THE RESPONSIBILITY FOR THE INSPECTIONS REQUIRED OF THE BUILDING INSPECTOR OR THE DEPUTY INSPECTOR. MAXIMUM MANUFACTURER MIDDLE MINIMUM MISCELLANEOUS NEW NATURAL NORTH-SOUTH NOT-APPLICABLE NUMBER NEAR SIDE NOT TO SCALE ON CENTER ORIENTED STRAND BOARD POST ABOVE PLAN CHECK CORRECTION PARTIAL JOINT PENETRATION PRESSURE TREATED PROPERTY LINE PLY/PLWD PLYWOOD PLATE POUND PER SQUARE FOOT POUND PER SQUARE INCH PARALLEL STRAND LUMBER RADIUS REFER, REFERENCE REINFORCING REQUIRED ROOF RAFTER SCHEDULE STRUCTURAL COMPOSITE LUMBER SEISMIC DESIGN CATEGORY SHEET SHEATHING SIMILAR SIMPSON STRONG-TIE STRUCTURAL OBSERVATION SPACE/SPACING SILL PLATE SPECIFICATIONS STAINLESS STEEL STAG/STAGG: STAGGERED STANDARD STEEL STRUCTURAL SHEAR WALL TOP & BOTTOM TOP CHORD OF A TRUSS THICKNESS TOE NAIL TOP OF CONCRETE TOP OF STRUCT WOOD DIAPHRAGM TOP OF FLOOR FRAMING TOP OF STRUCTURAL STEEL TOP OF WALL TOP PLATE TOP PLATE ELEVATION TRANSVERSE SEE 'LSL' TYPICAL UNLESS NOTED OTHERWISE VALLEY VERTICAL WIDTH WOOD WITH WIDE FLANGE STRUCTURAL STEEL MAX MANU MID MIN MISC (N) NAT N-S N/A NO/# NS NTS OC OSB PA PCC PJP PT PL PLY/PLWD PLT PSF PLI PSL R REF REINF REQ RR SCH SCL SDC SHT SHTG SIM SIMP SO SPA SP SPEC SS STAG/STAGG STD STL STR/STRUCT SW T&B TC THK TN TOC TOD TOF TOS TOW TP TPE TRAN/TRANS TS TYP UNO/UON VAL VER/VERT W WD W/ W8x28" A35/A34/LTP4/CCQ/CS/ECCQ/GLT/HU/HUC/ HUTF/HUS/HHUS/HHGUS/LUS/MST/MSTC/ CMST/SDS/SSTB/ST/(E.T.C.): TYPICAL SIMPSON HARDWARE MODELS LIST OF ABBREVIATIONS THE FOLLOWING ARE COMMONLY USED ABBREVIATIONS. IN SOME CASES, THERE MAY BE MORE THAN ONE MEANING FOR AN ABBREVIATION. IN THESE CASES,IF THE MEANING OF THE ABBREVIATION IS NOT CLEAR BY CONTEXT, CONTACT THE ENGINEER FOR AN INTERPRETATION. AB ABV ADD'L AF ALT ARCH AT @ BC BL BLDG BLKG BM BOT BN BSMT BEY BP BS C8x15 CJ CJP CL CLR CLG CMU CONC CON CONT COL COOR CTR DBL DFL DIS DL: DEAD LOAD DIA OR Ø DIAP DIR (E) EA EF ELEV EMB EN ENG EOR EQ ES EW E-W EXT E/ FFE FB FIN FJ FLR FT FTG FOUN FRM FS F/W GR GLB HD HDR HNG HOR/HORIZ HT HSS INT INV JST KP L L4x4x1/4 LBS LSL LVL LW LONG ANCHOR BOLT ABOVE ADDITIONAL ARTIFICIAL FILL ALTERNATE ARCHITECT ATT-THREADED AT BOTTOM CHORD OF A TRUSS BELOW BUILDING BLOCKING BEAM BOTTOM BOUNDARY NAIL BASEMENT BEYOND BASE PLATE/BOTTOM PLATE BOTH SIDES STEEL CHANNEL CEILING JOIST COMPLETE JOINT PENETRATION CENTERLINE CLEAR CEILING CONCRETE MASONRY UNIT CONCRETE CONNECTION CONTINUOUS COLUMN COORDINATE CENTER DOUBLE DOUGLAS FIR LARCH DISTANCE DEAD LOAD DIAMETER DIAPHRAGM DIRECTION EXISTING EACH EACH FACE ELEVATION EMBEDMENT EDGE NAIL ENGINEER OR ENGINEERED ENGINEER OF RECORD EQUAL EACH SIDE EACH WAY EAST-WEST EXTERIOR EDGE OF FLOOR FINISH ELEVATION FLOOR BEAM FINISH FLOOR JOIST FLOOR FOOT FOOTING FOUNDATION FRAMING FAR SIDE FACE OF WALL GRADE 24F-V4 GLULAM BEAM HOLDOWN HEADER HANGER HORIZONTAL HEIGHT HOLLOW STRUCTURAL STEEL INTERIOR INVERTED JOIST KING POST LENGTH STEEL ANGLE POUND LAMINATED STRAND LUMBER LAMINATED VENEER LUMBER LIGHT WEIGHT LONGITUDINAL S-S 36 0 E D U C A T I O N A C A D E M Y RA Y L I U A S S O C I A T E S , C O R P . 34 5 2 E A S T F O O T H I L L B O U L E V A R D , S U I T E 6 2 0 PA S A D E N A , C A 9 1 1 0 7 T. 6 2 6 - 5 2 9 - 3 8 5 8 F . 6 2 6 - 5 2 9 - 3 4 6 8 E M A I L : R A Y @ R A Y L I U A S S O C I A T E S . C O M ST R U C T U R A L C O V E R S H E E T A N D N O T E S S-1 36 0 E D U C A T I O N A C A D E M Y RA Y L I U A S S O C I A T E S , C O R P . 34 5 2 E A S T F O O T H I L L B O U L E V A R D , S U I T E 6 2 0 PA S A D E N A , C A 9 1 1 0 7 T. 6 2 6 - 5 2 9 - 3 8 5 8 F . 6 2 6 - 5 2 9 - 3 4 6 8 E M A I L : R A Y @ R A Y L I U A S S O C I A T E S . C O M RO O F P L A N A N D D E T A I L S JobNo.: 18Ͳ196 Date: 11/19/2018 Tel:(626)308Ͳ2196Fax:(626)308Ͳ2195 AT 900SBaldwinAve. Arcadia,CA91007 Preparedfor: DCDesign&ConsultingInc. 1211NAzusaCanyonRd,#B WestCovina,CA91790 Tel:(626)962Ͳ0997 Preparedby : Ray Liu Associates, Corp. 600WestMainStreet,Suite#212,Alhambra,CA91801 Fax:(626)962Ͳ0229 ARCADIA,CA STRUCTURALCALCULATION FOR 360EDUCATIONACADEMY 10/29/2023 STRUCTURAL CALCULATION JOB NO.: TABLE OF CONTENTS 1. USGS Seismic Design Map ……………………………………………… 2. RTU Lateral/Vertical Analysis ……………………………………………… Appendix 1 - Unit Dimensions ……………………………………………… 18-196 1 4 8 Page 1 Page 2 Page 3 Page 4 1.609 1.609 1.609 0.78 0.78 0.49 2.57 0.78 349 Page 5 349 243 243 4860 Wood Beam ENERCALC, INC. 1983-2017, Build:10.17.12.10, Ver:6.18.7.31 Licensee : Ray Liu Associates, Corp.Lic. # : KW-06011524 File = X:\CURREN~1\18-196~1.BAL\CALCUL~1\18-196.ec6 Description :Unit Support Check (Double Joist) Ray Liu Associates, Crop. 600 West Main Street, Suite #212 Alhambra, CA 91801 Tel: (626)308-2196 Fax: (626)308-2195 Email:ray@rayliuassociates.com Project Title:360 Education AcademyEngineer:Y.H.Project ID:18-196Project Descr:RTU Calculation CODE REFERENCES Calculations per NDS 2018, IBC 2021, CBC 2022, ASCE 7-16 Load Combination Set : IBC 2021 Material Properties Beam Bracing :Beam is Fully Braced against lateral-torsional buckling Allowable Stress Design Douglas Fir - LarchNo.2 900.0 900.0 1,350.0 625.0 1,600.0 580.0 180.0 575.0 31.20 Analysis Method : Eminbend - xx ksi Wood Species :Wood Grade : Fb +psi psi Fv psi Fb - Ft psi Fc - Prll psi psiFc - Perp E : Modulus of Elasticity Ebend- xx ksi Density pcf Load Combination :IBC 2021 Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loads Point Load : D = 0.1110 k @ 6.0 ft, (RTU Corner Weight) Point Load : D = 0.1850 k @ 10.0 ft, (RTU Corner Weight) Uniform Load : D = 0.0150, L = 0.020 ksf, Tributary Width = 2.0 ft, (DL) DESIGN SUMMARY Design OK Maximum Bending Stress Ratio 0.835: 1 Load Combination +D+L+H Span # where maximum occurs Span # 1Location of maximum on span 9.216ft 33.60 psi= = FB : Allowable 900.00psi Fv : Allowable 2-2x12Section used for this span Span # where maximum occursLocation of maximum on span Span # 1= Load Combination +D+L+H= = = 180.00 psi== Section used for this span 2-2x12 fb : Actual Maximum Shear Stress Ratio 0.187 : 1 0.000 ft== 751.10psi fv : Actual Maximum Deflection 0<360556Ratio =0<240 Max Downward Transient Deflection 0.146 in 1429Ratio =>=360Max Upward Transient Deflection 0.000 in Ratio = Max Downward Total Deflection 0.375 in Ratio =>=240Max Upward Total Deflection 0.000 in Maximum Forces & Stresses for Load Combinations Span # Moment ValuesLoad Combination C i CLCCCCF/V mr td Shear ValuesMax Stress Ratios M CV fbM fvF'b VF'vSegment Length +D+H 0.00 0.00 0.000.001.00Length = 17.416 ft 1 0.575 0.122 0.90 1.000 1.00 1.00 1.00 2.46 465.67 810.00 0.44 162.001.00 19.70 1.00+D+L+H 1.000 1.00 1.00 1.00 0.00 0.00 0.001.00 0.00 1.00Length = 17.416 ft 1 0.835 0.187 1.00 1.000 1.00 1.00 1.00 3.96 751.10 900.00 0.76 180.001.00 33.60 Page 6 Wood Beam ENERCALC, INC. 1983-2017, Build:10.17.12.10, Ver:6.18.7.31 Licensee : Ray Liu Associates, Corp.Lic. # : KW-06011524 File = X:\CURREN~1\18-196~1.BAL\CALCUL~1\18-196.ec6 Description :Unit Support Check (Double Joist) Ray Liu Associates, Crop. 600 West Main Street, Suite #212 Alhambra, CA 91801 Tel: (626)308-2196 Fax: (626)308-2195 Email:ray@rayliuassociates.com Project Title:360 Education AcademyEngineer:Y.H.Project ID:18-196Project Descr:RTU Calculation Span # Moment ValuesLoad Combination C i CLCCCCF/V mr td Shear ValuesMax Stress Ratios M CV fbM fvF'b VF'vSegment Length 1.00+D+Lr+H 1.000 1.00 1.00 1.00 0.00 0.00 0.001.00 0.001.00Length = 17.416 ft 1 0.414 0.088 1.25 1.000 1.00 1.00 1.00 2.46 465.67 1125.00 0.44 225.001.00 19.701.00+D+S+H 1.000 1.00 1.00 1.00 0.00 0.00 0.001.00 0.00 1.00Length = 17.416 ft 1 0.450 0.095 1.15 1.000 1.00 1.00 1.00 2.46 465.67 1035.00 0.44 207.001.00 19.70 1.00+D+0.750Lr+0.750L+H 1.000 1.00 1.00 1.00 0.00 0.00 0.001.00 0.001.00Length = 17.416 ft 1 0.604 0.134 1.25 1.000 1.00 1.00 1.00 3.58 679.50 1125.00 0.68 225.001.00 30.121.00+D+0.750L+0.750S+H 1.000 1.00 1.00 1.00 0.00 0.00 0.001.00 0.00 1.00Length = 17.416 ft 1 0.657 0.146 1.15 1.000 1.00 1.00 1.00 3.58 679.50 1035.00 0.68 207.001.00 30.121.00+D+0.60W+H 1.000 1.00 1.00 1.00 0.00 0.00 0.001.00 0.001.00Length = 17.416 ft 1 0.323 0.068 1.60 1.000 1.00 1.00 1.00 2.46 465.67 1440.00 0.44 288.001.00 19.70 1.00+D+0.70E+H 1.000 1.00 1.00 1.00 0.00 0.00 0.001.00 0.00 1.00Length = 17.416 ft 1 0.323 0.068 1.60 1.000 1.00 1.00 1.00 2.46 465.67 1440.00 0.44 288.001.00 19.701.00+D+0.750Lr+0.750L+0.450W+H 1.000 1.00 1.00 1.00 0.00 0.00 0.001.00 0.001.00Length = 17.416 ft 1 0.472 0.105 1.60 1.000 1.00 1.00 1.00 3.58 679.50 1440.00 0.68 288.001.00 30.12 1.00+D+0.750L+0.750S+0.450W+H 1.000 1.00 1.00 1.00 0.00 0.00 0.001.00 0.00 1.00Length = 17.416 ft 1 0.472 0.105 1.60 1.000 1.00 1.00 1.00 3.58 679.50 1440.00 0.68 288.001.00 30.121.00+D+0.750L+0.750S+0.5250E+H 1.000 1.00 1.00 1.00 0.00 0.00 0.001.00 0.00 1.00Length = 17.416 ft 1 0.472 0.105 1.60 1.000 1.00 1.00 1.00 3.58 679.50 1440.00 0.68 288.001.00 30.12 1.00+0.60D+0.60W+0.60H 1.000 1.00 1.00 1.00 0.00 0.00 0.001.00 0.001.00Length = 17.416 ft 1 0.194 0.041 1.60 1.000 1.00 1.00 1.00 1.47 279.40 1440.00 0.27 288.001.00 11.821.00+0.60D+0.70E+0.60H 1.000 1.00 1.00 1.00 0.00 0.00 0.001.00 0.00 1.00Length = 17.416 ft 1 0.194 0.041 1.60 1.000 1.00 1.00 1.00 1.47 279.40 1440.00 0.27 288.001.00 11.82 Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections +D+L+H 1 0.3752 8.772 0.0000 0.000 Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS Overall MAXimum 0.825 0.818 Overall MINimum 0.348 0.348 +D+H 0.476 0.469 +D+L+H 0.825 0.818 +D+Lr+H 0.476 0.469 +D+S+H 0.476 0.469 +D+0.750Lr+0.750L+H 0.738 0.731 +D+0.750L+0.750S+H 0.738 0.731 +D+0.60W+H 0.476 0.469 +D+0.70E+H 0.476 0.469 +D+0.750Lr+0.750L+0.450W+H 0.738 0.731 +D+0.750L+0.750S+0.450W+H 0.738 0.731 +D+0.750L+0.750S+0.5250E+H 0.738 0.731 +0.60D+0.60W+0.60H 0.286 0.282 +0.60D+0.70E+0.60H 0.286 0.282 D Only 0.476 0.469 Lr Only L Only 0.348 0.348 S Only W Only E Only H Only Page 7 PHP:50VTͲ060Ͳ3 UnitDimensions APPENDIX1 Page 8 9 UNIT DIMENSIONS -- 50VT036--060 74 / 3 4 59 / 2 7 89 / 4 0 14 8 / 6 7 98 / 4 5 15 3 / 7 0 82 / 3 7 66 / 3 0 10 8 / 4 9 17 0 / 7 7 82 / 3 7 66 / 3 0 99 / 4 5 16 5 / 7 5 86 / 3 9 6 9 / 3 1 1 0 4 / 4 7 17 3 / 7 8 86 / 3 9 69 / 3 1 11 3 / 5 1 17 8 / 8 1 92 / 4 2 74 / 3 4 11 1 / 5 0 18 5 / 8 4 92 / 4 2 74 / 3 4 1 2 0 / 5 4 1 9 0 / 8 6 74 / 3 4 59 / 2 7 3. 0 A08253 50 V T Page 9