HomeMy WebLinkAbout55 E Duarte Rd #103 - 2025 - Ruyi Catering LLC RestaurantLC
#Ä
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
TI
T
L
E
S
H
E
E
T
,
V
I
C
I
N
I
T
Y
M
A
P
,
P
A
R
C
E
L
M
A
P
,
AN
D
S
I
T
E
P
L
A
N
-
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
7 / 6 / 2025
1
55 E DUARTE RD, #103 ARCADIA, CA 91006
(TENANT IMPROVEMENT)
SITE PLAN
RUYI CATERING LLC. RESTAURANT
1"=10'-0"
NOTE:
JOB SITE
CIVIL ENGINEER :
NAME :
ADD :
TEL. :
FAX. :
E-MAIL :
2
9-
2
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
1
1
2
2
9-
1
6
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
A
6'-
8
"
10
"
S
M
O
O
T
H
3'-
0
"
RESTROOM
5'-
0
"
B
3'-0"
6'-
8
"
10
"
S
M
O
O
T
H
3'-
0
"
3'-6"
3'-
0
"
6'-
8
"
10
"
S
M
O
O
T
H
3'-0"
C
20'-10"
32
'
-
1
1
"
19
'
-
8
"
8'-4"
(E) ALL GENDERRESTROOM51 SF.
7'-1"
7'
-
4
"
DINING AREA
338 SF.
OCCUPANT LOAD:338/15=22
KITCHEN SERVICE AREA
240 SF.OCCUPANT LOAD:240/200=1
HALLWAY35 SF.
30X18
9'
-
0
"
3'-0"
3'
-
9
"
EXIT
F
EXIT
(E) PANEL
34
"
H
M
A
X
.
A
C
B
1
A-2
7"
3'-11"
3'-9"
3'-0"
3'-4"
2'
-
8
"
5'
-
0
"
6"
1'-6"
5'
-
0
"
2'
-
8
"
#
A-2
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
1
F
L
O
O
R
P
L
A
N
,
E
Q
U
I
P
M
E
N
T
SC
H
E
D
U
L
E
,
&
F
I
N
I
S
H
S
C
H
E
D
U
L
E
FLOOR PLAN
1/4"=1'-0"
DOOR SCHEDULE
DESIGNATION QTY.DIMENSIONS (WIDTH X HEIGHT X THICKNESS)TYPE HARDWARE COMMENTS RATING
A
B
C
1
1
1
3'-6" X 6'-8" X 1-3/4"1.5 HOURS
1.5 HOURS
1.5 HOURS
D
SOLID-CORE WOOD DOOR
ALUMINUM, TEMPED GLASS
DOOR PANIC
LEVER3'-0" X 6'-8" X 1-3/4"
HEALTH DEPARTMENT NOTES
1. ALL EQUIPMENT SHALL BE LISTED BY AN ANSI ACCREDITED
SANITATION-TESTING OR ORGANIZATION, E.G., NSF INTERNATIONAL, INTS, OR
U.L. LISTED SANITATION TESTING DEPARTMENTS. ALL USED EQUIPMENT IS
SUBJECT TO APPROVALS AS DETERMINED AT THE TIME OF FIELD INSPECTION.
2. INSTALL PERMANENTLY MOUNTED SINGLE SERVICE SOAP & PAPER TOWEL
DISPENSERS AT OR ADJACENT TO EACH HANDWASHING FAUCET.
3. EACH HANDWASHING SINK SHALL BE PROVIDED WITH ADEQUATE HOT (MIN.
120 F AND COLD WATER FROM A MIXING FAUCET).
4. THE HANDWASH SINK FAUCET SHALL PROVIDE WARM WATER FOR MINIMUM
OF 15 SECONDS WHILE BOTH HANDS ARE FREE FROM WASHING.
5. PROVIDE MINIMUM 48"H WATERPROOF PANEL BEHIND ALL SINKS WALLS AND
18"H BEHIND SIDES OF SINK.
6. ALL EQUIPMENT INSTALLATION TO BE OF STANDARD USE, 6"H METAL LEGS.
7. PROVIDE APPROVED FINISHES FOR ALL FLOOR, COVE BASE, WALL AND
CEILING AT FOOD PREP, LOCKER, STORAGE, KITCHEN, RESTROOM AND SELF
SERVE AREAS. ALL FINISHES SHALL BE SMOOTH, WASHABLE, NON-ABSORBENT,
DURABLE, SEMI-GLOSS AND LIGHT COLORED (70% LIGHT REFLECTIVE VALUE).
8. PROVIDE VACUUM BREAKER FOR MOP SINK.
9. WATER HEATER IS ON 6"H LEGS OR ON 4"H MASONITE CURB WITH 3/4" RADIUS
COVE BASE.
10. PROVIDE SMOOTH LIGHT COLORED WASHABLE CEILING IN FOOD PREP
AREAS.
11. WATER HEATER IF POWERED BY ELECTRICITY NEEDS TO HAVE A MINIMUM 2
PHASE ELEMENT AND MUST HAVE BEEN SIMULTANEOUS.
12. ALL EXTERIOR WINDOWS ARE FIXED
13. ALL ENTRY, DELIVERY, AND RESTROOM DOORS ARE SELF-CLOSING.
14. VENTILATION TO BE PROVIDED IN RESTROOM(S) BY ONE OF THE
FOLLOWING METHODS:
A. LIGHT ACTIVATED EXHAUST FAN
B. AN OPERABLE, SCREENED WINDOW
C. AN AIR SHAFT
15. PROVIDE SIGN "ALL EMPLOYEES MUST WASH HANDS BEFORE RETURNING
TO WORK" IN ALL RESTROOMS.
16. AIR CURTAIN IS DOOR ACTIVATED AT THE DELIVERY DOOR, WITH A MINIMUM
1600 FPM.
NOTE:
1. PREP. SINK IS EQUIPPED WITH A MIN. OF 18" INTEGRAL DRAINBOARD OR IN
THE ABSENCE OF A DRAINBOARD MUST BE LOCATED ADJACENT TO A
STAINLESS STEEL FOOD PREP. TABLE.
2. FLOOR WILL SLOPE 1/4 OF AN INCH TO ALL FLOOR DRAINS.
3. ALL LIGHT FIXTURES ARE SHATTERPROOF.
4. ALL WALLS AND CEILINGS WILL BE SMOOTH, WASHABLE AND LIGHT COLORED
(70% LRV).
5. ALL EXTERIOR DOORS SHALL BE SELF CLOSING AND RODENT PROOF
6. LIGHTING
A) AT LEAST 20-FOOT CANDLES WHERE FOOD IS PROVIDED FOR
CONSUMER SELF-SERVICE; WHERE FRESH PRODUCE OR
PREPACKAGED FOODS ARE SOLD OR OFFERED FOR CONSUMPTION; INSIDE
EQUIPMENT SUCH AS REACH-IN AND UNDER-COUNTER
REFRIGERATORS; HAND WASHING AREAS; WARE WASHING AREAS;
EQUIPMENT AND UTENSIL AREAS; AND IN TOILET ROOMS.
B) AT LEAST 50-FOOT CANDLES AT SURFACES WHERE A FOOD
EMPLOYEE IS WORKING WITH FOOD OR WITH UTENSILS, EQUIPMENT
SUCH AS KNIVES, SLICERS, GRINDERS, OR SAWS WHERE EMPLOYEES
SAFETY IS A FACTOR; AND IN OTHER ROOMS DURING PERIODS OF CLEANING.
CRF-114252
NOTES:
(E) SELF CLOSING
3'-0" X 6'-8" X 1-3/4"
COUNTER ELEVATION
1/4"=1'-0"
SECTION A-A
1/4"=1'-0"
2
SOLID-CORE WOOD DOOR
7 / 6 / 2025
1
1
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
(E) SELF CLOSING
(E) SELF CLOSING
LEVER
RESTROOM DOOR SIGN ELEVATION DETAIL 1
9-
2
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
1
2
9-
1
6
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
RESTROOM INTERLOCK
SWITCH WITH LIGHT
AND EXH. FAN
EXIT
EXIT
F
CH=8'-0"
(E) DRY WALL CEILING
MUA
TYPE-I
HOOD
9'
-
0
"
4'-0"
CH=10'-0"
(E) T-B CEILING
CH=10'-0"
(E) T-B CEILING
CH=15'-0"
(E) ROUGH CEILING
F
EXIT
EXIT
EXIT
(E) ALL GENDERRESTROOM
51 SF.
(E) PANEL
(E) KITCHEN
A-3
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
EX
I
S
T
I
N
G
C
E
I
L
I
N
G
P
L
A
N
1
CEILING PLAN
1/4"=1'-0"
EGRESS NOTES:
A MINIMUM LANDING IN THE DIRECTION OF TRAVEL IS NOT LESS THAN 44".
1.
2.EVERY REQUIRED EXIT DOOR MUST BE OF A SIZE TO PERMIT THE INSTALLATION OF A 3'-0" X 6'-8" DOOR. A
MINIMUM CLEAR WIDTH OF 32" MUST BE APPROVED.
3.
4.
5.
THE FLOOR OR LANDING ON EACH SIDE OF THE DOOR IS NOT MORE THAN 1/2 (1 INCH) LOWER THAN THE
THRESHOLD OF THE DOORWAY.
EXIT DOORS ARE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY, SPECIAL KNOWLEDGE OR
EFFORT.
NO FIRE RESISTANCE IS REQUIRED FOR OCCUPANT GROUPS OF B & M.
DOOR NOTES
1.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE WORKING DRAWINGS. THE
CONTRACTOR SHALL NOTIFY THE DESIGNER OF ANY DISCREPANCIES PRIOR TO COMMENCEMENTS OF ANY WORK IN
THE EVENT OF FAILURE TO DO SO THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTION OF ANY ERROR.
2.PROVIDE HARDWARE AND ACCESSORIES AS REQUIRED FOR RATED AND MINERAL CORE DOORS.
3.CHECK DOOR SCHEDULE FOR DOOR THICKNESS, DETAILS OF TRIM CLEARANCES FOR HINGES, STRIKES, CLOSERS,
FASTENER REQUIREMENTS, AND FIRE RATING REQUIREMENTS.
4.ALL NEW DOORS SHALL RECEIVE LEVER HARDWARE (SEE HARDWARE SCHEDULE) UNLESS NOTED OTHERWISE.
HARDWARE SHALL BE IN COMPLIANCE WITH CALIFORNIA STATE HANDICAPPED REGULATIONS TITLE 24.
5.MAXIMUM ALLOWABLE DOOR CLOSER PRESSURE:
a.INTERIOR DOORS:5 POUNDS
b.EXTERIOR DOORS:8-5 POUNDS
c.FIRE DOORS:15 POUNDS
6.ALL LABELED DOORS SHALL BE TIGHT-FITTING WITH A GASKET SO INSTALLED AS TO PROVIDE A SEAL WHERE THE
DOOR MEETS THE STOP ON BOTH SIDES AND ACROSS THE TOP.
7.GENERAL CONTRACTOR SHALL PROVIDE MANUFACTURERS' CERTIFICATION THAT GLAZING ON DOORS AND WITHIN 4'-0"
OF DOORS SHALL COMPLY WITH APPLICABLE CONSUMER PRODUCT SAFETY STANDARDS.
8.THE CONTRACTOR SHALL DEVELOP AND SUBMIT TO THE DESIGNER FOR APPROVAL AND COMPLETE SCHEDULE OF
FINISH HARDWARE, INDICATING THE QUANTITY, PART NUMBER, INSTALLATION, LOCATION AND FINISH OF EACH ITEM AS
NEEDED FOR A COMPLETE AND PROPER INSTALLATION. BID PRICE SHALL BE BASED ON THE HARDWARE SCHEDULE.
9.HARDWARE SCHEDULE SHALL INCLUDE BUT NOT NECESSARILY BE LIMITED TO: BUTTS, LOCKSETS, LATCHSETS,
CLOSERS, WEATHERSTRIPPING, PANIC HARDWARE, FLOOR HINGES, PIVOTS, KICKPLATES, PULLS, STOPS, ANCHORS,
WALL BUMPERS, THRESHOLDS, DOOR SHOES AND MUTES.
10.ALL DOORS TO HAVE INDIVIDUAL KEYS, STAMPED WITH ROOM NUMBER WITH ONE MASTER KEY. CONTRACTOR TO
SUBMIT 4 SETS OF EACH PRIVATE OFFICE DOOR AND 6 SETS OF KEYS FROM EACH AUXILIARY ROOM.
11.PROVIDE TENANT AN INDIVIDUAL KEY FOR ROOMS WITH "T" STAMPED ON THE KEY.
12.ALL LOCKS MUST BE KEYED TO A MASTER KEY WHICH IS TO BE STAMPED K1 QUANTITY OF 10 MASTER KEYS ARE
REQUIRED.
13.CONTRACTOR TO PREP AND REWORK AND DRILL EXISTING DOORS AS WELL AS NEW DOORS TO RECEIVE SECURITY
HARDWARE WHEN APPLICABLE.
PARTITION NOTES
1.THE CONTRACTOR SHALL FURNISH AND INSTALL ALL PARTITIONS INDICATED ON THE DRAWINGS.
2. PARTITION DIMENSIONS ARE FINISH FACE U.O.N CENTER LINE OF PARTITION SHALL ALIGN WITH CENTER LINE OF
MULLION WHERE OCCURS, U.O.N.
3.PARTITIONS SHOWN ALIGNED WITH EXISTING BASE BUILDING ELEMENTS SHALL BE INSTALLED FLUSH AND SMOOTH
WITH BASE BUILDING ELEMENTS.
4.THE CONTRACTOR SHALL USE CORNER BEADS AT ALL EXPOSE CORNERS AND EXPOSED ENDS IN PLASTER AND
DRYWALL PARTITIONS.
5.ALL PARTITIONS SHALL BE ANCHORED PER MANUFACTURES' SPECIFICATIONS AND AS REQUIRED BY APPLICABLE
BUILDING CODES.
6.THE CONTRACTOR SHALL SUPPLY ALL RETURN AIR OPENINGS IN SLAB TO SLAB PARTITIONS ABOVE CEILINGS AS
REQUIRED BY ENGINEERING DRAWINGS. ALL OPENINGS IN DEMISING AND SOUND-ATTENUATED PARTITIONS SHALL
HAVE SOUND BOOTS AND ALL OPENINGS IN FIRE-RATED PARTITIONS SHALL HAVE FIRE DAMPERS AS REQUIRED BY
LOCAL BUILDINGS CODES. CONTRACTOR SHALL COORDINATE WITH ENGINEERING DRAWINGS AND INFORM MOSAIC OF
DISCREPANCIES PRIOR TO BIDDING.
7.THE CONTRACTOR SHALL PROVIDE SUFFICIENT FRAMING IN PARTITIONS FOR ALL DUCT WORK. RETURN AIR
OPENINGS AND GRILLS ABOVE AND BELOW CEILINGS SHALL BE COORDINATED WITH MECHANICAL ENGINEERING
DRAWINGS AND MECHANICAL CONTRACTOR'S SHOP DRAWINGS. ALL OPENINGS SHALL BE PROPERLY SEALED FOR
SOUNDPROOFING AND AGAINST VIBRATION.
8.THE CONTRACTOR SHALL PROVIDE AND INSTALL ACCESS PANELS AS REQUIRED FOR MECHANICAL, ELECTRICAL, AND
PLUMBING INSTALLATIONS PER APPLICABLE BUILDING CODES, CONTRACTOR SHALL COORDINATE TYPE AND
LOCATION OF ACCESS PANELS WITH MOSAIC PRIOR TO INSTALLATION.
9.MOSAIC SHALL HAVE THE RIGHT TO REVIEW AND APPROVE CHALK LINES PRIOR TO INSTALLATION OF TRACKS. MOSAIC
SHALL BE NOTIFIED OF ANY DEVIATION FROM DIMENSIONS OR CLEARANCES INDICATED ON PLANS REQUIRED DUE TO
FIELD CONDITIONS.
10. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL ALL PLUMBING ROUGH-INS, FIXTURES, AND
ACCESSORIES INDICATED IN THE DRAWINGS.
11.THE PLUMBING CONTRACTOR SHALL SUBMIT (3) CUTS OF ALL NEW FIXTURES, FITTINGS, AND ACCESSORIES TO
MOSAIC FOR REVIEW.
12.THE PLUMBING CONTRACTOR SHALL COORDINATE AND INSTALL HIS WORK IN ACCORDANCE WITH MANUFACTURERS'
SPECIFICATIONS.
13.THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL ALL VALVES AS INDICATED IN THE DRAWINGS AND/OR AS
REQUIRED FOR THE PROPER CONTROL OF THE PIPING AND APPARATUS INSTALLED AS PART OF THIS REPAIRED
WITHOUT INTERFERENCE OR INTERRUPTION OF SERVICE TO THE REMAINDER OF THE BUILDING.
14.BEFORE COVERED UP OR BUILT-IN, ALL PIPING SHALL BE TESTED AND INSPECTED AS REQUIRED BY THE AUTHORITIES
HAVING JURISDICTION.
15.SEE SHEET A6.0 AND A6.1 FOR ENLARGED RESTROOM PLANS AND NOTES.
16.PROVIDE NEW SEMI-RECESSED FIRE EXTINGUISHER CABINETS AND BOTTLES AS NOTED ON PLAN. SEE DETAIL, 5/A4.1
FOR SPECIFICATIONS AND NOTES.
17.THE CONTRACTOR SHALL PROVIDE 3 5/8' METAL STUDS AT PLUMBING WALLS.
FIRE DEPARTMENT NOTES
1.THE CONTRACTOR SHALL SUPPLY AND INSTALL A PORTABLE FIRE-EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A
OR 2-A10BC WITHIN 75'-0" TRAVEL DISTANCE TO ALL PORTIONS OF THE FLOOR, AND ANY ADDITIONAL FIRE
EXTINGUISHERS AS REQUIRED BY FIRE DEPARTMENT FIELD INSPECTOR. FIRE EXTINGUISHERS SHALL ALSO BE
PROVIDED DURING CONSTRUCTION.
2.ALL INTERIOR FINISHES SHALL CONFORM WITH CBC TITLE 24 2007.
3.DRAPES AND OTHER DECORATIVE MATERIALS SHALL BE FLAME RETARDANT. CERTIFICATION THEREOF SHALL BE
PROVIDED. EXITS, EXIT LIGHTS, FIRE ALARM STATIONS, HOSE CABINETS AND EXTINGUISHER LOCATIONS SHALL NOT BE
CONCEALED BY DECORATIVE MATERIAL. (CBC CHAPTER 8)
4.INTERIOR WALL AND CEILING FINISHES SHALL NOT EXCEED AN END POINT FLAME SPREAD OF 200 FOR ALL OFFICES.
5.INTERIOR WALL AND CEILING FINISHES FOR EXIT CORRIDORS AND STAIRWELLS SHALL NOT EXCEED A FLAME SPREAD
CLASSIFICATION OF 75 (CLASS 11).
6.ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE OR FLAME-RETARDANT TREATED IN AN APPROVED MANNER
(CURTAINS, DRAPES, SHADES, ETC).
7.EXIT SIGNS SHALL BE ELECTRICALLY ILLUMINATED AND THE TWO LAMPS SHALL BE ENERGIZED FROM SEPARATE
CIRCUITS. ILLUMINATION SHALL NORMALLY BE PROVIDED BY THE PREMISES WIRING SYSTEMS. IN THE EVENT OF THIS
SYSTEM'S FAILURE, ILLUMINATION SHALL BE AUTOMATICALLY PROVIDED FROM AN EMERGENCY SYSTEM. EMERGENCY
LIGHTING SHALL GIVE A VALUE OF ONE FOOTCANDLE AT FLOOR LEVEL (CBC CHAPTER 10).]
8.WHENEVER THE BUILDING IS OCCUPIED, EXIT SIGNS SHALL BE LIT SO THAT THEY ARE CLEARLY VISIBLE.
9.PROVIDE EXIT SIGNS WITH MINIMUM 6" HIGH BLOCK LETTERS WITH ¾" STROKE ON A CONTRASTING BACKGROUND.
INDICATE THE LOCATION OF EXIT SIGNS ON PLANS (CBC CHAPTER 10).
10.EXIT PATH LIGHTING SHALL BE PROVIDED AT STAIRWAY, HALLWAY, EXIT PASSAGEWAY, AND EGRESS TO A PUBLIC WAY
WHENEVER THE BUILDING IS OCCUPIED, PER CBC CHAPTER 10.
11.EMERGENCY LIGHTING SYSTEM IS REQUIRED AND MUST COMPLY WITH CBC CHAPTER 10.
12.ALL FIRE ALARM DEVICES SHALL BE LOCATED AS NOTED BELOW.
13.PROVIDED SMOKE DETECTION IN ALL CORRIDORS AND COMMON AREAS, INCLUDING STAIRWELLS SERVING TWO OR
MORE TENANTS (HEALTH AND SAFETY CODE 13113.7) ALTERATIONS TO THE FIRE AND LIFE SAFETY SYSTEM SHALL BE
UNDER SEPARATE PERMIT FROM THE FIRE PREVENTION SECTION PLANS. PERMIT APPLICATIONS AND FEES SHALL BE
SUBMITTED AND PERMIT APPROVAL SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY WORK ON THE FIRE AND
LIFE SAFETY SYSTEM.
14.KEY-LOCKING HARDWARE MAY BE USED ON THE MAIN EXIT WHEN THE MAIN EXIT CONSISTS OF A SINGLE DOOR OR PAIR
OF DOORS IF THERE IS A READILY VISIBLE, DURABLE SIGN ON OR ADJACENT TO THE DOOR STATING "THIS DOOR MUST
REMAIN UNLOCKED DURING BUSINESS HOURS".
15.EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY, TOOL, OR SPECIAL KNOWLEDGE OR
EFFORT. SPECIAL LOCKING DEVICES SHALL BE AN APPROVED TYPE (CBC CHAPTER 10).
16.EXIT DOORS SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN SERVING AN OCCUPANT LOAD OF 50 OR MORE, AND
IN ANY HAZARDOUS AREA OR GROUP "E" OCCUPANCY (CBC CHAPTER 10).
17.EXIT CORRIDORS, EXTERIOR EXIT BALCONIES, AND AISLES LEADING TO REQUIRED EXITS SHALL HAVE A MINIMUM WIDTH
OF 44" (CBC CHAPTER 10).
18.AN EXIT WALKWAY WITH A MINIMUM WIDTH OF 44" SHALL BE MAINTAINED CONTINUOUSLY TO A PUBLIC WAY (CBC
CHAPTER 10). EXIT PATHS OR WALKWAYS TO PUBLIC WAY SHALL BE CLEARLY DELINEATED BY PAINTED LINES, RAILINGS,
BARRIER POSTS, WALKS, OR OTHER APPROVED MEANS.
19.GLAZING INSTALLED IN ONE-HOUR CORRIDOR MUST BE ½" WIRED GLASS IN STEEL FRAMES AND SHALL NOT EXCEED 25%
OF CORRIDOR/ROOM COMMON WALL.
20.FIRE DAMPERS OR DOORS HALL BE PROVIDED WHERE HVAC DUCTS PENETRATE FIRE-RATED WALLS OR CEILINGS.
2
7 / 6 / 2025
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
DEMO PLAN
1/4"=1'-0"
PROVIDE LIGHT FLUSHED TO CEILING SURFACE
NOTE:
9-
2
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
1
(E) ALL GENDER
RESTROOM
51 SF.
34
"
C
L
E
A
R
18
"
PROVIDE UNIX SEX
SIGN, SEE DETAIL FIG.3
6"
17
"
-
1
8
"
3'
-
0
"
12"3'-6"
7'-1"
7'
-
4
"
5'
-
1
"
8"
ADA-1
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
HA
N
D
I
C
A
P
D
E
T
A
I
L
S
1
(EXISTING)
(EXISTING)
7 / 6 / 2025
SCALE: 1/2" = 1'-0"
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
9-
2
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
1
EXIT
TYPE-I
HOOD
1 2
21'-0"
A
B
C
TYP. POST PAD DETAIL 4 2
OUTDOOR UNIT PLATFORM ANCHORAGE DETAIL;
3
1
THE ROOF LOAD: DL= 16 psf LL = 20 psf
USE (E) 6EA.-2x12@12" SPAN=21' R.J. HANGER THIS HOOD
NOTE
NEW HOOD WEIGHT = 600 lbs
AND 2- SIMPSON 'DTC' 18 GAUGE FOR SEISMIC ANCHORAGE TO EXISTING WALL
(E) ONE-12" TJI 560 Span =14' CAPACITY LOAD = 212 plf, (See; ROOF LOAD TABLE)
EA. R.J. Add. Load= 600 /6= 100 plf (This Hood L= 9')
See; Calculation V-1 & V-2
MUA WEIGHT = 300 lbs
300 /3 =100 plf (This MUA L=2')
USE (E) 3EA.- 2x12@12" SPAN=21' R.J. SUPPORT MUA
EA. R.J. Add. Load=
HOOD
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
MU
A
/
H
O
O
D
L
A
Y
O
U
T
P
L
A
N
A
N
D
D
E
T
A
I
L
S
08 / 28 / 2 025
MUA & HOOD LAYOUT & ROOF FRAMING PLAN
SCALE: 1/4"=1'-0"
55
E
.
DU
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
10
0
6
CHAPTER 5
NONRESIDENTIAL MANDATORY MEASURES
SECTION 5.101 GENERAL
5.101.1 SCOPE
The provisions of this chapter outline planning, design and development methods that include environmentally
responsible site selection, building design, building siting and development to protect, restore and enhance the
environmental quality of the site and respect the integrity of adjacent properties.
DIVISION 5.1 PLANNING AND DESIGN
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE
NONRESIDENTIAL MANDATORY MEASURES, SHEET 1 (July 2024 Supplement)
Y
SECTION 5.102 DEFINITIONS
5.102.1 DEFINITIONS
The following terms are defined in Chapter 2 (and are included here for reference)
CUTOFF LUMINAIRES. Luminaires whose light distribution is such that the candela per 1000 lamp lumens does not
numerically exceed 25 (2.5 percent) at an angle of 90 degrees above nadir, and 100 (10 percent) at a vertical angle of
80 degrees above nadir. This applies to all lateral angles around the luminaire.
ELECTRIC VEHICLE (EV). [BSC-CG, HCD] An automotive-type vehicle for on-road use, such as passenger
automobiles, buses, trucks, vans, neighborhood electric vehicles, electric motorcycles and the like, primarily powered
by an electric motor that draws current from a rechargeable storage battery, fuel cell, photovoltaic array or other
source of electric current. Plug-in hybrid electric vehicles (PHEV) are considered electric vehicles. For purposes of the
California Electrical Code, off-road, self-propelled electric vehicles, such as industrial trucks, hoists, lifts, transports,
golf carts, airline ground support equipment, tractors, boats and the like, are not included.
ELECTRIC VEHICLE (EV) CAPABLE SPACE. [BSC-CG,
DSA-SS and HCD] A vehicle space with electrical panel space and load capacity to support a branch circuit and
necessary raceways, both underground and/or surface mounted, to support EV charging.
ELECTRIC VEHICLE (EV) CHARGER. [BSC-CG, HCD] Off-board charging equipment used to charge an electric
vehicle.
ELECTRIC VEHICLE CHARGING SPACE (EV SPACE). [HCD] A space intended for future installation of
EV charging equipment and charging of electric vehicles.
ELECTRIC VEHICLE CHARGING STATION (EVCS). [BSC-CG, DSA-SS, HCD] One or more electric vehicle
charging spaces served by EVSE or receptacle(s).
ELECTRIC VEHICLE (EV) READY SPACE. [HCD] A vehicle space which is provided with a branch circuit; any
necessary raceways, both underground and/or surface mounted; to accommodate EV charging, terminating in a
receptacle or a charger.
ELECTRIC VEHICLE SUPPLY EQUIPMENT (EVSE).[BSC-CG, DSA-SS and HCD] The conductors, including
the ungrounded, grounded and equipment grounding conductors and the electric vehicle connectors, attachment
plugs, personnel protection system, and all other fittings, devices, power outlets or apparatus installed specifically for
the purpose of transferring energy between the premises wiring and the electric vehicle.
SECTION 5.105 DECONSTRUCTION AND REUSE OF EXISTING STRUCTURES
5.105.1 Scope. [BSC-CG] Effective July 1, 2024, alteration(s) to existing building(s) where the combined altered
floor area is 100,000 square feet or greater shall comply with either Section 5.105.2, 5.409.2, or 5.409.3. Addition(s) to
existing building(s) where the total floor area combined with the existing building(s) is 100,000 square feet or greater
shall comply with either Section 5.105.2, Section 5.409.2, or Section 5.409.3. Effective January 1, 2026, the combined
floor area shall be 50,000 square feet or greater.
[DSA-SS] Alteration(s) to existing building(s) where the combined altered floor area is 50,000 square feet or greater
shall comply with either Section 5.105.2, 5.409.2, or 5.409.3. Addition(s) to existing building(s) where the total floor
area combined with the existing building(s) is 50,000 square feet or greater shall comply with either Section 5.105.2,
Section 5.409.2, or Section 5.409.3.
Exception [BSC-CG, DSA-SS]: Combined addition(s) to existing building(s) of two times the area or more of
the existing building(s) is not eligible to meet compliance with Section 5.105.2.
5.105.2 Reuse of existing building. An alteration or addition to an existing building shall maintain at a
minimum 45 percent combined of the existing building’s primary structural
elements (foundations; columns, beams, walls, and floors; and lateral elements) and existing building enclosure (roof
framing, wall framing and exterior finishes). Window assemblies, insulation, portions of buildings deemed structurally
unsound or hazardous, and hazardous materials that are remediated as part of the project shall not be included in the
calculation.
5.105.2.1 Verification of compliance. Documentation shall be provided in the construction documents to
demonstrate compliance with Section 5.105.2.
Note: Sample Worksheet WS-3 in Chapter 8 may be used to assist in documenting compliance with this
section.
5.105.3 Deconstruction (Reserved).
5.106.5.6 Electric vehicle (EV) charging at public schools and community colleges. [DSA-SS] Electric vehicle
infrastructure and electric vehicle charging stations shall comply with Section 5.106.5.6 and shall be provided in
accordance with regulations in the California Building Code and the California Electrical Code.
Exceptions:
1. On a case-by-case basis where compliance with this section has been demonstrated to be not feasible
based upon one of the following conditions,and with concurrence by the Division of the State Architect (DSA),
compliance with Section 5.106.5.6 shall not be required.
a. Where there is no local utility power supply.
b. Where the local utility is unable to supply adequate power.
c. The installation of EVCS is impracticable.
2. Parking spaces accessible only by automated mechanical car parking systems are not required to comply
with Section 5.106.5.6.
5.106.5.6.1 EV capable spaces. EV capable spaces shall be provided in accordance with Table 5.106.5.6.1
and the following requirements:
1. Raceways complying with the California Electrical Code and no less than 1-inch (25 mm) diameter shall be
provided and shall originate at a service panel or a subpanel(s) serving the area and shall terminate in close
proximity to the proposed location of the EV capable space and into a suitable listed cabinet, box, enclosure
or equivalent. A common raceway may be used to serve multiple EV capable spaces.
2. A service panel or subpanel(s) shall be provided with panel space and electrical load capacity for a
dedicated 208/240 volt, 40-ampere minimum branch circuit for each EV capable space, with delivery of
30-ampere minimum to an installed EVSE at each EVCS.
3. The electrical system and any on-site distribution transformers shall have sufficient capacity to supply
full rated amperage at each EV capable space.
4. The service panel or subpanel circuit directory shall identify the reserved overcurrent protective device
space(s) as “EV CAPABLE.” The raceway termination location shall be permanently and visibly marked as
“EV CAPABLE.”
1. Calculation for spaces shall be rounded up to the nearest whole number.
2. Each EVCS shall reduce the number of required EV capable spaces by the same number.
5.106.5.6.2 Electric vehicle charging stations (EVCS). EV capable spaces shall be provided with EVSE to
create EVCS in the number indicated in Table 5.106.5.6.1 and shall comply with Section 5.106.5.6.2.
EVCS shall be serviced by Level 2 or Direct Current Fast Charging (DCFC) EVSE, or with EVSE in any
combination of Level 2 and DCFC. Accessible EVCS shall be provided in accordance with California Building
Code Chapter 11B.
5.106.5.3 Electric vehicle (EV) charging. [N] [BSC-CG] Construction to provide electric vehicle infrastructure and
facilitate electric vehicle charging shall comply with Section 5.106.5.3.1 EV capable
spaces, Section 5.106.5.3.2 Electric vehicle charging stations and associated Table 5.106.5.3.1, or
Section 5.106.5.3.6 Electric vehicle charging stations (EVCS)—Power allocation method and associated
Table 5.106.5.3.6 and shall be provided in accordance with regulations in the California Building Code and the
California Electrical Code.
Exceptions:
1.On a case-by-case basis where the local enforcing agency has determined compliance with
this section is not feasible based upon one of the following conditions:
a.Where there is no local utility power supply
b.Where the local utility is unable to supply adequate power.
c.Where there is evidence suitable to the local enforcement agency substantiating the
local utility infrastructure design requirements, directly related to the implementation of
Section 5.106.5.3, may adversely impact the construction cost of the project.
2. Parking spaces accessible only by automated mechanical car parking systems are not
required to comply with this code section.
5.106.5.3.1 EV capable spaces. [N] EV capable spaces shall be provided in accordance with Table
5.106.5.3.1 and the following requirements:
1.Raceways complying with the California Electrical Code and no less that 1-inch (25 mm)
diameter shall be provided and shall originate at a service panel or a subpanel(s) serving
the area, and shall terminate in close proximity to the proposed location of the EV capable
and into a suitable listed cabinet, box,enclosure or equivalent. A common raceway may be
used to serve multiple EV charging spaces.
2.A service panel or subpanel (s) shall be provided with panel space and electrical load
capacity for a dedicated 208/240 volt, 40-ampere minimum branch circuit for each EV
capable space, with delivery of 30-ampere minimum to an installed EVSE at each EVCS.
3.The electrical system and any on-site distribution transformers shall have sufficient capacity
to supply full rated amperage at each EV capable space.
4.The service panel or subpanel circuit directory shall identify the reserved overcurrent
protective devices space(s) as "EV CAPABLE". The raceway termination location shall be
permanently and visibly marked as "EV CAPABLE."
Note: A parking space served by electric vehicle supply equipment or designed as a future EV
charging space shall count as at least one standard automobile parking space only for the purpose of
complying with any applicable minimum parking space requirements established by an enforcement
agency. See vehicle Code Section 22511.2 for further details.
ABBREVIATION DEFINITIONS:
HCD Department of Housing and Community Development
BSC California Building Standards Commission
DSA-SS Division of the State Architect, Structural Safety
OSHPD Office of Statewide Health Planning and Development
LR Low Rise
HR High Rise
AA Additions and Alterations
N New
5.106.4.1.2 Long-term bicycle parking. For new buildings with tenant spaces that have 10 or more
tenant-occupants, provide secure bicycle parking for 5 percent of the tenant-occupant vehicular parking
spaces with a minimum of one bicycle parking facility.
5.106.4.1.3 For additions or alterations that add 10 or more tenant-occupant vehicular parking spaces,
provide secure bicycle parking for 5 percent of the tenant vehicular parking spaces being added, with a
minimum of one bicycle parking facility.
5.106.4.1.4 For new shell buildings in phased projects provide secure bicycle parking for 5 percent of the
anticipated tenant-occupant vehicular parking spaces with a minimum of one bicycle parking facility.
5.106.4.1.5 Acceptable bicycle parking facility for Sections 5.106.4.1.2, 5.106.4.1.3, and 5.106.4.1.4 shall
be convenient from the street and shall meet one of the following:
1. Covered, lockable enclosures with permanently anchored racks for bicycles;
2. Lockable bicycle rooms with permanently anchored racks; or
3. Lockable, permanently anchored bicycle lockers.
Note: Additional information on recommended bicycle accommodations may be obtained from
Sacramento Area Bicycle Advocates.
5.106.4.2 Bicycle parking. [DSA-SS] For public schools and community colleges, comply with Sections
5.106.4.2.1 and 5.106.4.2.2
5.106.4.2.1 Student bicycle parking. Provide permanently anchored bicycle racks conveniently
accessed with a minimum of four two-bike capacity racks per new building.
5.106.4.2.2 Staff bicycle parking. Provide permanent, secure bicycle parking conveniently accessed
with a minimum of two staff bicycle parking spaces per new building. Acceptable bicycle parking facilities
shall be convenient from the street or staff parking area and shall meet one of the following:
1. Covered, lockable enclosures with permanently anchored racks for bicycles;
2. Lockable bicycle rooms with permanently anchored racks; or
3. Lockable, permanently anchored bicycle lockers.
5.106.4 BICYCLE PARKING. For buildings within the authority of California Building Standards Commission as
specified in Section 103, comply with Section 5.106.4.1. For buildings within the authority of the Division of the State
Architect pursuant to Section 105, comply with Section 5.106.4.2
5.106.4.1 Bicycle parking. [BSC-CG] Comply with Sections 5.106.4.1.1 and 5.106.4.1.2; or meet the
applicable local ordinance, whichever is stricter.
5.106.4.1.1 Short-term bicycle parking. If the new project or an addition or alteration is anticipated
to generate visitor traffic, provide permanently anchored bicycle racks within 200 feet of the visitors'
entrance, readily visible to passers-by, for 5% of new visitor motorized vehicle parking spaces being
added, with a minimum of one two-bike capacity rack.
Exception: Additions or alterations which add nine or less visitor vehicular parking spaces.
CHAPTER 3
GREEN BUILDING
SECTION 301 GENERAL
301.1 SCOPE. Buildings shall be designed to include the green building measures specified as mandatory in
the application checklists contained in this code. Voluntary green building measures are also included in the
application checklists and may be included in the design and construction of structures covered by this code,
but are not required unless adopted by a city, county, or city and county as specified in Section 101.7.
301.3 NONRESIDENTIAL ADDITIONS AND ALTERATIONS. [BSC-CG] The provisions
of individual sections of Chapter 5 apply to newly constructed buildings, building additions of 1,000 square
feet or greater, and/or building alterations with a permit valuation of $200,000 or above (for occupancies within
the authority of California Building Standards Commission). Code sections relevant to additions and
alterations shall only apply to the portions of the building being added or altered within the scope of the
permitted work.
A code section will be designated by a banner to indicate where the code section only applies to newly
constructed buildings [N] or to additions and/or alterations [A]. When the code section applies to both, no
banner will be used.
301.3.1 Nonresidential additions and alterations that cause updates to plumbing fixtures only:
Note: On and after January 1, 2014, certain commercial real property, as defined in Civil Code Section
1101.3, shall have its noncompliant plumbing fixtures replaced with appropriate water-conserving
plumbing fixtures under specific circumstances. See Civil Code Section 1101.1 et seq. for definitions,
types of commercial real property affected, effective dates, circumstances necessitating
replacement of noncompliant plumbing fixtures, and duties and responsibilities for
ensuring compliance.
301.3.2 Waste Diversion. The requirements of Section 5.408 shall be required for additions and
alterations whenever a permit is required for work.
301.4 PUBLIC SCHOOLS AND COMMUNITY COLLEGES. (see GBSC)
301.5 HEALTH FACILITIES. (see GBSC)
SECTION 302 MIXED OCCUPANCY BUILDINGS
302.1 MIXED OCCUPANCY BUILDINGS. In mixed occupancy buildings, each portion of a building
shall comply with the specific green building measures applicable to each specific occupancy.
SECTION 303 PHASED PROJECTS
303.1 PHASED PROJECTS. For shell buildings and others constructed for future tenant improvements,
only those code measures relevant to the building components and systems considered to be new
construction (or newly constructed) shall apply.
303.1.1 Initial Tenant improvements. The provisions of this code shall apply only to the initial tenant
improvements to a project. Subsequent tenant improvements shall comply with the scoping provisions in
Section 301.3 non-residential additions and alterations.
The installation of each DCFC EVSE shall be permitted to reduce the minimum number of required EV
capable spaces without EVSE by five and reduce proportionally the required electrical load capacity to the
service panel or subpanel.
5.106.5.3.2.1 The installation of each DCFC EVSE shall be permitted to reduce the minimum
number of required EV capable spaces without EVSE or EVCS with Level 2 EVSE by five and
reduce proportionally the required electrical load capacity to the service panel or subpanel.
5.106.5.3.2.2 The installation of two low power Level 2 EV charging receptacles shall be
permitted to reduce the minimum number of required EV capable spaces without EVSE in Table
5.106.5.3.1 by one.
5.106.5.3.3 Use of automatic load management systems (ALMS).
ALMS shall be permitted for EVCS. When ALMS is installed, the required electrical load capacity
specified in Section
5.106.5.3.1 for each EVCS may be reduced when serviced by an EVSE controlled by an ALMS. Each
EVSE controlled by an ALMS shall deliver a minimum 30 amperes to an EV when charging one vehicle
and shall deliver a minimum 3.3 kW while simultaneously charging multiple EVs.
5.106.5.3.4 Accessible EVCS.
When EVSE is installed, accessible EVSC shall be provided in accordance with the California Building
Code, Chapter 11B, Section 11B-228.3.
Note: For EVCS signs, refer to Caltrans Traffic Operations Policy Directive 13-01 (Zero Emission
Vehicle Signs and Pavement Markings) or its successor(s).
5.106.5.3.4 Accessible electric vehicle charging station (EVCS). When EVSE is installed, accessible
EVCS shall be provided in accordance with the California Building Code, Chapter 11B, Section 11B-228.3.
5.106.5.3.5 Electric vehicle charging station signage. Electric vehicle charging stations shall be identified
by signage or pavement markings in compliance with Caltrans Traffic Operations Policy Directive 13-01 (Zero
Emission Vehicle Signs and Pavement Markings) or its successor(s).
Power allocation method shall include the following:
1.Use any kVA combination of EV capable spaces, low power Level 2, Level 2 or DCFC EVSEs.
2.At least one Level 2 EVSE shall be provided.
(OHFWULFYHKLFOHFKDUJLQJVWDWLRQV(9&6²SRZHUDOORFDWLRQPHWKRGThe power allocation
method may be used as an alternative to the requirements in Section 5.106.5.3.1, Section 5.106.5.3.2 and
associated Table 5.106.5.3.1. Use Table 5.106.5.3.6 to determine the total power in kVA required based on the
total number of actual parking spaces.
TABLE 5.106.5.3.1
TOTAL NUMBER OF ACTUAL
PARKING SPACES
NUMBER OF REQUIRED EV
CAPABLE SPACES
NUMBER OF EVCS (EV
CAPABLE SPACES
PROVIDED WITH
EVSE)^2
0-9 0 0
10-25 2 0
26-50 8 2
51-75 13 3
76-100 17 4
101-150 25 6
151-200 35 9
201 AND OVER 20 percent of actual
parking spaces¹
25 percent of EV capable
spaces¹
DISCLAIMER:THIS DOCUMENT IS PROVIDED AND INTENDED TO BE USED AS A MEANS TO INDICATE AREAS OF COMPLIANCE WITH THE CALIFORNIA GREEN BUILDING STANDARDS (CALGREEN) CODE. DUE TO THE VARIABLES BETWEEN BUILDING DEPARTMENT JURISDICTIONS, THIS CHECKLIST IS TO BE USED ON AN INDIVIDUAL PROJECT BASIS AND MAY BE MODIFIED BY THE END USER TO MEET THOSE INDIVIDUAL NEEDS. THE END USER ASSUMES ALL RESPONSIBILITY ASSOCIATED WITH THE USE OF THIS DOCUMENT, INCLUDING VERIFICATION WITH THE FULL CODE.
5.106.2 STORMWATER POLLUTION PREVENTION FOR PROJECTS THAT DISTURB ONE OR MORE ACRES OF
LAND. Comply with all lawfully enacted stormwater discharge regulations for projects that (1) disturb one acre or
more of land, or (2) disturb less than one acre of land but are part of a larger common plan of development sale.
Note: Projects that (1) disturb one acre or more of land, or (2) disturb less than one acre of land but are part of the
larger common plan of development or sale must comply with the post-construction requirements detailed in the
applicable National Pollutant Discharge Elimination System (NPDES) General permit for Stormwater Discharges
Associated with Construction and Land Disturbance Activities issued by the State Water Resources Control Board or
the Lahontan Regional Water Quality Control Board (for projects in the Lake Tahoe Hydrologic Unit).
The NPDES permits require postconstruction runoff (post-project hydrology) to match the preconstruction runoff
(pre-project hydrology) with the installation of postconstruction stormwater management measures. The NPDES
permits emphasize runoff reduction through on-site stormwater use, interception, evapotranspiration, and infiltration
through nonstructural controls, such as Low Impact Development (LID) practices, and conversation design measures.
Stormwater volume that cannot be addressed using nonstructural practices is required to be captured in structural
practices and be approved by the enforcing agency.
Refer to the current applicable permits on the State Water Resources Control Board website at:
www.waterboards.ca.gov/constructionstormwater. Consideration to the stormwater runoff management measures
should be given during the initial design process for appropriate integration into site development.
N/A Y N/A
1. Calculation for spaces shall be rounded up to the nearest whole number.
2. The number of required EVCS (EV capable spaces provided with EVSE) in column 3 count toward the
total number of required EV capable spaces shown in column 2.
3. At least one Level 2 EVSE shall be provided.
Y N/A Y N/A
Y = YES
N/A =NOT APPLICABLE
RESPON. PARTY =RESPONSIBLE PARTY (ie: ARCHITECT, ENGINEER,
OWNER, CONTRACTOR, INSPECTOR ETC.)
RESPON.
PARTY
RESPON.
PARTY
RESPON.
PARTY
RESPON.
PARTY
5.106.5.5 Electric vehicle (EV) charging: medium-duty and heavy-duty. [N] [BSG-CG] Construction shall comply
with Section 5.106.5.5.1 to facilitate future installation of electric vehicle supply equipment (EVSE). Construction for
warehouses, grocery stores and retail stores, office buildings, and manufacturing facilities with planned off-street
loading spaces shall also comply with Section 5.106.5.5.1 for future installation of medium- and heavy-duty EVSE.
Exceptions:
1. On a case-by-case basis where the local enforcing agency has determined compliance with this section
is not feasible based upon one of the following conditions:
a. Where there is no local utility power supply.
b. Where the local utility is unable to supply adequate power.
c. Where there is evidence suitable to the local enforcing agency substantiating that additional
local utility infrastructure design requirements, directly related to the implementation
of Section 5.106.5.3, may adversely impact the construction cost of the project.
When EVSE(s) is/are installed, it shall be in accordance with the California Building Code, the California Electrical
Code and as follows:
5.106.5.5.1 Electric vehicle charging readiness requirements for warehouses, grocery stores, office
buildings, and manufacturing facilities and retail stores with planned off-street loading spaces. [N]
In order to avoid future demolition when adding EV supply and distribution equipment, spare raceway(s) or
busway(s) and adequate capacity for transformer(s), service panel(s) or subpanel(s) shall be installed at the
time of construction in accordance with the California Electrical Code. Construction plans and specifications
shall include, but are not limited to, the following:
1. The transformer, main service equipment and subpanels shall meet the minimum power requirement
in Table 5.106.5.5.1 to accommodate the dedicated branch circuits for the future installation of EVSE.
2. The construction documents shall indicate one or more location(s) convenient to the planned
off-street loading space(s) reserved for medium- and heavy-duty ZEV charging cabinets and charging
dispensers, and a pathway reserved for routing of conduit from the termination of the raceway(s) or
busway(s) to the charging cabinet(s) and dispenser(s), as shown in Table 5.106.5.5.1.
3. Raceway(s) or busway(s) originating at a main service panel or a subpanel(s) serving the area where
potential future medium- and heavy-duty EVSE will be located and shall terminate in close proximity
to the potential future location of the charging equipment for medium- and heavy-duty vehicles.
4. The raceway(s) or busway(s) shall be of sufficient size to carry the minimum additional system
load to the future location of the charging for medium- and heavy-duty ZEVs as shown in Table
5.106.5.5.1.
TABLE 5.106.5.3.6
TOTAL NUMBER OF ACTUAL
PARKING SPACES
MINIMUM
TOTAL kVA @
6.6 kVA
TOTAL kVA REQUIRED IN ANY
COMBINATION OF EV CAPABLE,3,4
LOW POWER LEVEL 2, LEVEL 2, 1, 2
OR DCFC
0-9 0 0
10-25 26.4 26.4
26-50 52.8 52.8
51-75 85.8 85.8
76-100 112.2 112.2
101-150 165 165
151-200 231 231
201 AND OVER
20 percent of actual
parking spaces x
6.6
Total required kVA = P × .20 × 6.6
Where P = Parking spaces in facility
1. Level 2 EVSE @ 6.6 kVA minimum.
2. At least one Level 2 EVSE shall be provided.
3. Maximum allowed kVA to be utilized for EV capable spaces is 75 percent.
4. If EV capable spaces are utilized, they shall meet the requirements of Section 5.106.5.3.1 EV capable
spaces.
5.106.5.4 Additions or alterations to existing buildings or parking facilities [A]. [BSC-CG] Existing buildings
or parking facilities being modified by one of the following shall comply with Section 5.106.5.4.1 or 5.106.5.4.2.
When EVSE is installed, accessible EVCS shall be provided in accordance with the California Building Code,
Chapter 11B, Section 11B-228.3.
1. When the scope of construction work includes an increase in power supply to an electric service panel as
part of a parking facility addition or alteration.
2. When a new photovoltaic system is installed covering existing parking spaces.
3. When additions or alterations to existing buildings are triggered pursuant to code Section 301.3 and the
scope of work includes an increase in power supply to an electric service panel.
Exceptions:
1. On a case-by-case basis where the local enforcing agency has determined compliance with this section is
not feasible based upon one of the following conditions:
a. Where there is no local utility power supply.
b. Where the local utility is unable to supply adequate power.
c. Where there is evidence suitable to the local enforcement agency substantiating that additional
local utility infrastructure design requirements, directly related to the implementation of Section
5.106.5.3, may adversely impact the construction cost of the project.
d. Where demonstrated as impracticable excluding local utility service or utility infrastructure issues.
2. Remote parking facilities that do not have access to the building service panel.
3. Parking area lighting upgrades where no trenching is part of the scope of work.
4. Emergency repairs, including but not limited to water line break in parking facilities, natural disaster
repairs, etc.
5.106.5.4.1 Existing buildings or parking areas without previously installed EV capable infrastructure
[A]. When EV capable infrastructure does not exist at an existing parking facility or building, and the parking
facility or building undergoes an addition or alteration listed in Section 5.106.5.4, construction shall include
electric vehicle charging in compliance with either Section 5.106.5.3 and associated Table 5.106.5.3.1, or
Section 5.106.5.3.6 and associated Table 5.106.5.3.6 for the total number of actual parking spaces being
added or altered.
5.106.5.4.2 Existing buildings or parking areas with previously installed EV capable infrastructure
[A]. When EV capable infrastructure is available at an existing parking facility or building, and the parking
facility or building is undergoing an addition or alteration listed in Section 5.106.5.4, construction shall
include electric vehicle charging in compliance with either Section 5.106.5.3 and associated Table
5.106.5.3.1, or Section 5.106.5.3.6 and associated Table 5.106.5.3.6 utilizing the existing EV capable
allocated power and infrastructure for the total number of actual parking spaces being added or altered. If
the area being added or altered exceeds the existing EV capable capacity, allocated power and
infrastructure, provide additional EV charging as needed to comply with this section.
TABLE 5.106.5.5.1 RACEWAY CONDUIT AND PANEL POWER
REQUIREMENTS FOR MEDIUM- AND HEAVY-DUTY EVSE [N]
BUILDING TYPE BUILDING SIZE (SQ. FT.)
NUMBER OF
OFF-STREET
LOADING SPACES
ADDITIONAL
CAPACITY
REQUIRED (KVA)
FOR RACEWAY &
BUSWAY AND
TRANSFORMER &
PANEL
Grocery 10,000 to 90,000 1 or 2 200
3 or Greater 400
Greater than 90,000 1 or Greater 400
Manufacturing Facilities
10,000 to 50,000 1 or 2 200
10,000 to 50,000 3 or Greater 400
Greater than 50,000 1 or Greater 400
Office Buildings
10,000 to 135,000 1 or 2 200
10,000 to 135,000 3 or Greater 400
Greater than 135,000 1 or Greater 400
Retail
10,000 to 135,000
1 or 2 200
3 or Greater 400
Greater than 135,000 1 or Greater 400
Warehouse
20,000 to 256,000
1 or 2 200
3 or Greater 400
Greater than 256,000 1 or Greater 400
TABLE 5.106.5.6.1
TOTAL NUMBER OF ACTUAL
PARKING SPACES
NUMBER OF REQUIRED EV
CAPABLE SPACES
NUMBER OF
REQUIRED EVCS2
0-9 0 0
10-25 4 1
26-50 8 2
51-75 13 3
76-100 17 4
101-150 25 6
151-200 35 9
201 AND OVER 20 percent of total spaces¹25 percent of EV capable
spaces¹
5.106.5.3.2 Electric vehicle charging stations (EVCS) EV capable spaces shall be provided with electric
vehicle supply equipment (EVSE) to create EVCS in the number indicated in Table 5.106.5.3.1. The EVCS
required by Table 5.106.5.3.1 shall be provided with Level 2 EVSE or DCFC as permitted in Section
5.106.5.3.2.1. At least one Level 2 EVSE shall be provided.
One EV charger with multiple connectors capable of charging multiple EVs simultaneously shall be permitted if
the electrical load capacity required by Section 5.106.5.3.1 for each EV capable space is accumulatively
supplied to the EV charger.
SECTION 5.106 SITE DEVELOPMENT
5.106.1 STORM WATER POLLUTION PREVENTION FOR PROJECTS THAT DISTURB LESS THAN ONE ACRE
OF LAND. Newly constructed projects and additions which disturb less than one acre of land, and are not part of a
larger common plan of development or sale, shall prevent the pollution of storm water runoff from the construction
activities through one or more of the following measures:
5.106.1.1 Local ordinance. Comply with a lawfully enacted storm water management and/or erosion control
ordinance.
5.106.1.2 Best Management Practices (BMPs). Prevent the loss of soil through wind or water erosion by
implementing an effective combination of erosion and sediment control and good housekeeping BMPs.
1. Soil loss BMPs that should be considered for implementation as appropriate for each project include,
but are not limited to, the following:
a. Scheduling construction activity during dry weather, when possible.
b. Preservation of natural features, vegetation, soil, and buffers around surface waters.
c. Drainage swales or lined ditches to control stormwater flow.
d. Mulching or hydroseeding to stabilize disturbed soils.
e. Erosion control to protect slopes.
f. Protection of storm drain inlets (gravel bags or catch basin inserts).
g. Perimeter sediment control (perimeter silt fence, fiber rolls).
h. Sediment trap or sediment basin to retain sediment on site.
i. Stabilized construction exits.
j. Wind erosion control.
k. Other soil loss BMPs acceptable to the enforcing agency.
2. Good housekeeping BMPs to manage construction equipment, materials, non-stormwater discharges
and wastes that should be considered for implementation as appropriate for each project include, but
are not limited to, the following:
a. Dewatering activities.
b. Material handling and waste management.
c. Building materials stockpile management.
d. Management of washout areas (concrete, paints, stucco, etc.).
e. Control of vehicle/equipment fueling to contractor's staging area.
f. Vehicle and equipment cleaning performed off site.
g Spill prevention and control.
h. Other housekeeping BMPs acceptable to the enforcing agency.
N/A
Y
Y
Y
Y
Y
N/A
N/A
N/A
GR-1
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
GR
E
E
N
C
O
D
E
-
7 / 6 / 2025
1
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
DIVISION 5.4 MATERIAL CONSERVATION AND RESOURCE
EFFICIENCY
SECTION 5.401 GENERAL
5.401.1 SCOPE. The provisions of this chapter specify the requirements of achieving material conservation, resource
efficiency, and greenhouse gas (GHG) emission reduction through protection of buildings from exterior moisture,
construction waste diversion, employment of techniques to reduce pollution through recycling of materials, the
installation of products with lower GHG emissions and building commissioning or testing and adjusting.
SECTION 5.408 CONSTRUCTION WASTE REDUCTION, DISPOSAL AND
RECYCLING
5.408.1 CONSTRUCTION WASTE MANAGEMENT. Recycle and/or salvage for reuse a minimum of 65% of the
non-hazardous construction and demolition waste in accordance with Section 5.408.1.1, 5.408.1.2 or 5.408.1.3; or
meet a local construction and demolition waste management ordinance, whichever is more stringent.
5.408.1.1 Construction waste management plan. Where a local jurisdiction does not have a construction and
demolition waste management ordinance, submit a construction waste management plan that:
1. Identifies the construction and demolition waste materials to be diverted from disposal by efficient
usage, recycling, reuse on the project or salvage for future use or sale.
2. Determines if construction and demolition waste materials will be sorted on-site (source-separated) or
bulk mixed (single stream).
3. Identifies diversion facilities where construction and demolition waste material collected will be taken.
4. Specifies that the amount of construction and demolition waste materials diverted shall be calculated
byweight or volume, but not by both.
5.408.1.2 Waste Management Company. Utilize a waste management company that can provide verifiable
documentation that the percentage of construction and demolition waste material diverted from the landfill
complies with this section.
Note: The owner or contractor shall make the determination if the construction and demolition waste material
will be diverted by a waste management company.
Exceptions to Sections 5.408.1.1 and 5.408.1.2:
1. Excavated soil and land-clearing debris.
2. Alternate waste reduction methods developed by working with local agencies if diversion or recycle
facilities capable of compliance with this item do not exist.
3. Demolition waste meeting local ordinance or calculated in consideration of local recycling facilities
and markets.
5.408.1.3 Waste stream reduction alternative. The combined weight of new construction disposal that does
not exceed two pounds per square foot of building area may be deemed to meet the 65% minimum requirement
as approved by the enforcing agency.
5.408.1.4 Documentation. Documentation shall be provided to the enforcing agency which demonstrates
compliance with Sections 5.408.1.1, through 5.408.1.3. The waste management plan shall be updated as
necessary and shall be accessible during construction for examination by the enforcing agency.
Notes:
1. Sample forms found in "A Guide to the California Green Building Standards Code (Nonresidential)"
located www.dgs.ca.gov/BSC/Resources/Page-Content/Building-Standards-Commission-
Resources-List-Folder/CALGreen may be used to assist in documenting compliance with the waste
management plan.
2. Mixed construction and demolition debris processors can be located at the California Department of
Resources Recycling and Recovery (CalRecycle).
5.408.2 UNIVERSAL WASTE. [A] Additions and alterations to a building or tenant space that meet the scoping
provisions in Section 301.3 for nonresidential additions and alterations, shall require verification that Universal Waste
items such as fluorescent lamps and ballast and mercury containing thermostats as well as other California prohibited
Universal Waste materials are disposed of properly and are diverted from landfills. A list of prohibited Universal Waste
materials shall be included in the construction documents.
Note: Refer to the Universal Waste Rule link at: http://www.dtsc.ca.gov/universalwaste/
5.408.3 EXCAVATED SOIL AND LAND CLEARING DEBRIS. 100 percent of trees, stumps, rocks and associated
vegetation and soils resulting primarily from land clearing shall be reused or recycled. For a phased project, such
material may be stockpiled on site until the storage site is developed.
Exception: Reuse, either on or off-site, of vegetation or soil contaminated by disease or pest infestation.
Notes:
1. If contamination by disease or pest infestation is suspected, contact the County Agricultural
Commissioner and follow its direction for recycling or disposal of the material.
2. For a map of know pest and/or disease quarantine zones, consult with the California Department of
Food and Agriculture. (www.cdfa.ca.gov)
SECTION 5.303 INDOOR WATER USE
5.303.1 METERS. Separate submeters or metering devices shall be installed for the uses described in Sections
503.1.1 and 503.1.2.
5.303.1.1 Buildings in excess of 50,000 square feet. Separate submeters shall be installed as follows:
1. For each individual leased, rented or other tenant space within the building projected to consume
more than 100 gal/day (380 L/day), including, but not limited to, spaces used for laundry or cleaners,
restaurant or food service, medical or dental office, laboratory, or beauty salon or barber shop.
2. Where separate submeters for individual building tenants are unfeasible, for water supplied to the
following subsystems:
a. Makeup water for cooling towers where flow through is greater than 500 gpm (30 L/s).
b. Makeup water for evaporative coolers greater than 6 gpm (0.04 L/s).
c. Steam and hot water boilers with energy input more than 500,000 Btu/h (147 kW).
5.303.1.2 Excess consumption. A separate submeter or metering device shall be provided for any tenant
within a new building or within an addition that is projected to consume more than 1,000 gal/day.
SECTION 5.304 OUTDOOR WATER USE
5.304.1 OUTDOOR POTABLE WATER USE IN LANDSCAPE AREAS. Nonresidential developments shall comply
with a local water efficient landscape ordinance or the current California Department of Water Resources' Model Water
Efficient Landscape Ordinance (MWELO), whichever is more stringent.
Notes:
1. The Model Water Efficient Landscape Ordinance (MWELO) is located in the California Code of Regulations,
Title 23, Chapter 2.7, Division 2.
2. MWELO and supporting documents, including a water budget calculator, are available at:
https://www.water.ca.gov/.
5.304.6 OUTDOOR POTABLE WATER USE IN LANDSCAPE AREAS. For public schools and community colleges,
landscape projects as described in Sections 5.304.6.1 and 5.304.6.2 shall comply with the California Department of
Water Resources Model Water Efficient Landscape Ordinance (MWELO) commencing with Section 490 of Chapter
2.7, Division 2, Title 23, California Code of Regulations, except that the evapotranspiration adjustment factor (ETAF)
shall be 0.65 with an additional water allowance for special landscape areas (SLA) of 0.35.
Exception: Any project with an aggregate landscape area of 2,500 square feet or less may comply with the
prescriptive measures contained in Appendix D of the MWELO.
5.304.6.1 Newly constructed landscapes. New construction projects with an aggregate landscape
area equal to or greater than 500 square feet.
5.304.6.2 Rehabilitated landscapes. Rehabilitated landscape projects with an aggregate
landscape area equal to or greater than 1,200 square feet.
5.303.4 COMMERCIAL KITCHEN EQUIPMENT.
5.303.4.1 Food Waste Disposers. Disposers shall either modulate the use of water to no more than 1 gpm
when the disposer is not in use (not actively grinding food waste/no-load) or shall automatically shut off after no
more than 10 minutes of inactivity. Disposers shall use no more than 8 gpm of water.
Note: This code section does not affect local jurisdiction authority to prohibit or require disposer
installation.
5.303.5 AREAS OF ADDITION OR ALTERATION. For those occupancies within the authority of the California
Building Standards Commission as specified in Section 103, the provisions of Section 5.303.3 and 5.303.4 shall apply
to new fixtures in additions or areas of alteration to the building.
5.303.6 STANDARDS FOR PLUMBING FIXTURES AND FITTINGS. Plumbing fixtures and fittings shall be installed
in accordance with the California Plumbing Code, and shall meet the applicable standards referenced in Table 1701.1
of the California Plumbing Code and in Chapter 6 of this code.
SECTION 5.402 DEFINITIONS
5.402.1 DEFINITIONS. The following terms are defined in Chapter 2 (and are included here for reference)
ADJUST. To regulate fluid flow rate and air patterns at the terminal equipment, such as to reduce fan speed or adjust
a damper.
SECTION 5.407 WATER RESISTANCE AND MOISTURE MANAGEMENT
5.407.1 WEATHER PROTECTION. Provide a weather-resistant exterior wall and foundation envelope as required by
California Building Code Section 1402.2 (Weather Protection), manufacturer's installation instructions or local
ordinance, whichever is more stringent.
5.407.2 MOISTURE CONTROL. Employ moisture control measures by the following methods.
5.407.2.1 Sprinklers. Design and maintain landscape irrigation systems to prevent spray on structures.
5.407.2.2 Entries and openings. Design exterior entries and/or openings subject to foot traffic or wind-driven
rain to prevent water intrusion into buildings as follows:
5.407.2.2.1 Exterior door protection. Primary exterior entries shall be covered to prevent water
intrusion by using nonabsorbent floor and wall finishes within at least 2 feet around and perpendicular to
such openings plus at least one of the following:
1. An installed awning at least 4 feet in depth.
2. The door is protected by a roof overhang at least 4 feet in depth.
3. The door is recessed at least 4 feet.
4. Other methods which provide equivalent protection.
5.407.2.2.2 Flashing. Install flashings integrated with a drainage plane.
5.303.3.3 Showerheads. [BSC-CG]
5.303.3.3.1 Single showerhead. Showerheads shall have a maximum flow rate of not more than 1.8
gallons per minute at 80 psi. Showerheads shall be certified to the performance criteria of the U.S. EPA
WaterSense Specification for Showerheads.
5.303.3.3.2 Multiple showerheads serving one shower. When a shower is served by more than one
showerhead, the combined flow rate of all the showerheads and/or other shower outlets controlled by a
single valve shall not exceed 1.8 gallons per minute at 80 psi, or the shower shall be designed to
allow only one shower outlet to be in operation at a time.
Note: A hand-held shower shall be considered a showerhead.
5.303.3.4 Faucets and fountains.
5.303.3.4.1 Nonresidential Lavatory faucets. Lavatory faucets shall have a maximum flow rate of not
more than 0.5 gallons per minute at 60 psi.
5.303.3.4.2 Kitchen faucets. Kitchen faucets shall have a maximum flow rate of not more than 1.8
gallons per minute at 60 psi. Kitchen faucets may temporarily increase the flow above the maximum rate,
but not to exceed 2.2 gallons per minute at 60 psi, and must default to a maximum flow rate of 1.8 gallons
per minute at 60 psi.
5.303.3.4.3 Wash fountains. Wash fountains shall have a maximum flow rate of not more than1.8
gallons per minute/20 [rim space (inches) at 60 psi].
5.303.3.4.4 Metering faucets. Metering faucets shall not deliver more than 0.20 gallons per cycle.
5.303.3.4.5 Metering faucets for wash fountains. Metering faucets for wash fountains shall have a
maximum flow rate of not more than 0.20 gallons per minute/20 [rim space (inches) at 60 psi].
Note: Where complying faucets are unavailable, aerators or other means may be used to achieve
reduction.
5.303.3.4.6 Pre-rinse spray value
When installed, shall meet the requirements in the California Code of Regulations, Title 20 (Appliance
Efficiency Regulations), Section 1605.1 (h)(4) Table H-2, Section 1605.3 (h)(4)(A), and Section 1607
(d)(7), and shall be equipped with an integral automatic shutoff.
FOR REFERENCE ONLY:The following table and code section have been reprinted from the California
Code of Regulations, Title 20 (Appliance Efficiency Regulations), Section 1605.1 (h)(4) and Section
1605.3 (h)(4)(A).
TABLE H-2
STANDARDS FOR COMMERCIAL PRE-RINSE SPRAY
VALUES MANUFACTURED ON OR AFTER JANUARY 28, 2019
PRODUCT CLASS
[spray force in ounce force (ozf)]MAXIMUM FLOW RATE (gpm)
Product Class 1 (≤1.00
Product Class 2 (> 5.0 ozf and ≤1.20
Product Class 3 (> 8.0 ozf)1.28
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE
NONRESIDENTIAL MANDATORY MEASURES, SHEET 2 (July 2024 Supplement)
Y
DIVISION 5.2 ENERGY EFFICIENCY
SECTION 5.201 GENERAL
5.201.1 Scope [BSC-CG]. California Energy Code [DSA-SS]. For the purposes of mandatory energy efficiency
standards in this code, the California Energy Commission will continue to adopt mandatory building standards.
DIVISION 5.3 WATER EFFICIENCY AND CONSERVATION
SECTION 5.301 GENERAL
5.301.1 Scope. The provisions of this chapter shall establish the means of conserving water use indoors, outdoors
and in wastewater conveyance.
SECTION 5.302 DEFINITIONS
5.302.1 Definitions. The following terms are defined in Chapter 2 (and are included here for reference)
EVAPOTRANSPIRATION ADJUSTMENT FACTOR (ETAF) [DSA-SS]. An adjustment factor when applied to
reference evapotranspiration that adjusts for plant factors and irrigation efficiency, which ae two major influences on
the amount of water that needs to be applied to the landscape.
FOOTPRINT AREA [DSA-SS]. The total area of the furthest exterior wall of the structure projected to natural grade,
not including exterior areas such as stairs, covered walkways, patios and decks.
METERING FAUCET. A self-closing faucet that dispenses a specific volume of water for each actuation cycle. The
volume or cycle duration can be fixed or adjustable.
GRAYWATER. Pursuant to Health and Safety Code Section 17922.12, "graywater" means untreated wastewater that
has not been contaminated by any toilet discharge, has not been affected by infectious, contaminated, or unhealthy
bodily wastes, and does not present a threat from contamination by unhealthful processing, manufacturing, or
operating wastes. "Graywater" includes, but is not limited to wastewater from bathtubs, showers, bathroom
washbasins, clothes washing machines and laundry tubs, but does not include waste water from kitchen sinks or
dishwashers.
MODEL WATER EFFICIENT LANDSCAPE ORDINANCE (MWELO). The California ordinance regulating landscape
design, installation and maintenance practices that will ensure commercial, multifamily and other developer installed
landscapes greater than 2500 square feet meet an irrigation water budget developed based on landscaped area and
climatological parameters.
MODEL WATER EFFICIENT LANDSCAPE ORDINANCE (MWELO). [HCD] The California model ordinance
(California Code of Regulations, Title 23, Division 2, Chapter 2.7), regulating landscape design, installation and
maintenance practices. Local agencies are required to adopt the updated MWELO, or adopt a local ordinance at least
as effective as the MWELO.
POTABLE WATER. Water that is drinkable and meets the U.S. Environmental Protection Agency (EPA) Drinking
Water Standards. See definition in the California Plumbing Code, Part 5.
POTABLE WATER. [HCD] Water that is satisfactory for drinking, culinary, and domestic purposes, and meets the
U.S. Environmental Protection Agency (EPA) Drinking Water Standards and the requirements of the Health Authority
Having Jurisdiction.
RECYCLED WATER. Water which, as a result of treatment of waste, is suitable for a direct beneficial use or a
controlled use that would not otherwise occur [Water Code Section 13050 (n)]. Simply put, recycled water is water
treated to remove waste matter attaining a quality that is suitable to use the water again.
SUBMETER. [HCD 1] A secondary device beyond a meter that measures water consumption of an individual rental
unit within a multiunit residential structure or mixed-use residential and commercial structure. (See Civic Code Section
1954.202 (g) and Water code Section 517 for additional details.)
WATER BUDGET. Is the estimated total landscape irrigation water use which shall not exceed the maximum applied
water allowance calculated in accordance with the Department of Water Resources Model Efficient Landscape
Ordinance (MWELO).
5.106.5.6.5 Requirement to install EVSE. Level 2 EVSE shall be provided in all existing EV capable spaces to
create EVCS when a project is required by California Administrative Code Section 4-309 to be submitted for plan
approval to the Division of the State Architect. When EVSE is installed in existing EV capable spaces, accessible
EVCS shall be provided in accordance with California Building Code Chapter 11B.
Exception: Projects in which improvements in parking areas consist only of accessibility improvements are
not required to comply with Section 5.106.5.6.5.
5.106.8 LIGHT POLLUTION REDUCTION. [N]. l Outdoor lighting systems shall be designed and installed to comply
with the following:
1.The minimum requirements in the California Energy Code for Lighting Zones 0-4 as defined in Chapter 10,
Section 10-114 of the California Administrative Code; and
2.Backlight (B) ratings as defined in IES TM-15-11 (shown in Table A-1 in Chapter 8);
3.Uplight and Glare ratings as defined in California Energy Code (shown in Tables 130.2-A and 130.2-B in
Chapter 8) and
4.Allowable BUG ratings not exceeding those shown in Table 5.106.8, [N] or Comply with a local ordinance
lawfully enacted pursuant to Section 101.7, whichever is more stringent.
Exceptions: [N]
1. Luminaires that qualify as exceptions in Sections 130.2 (b) and 140.7 of the California Energy Code.
2. Emergency lighting.
3. Building facade meeting the requirements in Table 140.7-B of the California Energy Code, Part 6.
4. Custom lighting features as allowed by the local enforcing agency, as permitted by Section 101.8
Alternate materials, designs and methods of construction.
5. Luminaires with less than 6,200 initial luminaire lumens.
TABLE 5.106.8 [N] MAXIMUM ALLOWABLE BACKLIGHT,
UPLIGHT AND GLARE (BUG) RATINGS 1,2
ALLOWABLE RATING
LIGHTING
ZONE
LZ0
LIGHTING
ZONE LZ1
LIGHTING
ZONE LZ2
LIGHTING
ZONE LZ3
LIGHTING
ZONE LZ4
MAXIMUM ALLOWABLE
BACKLIGHT RATING 3
Luminaire greater than 2
mounting heights (MH) from
property line
N/A No Limit No Limit No Limit No Limit
Luminaire back hemisphere is
1-2 MH from property line N/A B2 B3 B4 B4
Luminaire back hemisphere is
0.5-1 MH from property line N/A B1 B2 B3 B3
Luminaire back hemisphere is
less than 0.5 MH from property
line
N/A B0 B0 B1 B2
MAXIMUM ALLOWABLE
UPLIGHT RATING (U)
For area lighting 3 N/A U0 U0 U0 U0
For all other outdoor
lighting,including decorative
luminaires
N/A U1 U2 U3 UR
DISCLAIMER:THIS DOCUMENT IS PROVIDED AND INTENDED TO BE USED AS A MEANS TO INDICATE AREAS OF COMPLIANCE WITH THE CALIFORNIA GREEN BUILDING STANDARDS (CALGREEN) CODE. DUE TO THE VARIABLES BETWEEN BUILDING DEPARTMENT JURISDICTIONS, THIS CHECKLIST IS TO BE USED ON AN INDIVIDUAL PROJECT BASIS AND MAY BE MODIFIED BY THE END USER TO MEET THOSE INDIVIDUAL NEEDS. THE END USER ASSUMES ALL RESPONSIBILITY ASSOCIATED WITH THE USE OF THIS DOCUMENT, INCLUDING VERIFICATION WITH THE FULL CODE.
N/A Y N/A Y N/A Y N/A
Y = YES
N/A =NOT APPLICABLE
RESPON. PARTY =RESPONSIBLE PARTY (ie: ARCHITECT, ENGINEER,
OWNER, CONTRACTOR, INSPECTOR ETC.)
RESPON.
PARTY
RESPON.
PARTY
RESPON.
PARTY
RESPON.
PARTY
MAXIMUM ALLOWABLE
GLARE RATING 5 (G)
MAXIMUM ALLOWABLE
GLARE RATING 5 (G)N/A G1 G2 G3 G4
MAXIMUM ALLOWABLE
GLARE RATING 5 (G)N/A G0 G1 G1 G2
MAXIMUM ALLOWABLE
GLARE RATING 5 (G)N/A G0 G0 G1 G1
MAXIMUM ALLOWABLE
GLARE RATING 5 (G)N/A G0 G0 G0 G1
1. IESNA Lighting Zones 0 and 5 are not applicable; refer to Lighting Zones as defined in the California
Energy Code and Chapter 10 of the Callifornia Administrative Code.
2. For property lines that abut public walkways, bikeways, plazas and parking lots, the property line may be
considered to be 5 feet beyond the actual property line for purpose of determining compliance with this
section. For property lines that abut public roadways and public transit corridors, the property line may be
considered to be the centerline of the public roadway or public transit corridor for the purpose of determining
compliance with this section.
3. General lighting luminaires in areas such as outdoor parking, sales or storage lots shall meet these
reduced ratings. Decorative luminaries located in these areas shall meet U-value limits for "all other outdoor
lighting"
TABLE 5.106.5.6.3
NUMBER OF PARKING SPACES
IN A PARKING FACILITY
MINIMUM TOTAL POWER (KVA)
REQUIRED FOR EVCS
0-9 0
10-25 7
26-50 14
51-75 20
76-100 27
101-150 40
151-200 60
201 AND OVER Total required KVA = P × .05 × 6.6
Where P = Parking spaces in facility
5.106.5.6.4 EVCS for alterations of or additions to parking facilities. Alterations of or additions to parking
facilities shall provide EVCS in compliance with Section 5.106.5.6.4. The installation of infrastructure for EV capable
spaces required to be provided without EVSE shall not be required.
5.106.5.6.4.1 Alterations of and additions to parking facilities. EVCS shall be provided in accordance with
the number indicated in Table 5.106.5.6.1 or minimum power indicated in Table 5.106.5.6.3 when the scope
of work includes an increase in power supply to an electric panel serving light fixtures illuminating the parking
area or when area containing parking spaces is added to a parking facility. The number of required EVCS
shall be based on the total number of existing and new parking spaces in the parking facility.
5.106.5.6.4.2 Alterations consisting of the installation of photovoltaic systems. EVCS shall be provided
in accordance with the number indicated in Table 5.106.5.6.1 or maximum power indicated in Table
5.106.5.6.3 when a new photovoltaic system is installed in an existing parking facility.
SECTION 5.409 LIFE CYCLE ASSESSMENT
5.409.1 SCOPE. [BSC-CG] Effective July 1, 2024, projects consisting of newly constructed building(s) with a
combined floor area of 100,000 square feet or greater shall comply with either Section 5.409.2 or Section 5.409.3.
Alteration(s) to existing building(s) where the combined altered floor area is 100,000 square feet or greater shall
comply with either Section 5.105.2, 5.409.2, or 5.409.3. Addition(s) to existing building(s) where the total floor area
combined with the existing building(s) is 100,000 square feet or greater shall comply with either Section 5.105.2,
Section 5.409.2, or Section 5.409.3. Effective January 1, 2026, the combined floor area shall be 50,000 square feet or
greater.
[DSA-SS] Projects consisting of newly constructed building(s) with a combined floor area of 50,000 square feet or
greater shall comply with either Section 5.409.2 or Section 5.409.3. Alteration(s) to existing building(s) where the
combined altered floor area is 50,000 square feet or greater shall comply with either Section 5.105.2, 5.409.2, or
5.409.3. Addition(s) to existing building(s) where the total floor area combined with the existing building(s) is 50,000
square feet or greater shall comply with either Section 5.105.2, Section 5.409.2, or Section 5.409.3.
5.106.10 GRADING AND PAVING. Construction plans shall indicate how site grading or a drainage system will
manage all surface water flows to keep water from entering buildings. Examples of methods to manage surface
water include, but are not limited to, the following:
1.Swales.
2.Water collection and disposal systems.
3.French drains.
4.Water retention gardens.
5.Other water measures which keep surface water away from buildings and aid in groundwater recharge.
Exception: Additions and alterations not altering the drainage path.
5.106.12 SHADE TREES [DSA-SS]. Shade Trees shall be planted to comply with Sections 5.106.12.1, 5.106.12.2,
and 5.106.12.3. Percentages shown shall be measured at noon on the summer solstice. Landscape irrigation
necessary to establish and maintain tree health shall comply with Section 5.304.6.
5.106.12.1 Surface parking areas. Shade tree plantings, minimum #10 container size or equal, shall be installed
to provide shade over 50 percent of the parking area within 15 years.
Exceptions: Surface parking area covered by solar photovoltaic shade structures with roofing
materials that comply with Table A5.106.11.2.2 in Appendix A5 shall be permitted in whole or in part in
lieu of shade tree planting.
5.106.12.2 Landscape areas. Shade tress plantings, minimum #10 container size or equal shall be installed to
provide shade of 20% of the landscape area within 15 years.
Exceptions: Playfields for organized sport activity are not included in the total area calculation.
5.106.12.3. Hardscape areas. Shade tree plantings, minimum #10 container size or equal shall be installed to
provide shade over 20 percent of the hardscape area within 15 years.
Exceptions:
1.Walks, hardscape areas covered by solar photovoltaic shade structures or shade structures with roofing
materials that comply with Table A5.106.11.2.2 in Appendix A5 shall be permitted in whole or in part in lieu
of shade tree planting.
2.Designated and marked play areas of organized sport activity are not included in the total area calculation.
BALANCE. To proportion flows within the distribution system, including sub-mains, branches and terminals,
according to design quantities.
BUILDING COMMISSIONING. A systematic quality assurance process that spans the entire design and construction
process, including verifying and documenting that building systems and components are planned, designed, installed,
tested, operated and maintained to meet the owner’s project requirements.
BUY CLEAN CALIFORNIA ACT (BCCA). The Buy Clean California Act (BCCA) (Public Contract Code Sections
3500-3505) targets carbon emissions associated with the production of structural steel (hot-rolled sections, hollow
structural sections, and plate), concrete reinforcing steel, flat glass, and mineral wool board insulation. The maximum
acceptable global warming potential (GWP) limits are established by the Department of General Services (DGS), in
consultation with the California Air Resources Board (CARB).
CRADLE-TO-GRAVE. Activities associated with a product or building’s life cycle from the extraction stage through
disposal stage, and covering modules A1 through C4 in accordance with ISO Standards 14025 and 21930.
ORGANIC WASTE. Food waste, green waste, landscape and pruning wste, nonhazardous wood waste, and food
soiled paper waste that is mixed in with food waste.
REFERENCE STUDY PERIOD. The period of use for the building, in years, that will be assumed for life cycle
assessment.
TEST. A procedure to determine quantitative performance of a system or equipment
TYPE III ENVIRONMENTAL PRODUCT DECLARATION (EPD). A third-party verified report that summarizes how a
product impacts the environment. Type III EPDs can be either product-specific, factory-specific, or industry-wide
EPDs. See “Cradle-to-Gate.”
FACTORY-SPECIFIC EPD. A product-specific Type III EPD in which the environmental impacts can be
attributed to a single manufacturer and manufacturing facility.
INDUSTRY-WIDE EPD (IW-EPD). A Type III EPD in which the environmental impacts are an average of the
typical manufacturing impacts for a range of products within the same product category for a group of
manufacturers.
PRODUCT-SPECIFIC EPD. A Type III EPD in which the environmental impacts can be attributed to a product
design and manufacturer across multiple facilities.
5.303.3 WATER CONSERVING PLUMBING FIXTURES AND FITTINGS. Plumbing fixtures (water closets and
urinals) and fittings (faucets and showerheads) shall comply with the following:
5.303.3.1 Water Closets. The effective flush volume of all water closets shall not exceed 1.28 gallons per
flush. Tank-type water closets shall be certified to the performance criteria of the U.S. EPA WaterSense
Specification for Tank-Type toilets.
Note: The effective flush volume of dual flush toilets is defined as the composite, average flush volume of
two reduced flushes and one full flush.
5.303.3.2 Urinals.
5.303.3.2.1 Wall-mounted Urinals. The effective flush volume of wall-mounted urinals shall not exceed
0.125 gallons per flush.
5.303.3.2.2 Floor-mounted Urinals. The effective flush volume of floor-mounted or other urinals shall
not exceed 0.5 gallons per flush.
5.303.3.3 Showerheads. [BSC-CG]
5.303.3.3.1 Single showerhead. Showerheads shall have a maximum flow rate of not more than 1.8
gallons per minute at 80 psi. Showerheads shall be certified to the performance criteria of the U.S. EPA
WaterSense Specification for Showerheads.
5.303.3.3.2 Multiple showerheads serving one shower. When a shower is served by more than one
showerhead, the combined flow rate of all the showerheads and/or other shower outlets controlled by a
single valve shall not exceed 1.8 gallons per minute at 80 psi, or the shower shall be designed to
allow only one shower outlet to be in operation at a time.
Note: A hand-held shower shall be considered a showerhead.
5.106.8.1 Facing- Backlight
Luminaries within 2MH of a property line shall be oriented so that the nearest property line is behind the fixture,
and shall comply with the backlight rating specified in Table 5.106.8 based on the lighting zone and distance to
the nearest point of that property line.
Exception: Corners. If two property lines (or two segments of the same property line) have equidistant point
to the luminaire, then the luminaire may be oriented so that the intersection of the two lines (the corner) is
directly behind the luminaire. The luminaire shall still use the distance to the nearest points(s) on the property
lines to determine the required backlight rating.
5.106.8.2 Facing-Glare.
For luminaires covered by 5.106.8.1, if a property line also exists within or extends into the front hemisphere
within 2MH of the luminaire then the luminaire shall comply with the more stringent glare rating specified in
Table 5.106.8 based on the lighting zone and distance to the nearest point on the nearest property line within
the front hemisphere.
Note: [N]
1.See also California Building Code, Chapter 12, Section 1205.6 for college campus lighting requirements for
parking facilities and walkways.
2.Refer to Chapter 8 (Compliance Forms, Worksheets and Reference Material) for IES TM-15-11 Table
A-1, California Energy Code Tables 130.2-A and 130.2-B.
3. Refer to the California Building Code for requirements for additions and alterations.
5.106.5.6.2.1 Reduced number of EV capable spaces. The installation of each DCFC EVSE shall be
permitted to reduce the minimum number of required EV capable spaces indicated in Table 5.106.5.6.1
by five and reduce proportionally the required electrical load capacity to the service panel or subpanel.
5.106.5.6.2.2 Multiple connectors. EVSE with multiple vehicle connectors capable of charging multiple
EVs simultaneously shall be permitted if the electrical load capacity required by Section 5.106.5.6.1 for
each EV capable space is accumulatively supplied to the EVSE.
5.106.5.6.2.3 Use of automatic load management systems (ALMS). ALMS shall be permitted for
EVCS installed in accordance with Section 5.105.5.6.2. When ALMS is installed, the required electrical
load capacity specified in Section 5.106.5.6.1 for each EVCS may be reduced when serviced by an
EVSE controlled by an ALMS. Each EVSE controlled by an ALMS shall deliver a minimum 30 amperes
to an EV when charging one vehicle and shall deliver a minimum 3.3 kW while simultaneously charging
multiple EVs.
5.106.5.6.3 EVCS alternative compliance. In lieu of compliance with Section 5.106.5.6.2, EVCS shall be
provided with Level 1, low power Level 2, or Level 2, or any combination of Level 1, low power Level 2 or
Level 2 EVSE such that the total power supplied by the combination of EVSE meets the minimum power
indicated in Table 5.106.5.6.3, based on the total number of actual parking spaces in each parking facility.
N/A
N/A
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
GR-2
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
GR
E
E
N
C
O
D
E
-
1
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
7 / 6 / 2025
DIVISION 5.5 ENVIRONMENTAL QUALITY
SECTION 5.501 GENERAL
5.501.1 SCOPE. The provisions of this chapter shall outline means of reducing the quantity of air contaminants that
are odorous, irritating, and/or harmful to the comfort and well-being of a building's installers, occupants and neighbors.
SECTION 5.502 DEFINITIONS
5.502.1 DEFINITIONS. The following terms are defined in Chapter 2 (and are included here for reference)
ARTERIAL HIGHWAY. A general term denoting a highway primarily for through traffic usually on a continuous route.
A-WEIGHTED SOUND LEVEL (dBA). The sound pressure level in decibels as measured on a sound level meter
using the internationally standardized A-weighting filter or as computed from sound spectral data to which A-weighting
adjustments have been made.
1 BTU/HOUR. British thermal units per hour, also referred to as Btu. The amount of heat required to raise one pound
of water one degree Fahrenheit per hour, a common measure of heat transfer rate. A ton of refrigeration is 12,000 Btu,
the amount of heat required to melt a ton (2,000 pounds) of ice at 320 Fahrenheit.
COMMUNITY NOISE EQUIVALENT LEVEL (CNEL). A metric similar to the day-night average sound level (Ldn),
except that a 5 decibel adjustment is added to the equivalent continuous sound exposure level for evening hours (7pm
to 10pm) in addition to the 10 dB nighttime adjustment used in the Ldn.
COMPOSITE WOOD PRODUCTS. Composite wood products include hardwood plywood, particleboard and medium
density fiberboard. “Composite wood products” does not include hardboard, structural plywood, structural
panels, structural composite lumber, oriented strand board, glued laminated timber, timber, prefabricated wood I–joists
or finger–jointed lumber, all as specified in California Code of Regulations (CCR), Title 17, Section 93120.1(a).
Note: See CCR, Title 17, Section 93120.1.
DAY-NIGHT AVERAGE SOUND LEVEL (Ldn). The A-weighted equivalent continuous sound exposure level for a
24-hour period with a 10 dB adjustment added to sound levels occurring during nighttime hours (10p.m. to 7 a.m.).
DECIBEL (db). A measure on a logarithmic scale of the magnitude of a particular quantity (such as sound pressure,
sound power, sound intensity) with respect to a reference quantity.
ELECTRIC VEHICLE (EV). An automotive-type vehicle for on-road use, such as passenger automobiles, buses,
trucks, vans, neighborhood electric vehicles, electric motorcycles, and the like, primarily powered by an electric motor
that draws current from a rechargeable storage battery, fuel cell, photovoltaic array, or other source of electric current.
Plug-in hybrid electric vehicles (PHEV) are considered electric vehicles. For purposes of the California Electrical Code,
off-road, self-propoelled electric vehicles, such as industrial trucks, hoists, lifts, transports, golf carts, airline ground
support equipment, tractors, boats, and the like, are not included.
ELECTRIC VEHICLE CHARGING STATION(S) (EVCSj). One or more spaces intended for charging electric vehicles.
ELECTRIC VEHICLE SUPPLY EQUIPMENT (EVSE). The conductors, including the ungrounded, grounded, and
equipment grounding conductors and the electric vehicle connectors, attachment plugs, and all other fittings, devices,
power outlets, or apparatus installed specifically for the purpose of transferring energy between the premises wiring
and the electric vehicle.
ENERGY EQUIVALENT (NOISE) LEVEL (Leq). The level of a steady noise which would have the same energy as
the fluctuating noise level integrated over the time of period of interest.
EXPRESSWAY. An arterial highway for through traffic which may have partial control of access, but which may or may
not be divided or have grade separations at intersections.
FREEWAY. A divided arterial highway with full control of access and with grade separations at intersections.
GLOBAL WARMING POTENTIAL (GWP). The radiative forcing impact of one mass-based unit of a given greenhouse
gas relative to an equivalent unit of carbon dioxide over a given period of time. Carbon dioxide is the reference
compound with a GWP of one.
GLOBAL WARMING POTENTIAL VALUE (GWP VALUE). A 100-year GWP value published by the
Intergovernmental Panel on Climate Change (IPCC) in either its Second Assessment Report (SAR) (IPCC, 1995); or
its Fourth Assessment A-3 Report (AR4) (IPCC, 2007). The SAR GWP values are found in column "SAR (100-yr)" of
Table 2.14.; the AR4 GWP values are found in column "100 yr" of Table 2.14.
HIGH-GWP REFRIGERANT. A compound used as a heat transfer fluid or gas that is: (a) a chlorofluorocarbon, a
hdrochlorofluorocarbon, a hydrofluorocarbon, a perfluorocarbon, or any compound or blend of compounds, with a
GWP value equal to or greater than 150, or (B) any ozone depleting substance as defined in Title 40 of the Code of
Federal Regulations, Part 82, sec.82.3 (as amended March 10, 2009).
LONG RADIUS ELBOW. Pipe fitting installed between two lengths of pipe or tubing to allow a change of direction,
with a radius 1.5 times the pipe diameter.
LOW-GWP REFRIGERANT. A compound used as a heat transfer fluid or gas that: (A) has a GWP value less than
150, and (B) is not an ozone depleting substance as defined in Title 40 of the Code of Federal Regulations, Part 82,
sec.82.3 (as amended March 10, 2009).
MERV. Filter minimum efficiency reporting value, based on ASHRAE 52.2–1999.
MAXIMUM INCREMENTAL REACTIVITY (MIR). The maximum change in weight of ozone formed by adding a
compound to the "Base REactive Organic Gas (ROG) Mixture" per weight of compound added, expressed to
hundreths of a gram (g O3/g ROC).
PRODUCT-WEIGHTED MIR (PWMIR). The sum of all weighted-MIR for all ingredients in a product subject to this
article. The PWMIR is the total product reactivity expressed to hundredths of a gram of ozone formed per gram of
product (excluding container and packaging).
PSIG. Pounds per square inch, guage.
REACTIVE ORGANIC COMPOUND (ROC). Any compound that has the potential, once emitted, to contribute to
ozone formation in the troposphere.
SCHRADER ACCESS VALVES. Access fittings with a valve core installed.
SHORT RADIUS ELBOW. Pipe fitting installed between two lengths of pipe or tubing to allow a change of direction,
with a radius 1.0 times the pipe diameter.
SUPERMARKET. For the purposes of Section 5.508.2, a supermarket is any retail food facility with 8,000 square feet
or more conditioned area, and that utilizes either refrigerated display cases, or walk-in coolers or freezers connected
to remote compressor units or condensing units.
VOC. A volatile organic compound broadly defined as a chemical compound based on carbon chains or rings with
vapor pressures greater than 0.1 millimeters of mercury at room temperature. These compounds typically contain
hydrogen and may contain oxygen, nitrogen and other elements. See CCR Title 17, Section 94508(a).
Note: Where specific regulations are cited from different agencies such as SCAQMD, ARB, etc., the VOC definition
included in that specific regulation is the one that prevails for the specific measure in question.
SECTION 5.504 POLLUTANT CONTROL
5.504.1 TEMPORARY VENTILATION. The permanent HVAC system shall only be used during construction if
necessary to condition the building or areas of addition or alteration within the required temperature range for
material and equipment installation. If the HVAC system is used during construction, use return air filters with a
Minimum Efficiency Reporting Value (MERV) of 8, based on ASHRAE 52.2-1999, or an average efficiency of
30% based on ASHRAE 52.1-1992 Replace all filters immediately prior to occupancy, or, if the building is
occupied during alteration, at the conclusion of construction.
5.504.3 Covering of duct openings and protection of mechanical equipment during construction. At the time of
rough installation and during storage on the construction site until final startup of the heating, cooling and ventilation
equipment, all duct and other related air distribution component openings shall be covered with tape, plastic,
sheetmetal or other methods acceptable to the enforcing agency to reduce the amount of dust, water and debris which
may enter the system.
5.410.2.1 Owner's or Owner Representative's Project Requirements (OPR). [N] The expectations and
requirements of the building appropriate to its phase shall be documented before the design phase of the
project begins. This documentation shall include the following:
1. Environmental and sustainability goals.
2. Building sustainable goals.
3. Indoor environmental quality requirements.
4. Project program, including facility functions and hours of operation, and need for after hours
operation.
5. Equipment and systems expectations.
6. Building occupant and operation and maintenance (O&M) personnel expectations.
5.410.2.2 Basis of Design (BOD). [N] A written explanation of how the design of the building systems meets
the OPR shall be completed at the design phase of the building project. The Basis of Design document shall
cover the following systems:
1. Renewable energy systems.
2. Landscape irrigation systems.
3. Water reuse system.
5.410.2.3 Commissioning plan. [N] Prior to permit issuance a commissioning plan shall be completed to
document how the project will be commissioned. The commissioning plan shall include the following:
1. General project information.
2. Commissioning goals.
3. Systems to be commissioned. Plans to test systems and components shall include:
a. An explanation of the original design intent.
b. Equipment and systems to be tested, including the extent of tests.
c. Functions to be tested.
d. Conditions under which the test shall be performed.
e. Measurable criteria for acceptable performance.
4. Commissioning team information.
5. Commissioning process activities, schedules and responsibilities. Plans for the completion of
commissioning shall be included.
5.410.2.4 Functional performance testing. [N] Functional performance tests shall demonstrate the correct
installation and operation of each component, system and system-to-system interface in accordance with the
approved plans and specifications. Functional performance testing reports shall contain information addressing
each of the building components tested, the testing methods utilized, and include any readings and adjustments
made.
TABLE 5.504.4.1 - ADHESIVE VOC LIMIT1,2
Less Water and Less Exempt Compounds in Grams per Liter
ARCHITECTURAL APPLICATIONS CURRENT VOC LIMIT
INDOOR CARPET ADHESIVES 50
CARPET PAD ADHESIVES 50
OUTDOOR CARPET ADHESIVES 150
WOOD FLOORING ADHESIVES 100
RUBBER FLOOR ADHESIVES 60
SUBFLOOR ADHESIVES 50
CERAMIC TILE ADHESIVES 65
VCT & ASPHALT TILE ADHESIVES 50
DRYWALL & PANEL ADHESIVES 50
COVE BASE ADHESIVES 50
MULTIPURPOSE CONSTRUCTION ADHESIVES 70
STRUCTURAL GLAZING ADHESIVES 100
SINGLE-PLY ROOF MEMBRANE ADHESIVES 250
OTHER ADHESIVES NOT SPECIFICALLY LISTED 50
SPECIALTY APPLICATIONS
PVC WELDING 510
CPVC WELDING 490
ABS WELDING 325
PLASTIC CEMENT WELDING 250
ADHESIVE PRIMER FOR PLASTIC 550
CONTACT ADHESIVE 80
SPECIAL PURPOSE CONTACT ADHESIVE 250
STRUCTURAL WOOD MEMBER ADHESIVE 140
TOP & TRIM ADHESIVE 250
SUBSTRATE SPECIFIC APPLICATIONS
METAL TO METAL 30
PLASTIC FOAMS 50
POROUS MATERIAL (EXCEPT WOOD)50
WOOD 30
FIBERGLASS 80
1. IF AN ADHESIVE IS USED TO BOND DISSIMILAR SUBSTRATES TOGETHER, THE ADHESIVE
WITH THE HIGHEST VOC CONTENT SHALL BE ALLOWED.
2. FOR ADDITIONAL INFORMATION REGARDING METHODS TO MEASURE THE VOC
CONTENT SPECIFIED IN THIS TABLE, SEE SOUTH COAST AIR QUALITY MANAGEMENT
DISTRICT RULE 1168, www.arb.ca.gov/DRDB/SC/CURHTML/R1168.PDF
TABLE 5.504.4.2 - SEALANT VOC LIMIT
Less Water and Less Exempt Compounds in Grams per Liter
SEALANTS CURRENT VOC LIMIT
ARCHITECTURAL 250
MARINE DECK 760
NONMEMBRANE ROOF 300
ROADWAY 250
SINGLE-PLY ROOF MEMBRANE 450
OTHER 420
SEALANT PRIMERS
ARCHITECTURAL
NONPOROUS 250
POROUS 775
MODIFIED BITUMINOUS 500
MARINE DECK 760
OTHER 750
NOTE: FOR ADDITIONAL INFORMATION REGARDING METHODS TO MEASURE THE VOC
CONTENT SPECIFIED IN THESE TABLES, SEE SOUTH COAST AIR QUALITY MANAGEMENT
DISTRICT RULE 1168.
5.410.2.6 Commissioning report. [N] A report of commissioning process activities undertaken through the
design and construction phases of the building project shall be completed and provided to the owner or
representative.
5.410.4 TESTING AND ADJUSTING. New buildings less than 10,000 square feet. Testing and adjusting of
systems shall be required for new buildings less than 10,000 square feet or new systems to serve an addition or
alteration subject to Section 303.1.
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE
NONRESIDENTIAL MANDATORY MEASURES, SHEET 3 (July 2024 Supplement)
5.409.3.2 Verification of compliance. Calculations to demonstrate compliance, Type III EPDs for products
required to comply, if included in the project, and Worksheet WS-5 signed by the design professional of record
shall be provided on the construction documents. Updated EPDs for products used in construction shall be
provided to the owner at the close of construction and to the enforcement entity upon request. The enforcing
agency may require inspection and inspection reports in accordance with Sections 702.2 and 703.1 during and
at completion of construction to demonstrate substantial conformance. Inspection shall be performed by the
design professional of record or third party acceptable to the enforcing agency.
SECTION 5.410 BUILDING MAINTENANCE AND OPERATIONS
5.410.1 RECYCLING BY OCCUPANTS. Provide readily accessible areas that serve the entire building and are
identified for the depositing, storage and collection of non-hazardous materials for recycling, including (at a minimum)
paper, corrugated cardboard, glass, plastics, organic waste, and metals or meet a lawfully enacted local recycling
ordinance, if more restrictive.
Exception: Rural jurisdictions that meet and apply for the exemption in Public Resources
Code 42649.82 (a)(2)(A) et seq. shall also be exempt from the organic waste portion of this section.
5.410.1.1 Additions. All additions conducted within a 12-month period under single or multiple permits,
resulting in an increase of 30% or more in floor area, shall provide recycling areas on site.
Exception: Additions within a tenant space resulting in less than a 30% increase in the tenant space
floor area.
5.410.1.2 Sample ordinance. Space allocation for recycling areas shall comply with Chapter 18, Part 3,
Division 30 of the Public Resources Code. Chapter 18 is known as the California Solid Waste Reuse and
Recycling Access Act of 1991 (Act).
Note: A sample ordinance for use by local agencies may be found in Appendix A of the document at the
CalRecycle’s web site.
5.410.2.5 Documentation and training. [N] A Systems Manual and Systems Operations Training are required,
including Occupational Safety and Health Act (OSHA) requirements in California Code of Regulations (CCR),
Title 8, Section 5142, and other related regulations.
5.410.2.5.1 Systems manual. [N] Documentation of the operational aspects of the building shall be
completed within the systems manual and delivered to the building owner or representative. The
systems manual shall include the following:
1. Site information, including facility description, history and current requirements.
2. Site contact information.
3. Basic operations and maintenance, including general site operating procedures, basic
troubleshooting, recommended maintenance requirements, site events log.
4. Major systems.
5. Site equipment inventory and maintenance notes.
6. A copy of verifications required by the enforcing agency or this code.
7. Other resources and documentation, if applicable.
5.410.2.5.2 Systems operations training. [N] A program for training of the appropriate maintenance
staff for each equipment type and/or system shall be developed and documented in the commissioning
report and shall include the following:
1. System/equipment overview (what it is, what it does and with what other systems and/or
equipment it interfaces).
2. Review and demonstration of servicing/preventive maintenance.
3. Review of the information in the Systems Manual.
4. Review of the record drawings on the system/equipment.
5.504.4 FINISH MATERIAL POLLUTANT CONTROL. Finish materials shall comply with Sections 5.504.4.1 through
5.504.4.6.
5.504.4.1 Adhesives, sealants and caulks. Adhesives, sealants, and caulks used on the project shall meet
the requirements of the following standards:
1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and caulks shall
comply with local or regional air pollution control or air quality management district rules where
applicable, or SCAQMD Rule 1168 VOC limits, as shown in Tables 5.504.4.1 and 5.504.4.2. Such
products also shall comply with the Rule 1168 prohibition on the use of certain toxic compounds
(chloroform, ethylene dichloride, methylene chloride, perchloroethylene and trichloroethylene), except for
aerosol products as specified in subsection 2, below.
2. Aerosol adhesives, and smaller unit sizes of adhesives, and sealant or caulking compounds (in
units of product, less packaging, which do not weigh more than one pound and do not consist of more
than 16 fluid ounces) shall comply with statewide VOC standards and other requirements, including
prohibitions on use of certain toxic compounds, of California Code of Regulations, Title 17, commencing
with Section 94507.
DISCLAIMER:THIS DOCUMENT IS PROVIDED AND INTENDED TO BE USED AS A MEANS TO INDICATE AREAS OF COMPLIANCE WITH THE CALIFORNIA GREEN BUILDING STANDARDS (CALGREEN) CODE. DUE TO THE VARIABLES BETWEEN BUILDING DEPARTMENT JURISDICTIONS, THIS CHECKLIST IS TO BE USED ON AN INDIVIDUAL PROJECT BASIS AND MAY BE MODIFIED BY THE END USER TO MEET THOSE INDIVIDUAL NEEDS. THE END USER ASSUMES ALL RESPONSIBILITY ASSOCIATED WITH THE USE OF THIS DOCUMENT, INCLUDING VERIFICATION WITH THE FULL CODE.
Y N/A
5.410.2 COMMISSIONING. [N] New buildings 10,000 square feet and over. For new buildings 10,000 square feet
and over, building commissioning shall be included in the design and construction processes of the building project to
verify that the building systems and components meet the owner’s or owner representative’s project
requirements. Commissioning shall be performed in accordance with this section by trained personnel with experience
on projects of comparable size and complexity. For I-occupancies that are not regulated by OSHPD or for
I-occupancies and L-occupancies that are not regulated y the California Energy Code Section 100.0 Scope, all
requirements in Sections 5.410.2 through 5.410.2.6 shall apply.
Note: For energy-related systems under the scope (Section 100) of the California Energy Code, including heating,
ventilation, air conditioning (HVAC) systems and controls, indoor lighting systems and controls, as well as water
heating systems and controls, refer to California Energy Code Section 120.8 for commissioning requirements
Commissioning requirements shall include:
1. Owner’s or Owner representative’s project requirements.
2. Basis of design.
3. Commissioning measures shown in the construction documents.
4. Commissioning plan.
5. Functional performance testing.
6. Documentation and training.
7. Commissioning report.
Exceptions:
1. Unconditioned warehouses of any size.
2. Areas less than 10,000 square feet used for offices or other conditioned accessory spaces within
unconditioned warehouses.
3. Tenant improvements less than 10,000 square feet as described in Section 303.1.1.
4. Open parking garages of any size, or open parking garage areas, of any size, within a structure.
Note: For the purposes of this section, unconditioned shall mean a building, area or room which does not
provide heating and/or air conditioning.
Informational Notes:
1. . Functional performance testing for heating, ventilation, air conditioning systems and lighting controls
must be performed in compliance with the California Energy Code.
5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide a final report of testing
signed by the individual responsible for performing these services.
5.410.4.5 Operation and maintenance (O & M) manual. Provide the building owner or representative with
detailed operating and maintenance instructions and copies of guaranties/warranties for each system. O & M
instructions shall be consistent with OSHA requirements in CCR, Title 8, Section 5142, and other related
regulations.
5.410.4.5.1 Inspections and reports. Include a copy of all inspection verifications and reports required
by the enforcing agency.
Y N/A Y N/A Y N/ARESPON.
PARTY
RESPON.
PARTY
RESPON.
PARTY
RESPON.
PARTY
Y = YES
N/A =NOT APPLICABLE
RESPON. PARTY =RESPONSIBLE PARTY (ie: ARCHITECT, ENGINEER,
OWNER, CONTRACTOR, INSPECTOR ETC.)
1. The GWP values of the products listed in Table 5.409.3 are based on 175 percent of Buy Clean California Act
(BCCA) GWP values, except for concrete products which are not included in the BCCA.
2. For concrete, 175 percent of the National Ready Mixed Concrete Association (NRMCA) 2022 version 3
Pacific Southwest regional benchmark values are used for the GWP allowed, except for High Early Strength.
3. Concrete High Early Strength ready-mixed shall be calculated at 130 percent of the ready-mixed concrete
GWP allowed values for each product category.
4. The GWP unit for flat glass has been adjusted to correct an error in the express terms. With the revised unit
(MT CO2e/MT), reported GWP values will align with industry data as published in the CLF North American
Material Baselines (2023).
5.409.3.1 Products shall not exceed the maximum GWP value specified in Table 5.409.3.
Exception: Concrete may be considered one product category to meet compliance with this section. A
weighted average of the maximum GWP for all concrete mixes installed in the project shall be less than the
weighted average maximum GWP allowed per Table 5.409.3 using Exception Equation 5.409.3.1. Calculations
shall be performed with consistent units of measurement for the material quantity and the GWP value.
For the purposes of this exception, industry-wide EPDs are acceptable.
Exception EQUATION 5.409.3.1
GWPn < GWPallowed
where
GWPn = Σ (GWPn)(vn)
and
GWPallowed = Σ (GWPallowed)(vn)
and
n = each concrete mix installed in the project
GWPn = the GWP for concrete mix n per concrete
mix EPD, in kg CO2e/m3
GWPallowed = the GWP potential allowed for concrete
mix n per Table 5.409.3
vn = the volume of concrete mix n installed in
the project, in m3
TABLE 5.409.3
PRODUCT GWP LIMITS
BUY CLEAN CALIFORNIA
MATERIALS PRODUCT
CATEGORY1
MAXIMUM
ACCEPTABLE GWP
VALUE (unfabricated)
(GWPallowed)
UNIT OF
MEASUREMENT
Hot-rolled structural steel
sections 1.77 MT CO2e/MT
Hollow structural sections 3.00 MT CO2e/MT
Steel plate 2.61 MT CO2e/MT
Concrete reinforcing steel 1.56 MT CO2e/MT
Flat glass 2.50 MT CO2e/MT 4
Light-density mineral
wool board insulation 5.83 kg CO2e/MT
Heavy-density mineral
wool board insulation 14.28 kg CO2e/MT
Concrete, Ready-Mixed2, 3
CONCRETE PRODUCT
CATEGORY
MAXIMUM GWP
ALLOWED VALUE
(GWPallowed)
UNIT OF
MEASUREMENT
up to 2499 psi 450 kg CO2e/m3
2500−3499 psi 489 kg CO2e/m3
3500−4499 psi 566 kg CO2e/m3
4500−5499 psi 661 kg CO2e/m3
5500−6499 psi 701 kg CO2e/m3
6500 psi and greater 799 kg CO2e/m3
Concrete, Lightweight Ready-Mixed2
CONCRETE PRODUCT
CATEGORY
MAXIMUM GWP
ALLOWED VALUE
(GWPallowed)
UNIT OF
MEASUREMENT
up to 2499 psi 875 kg CO2e/m3
2500−3499 psi 956 kg CO2e/m3
3500−4499 psi 1039 kg CO2e/m3
5.409.2 Whole building life cycle assessment. Projects shall conduct a cradle-to-grave whole building life cycle
assessment performed in accordance with ISO 14040 and ISO 14044, excluding operating energy, and
demonstrating a minimum 10-percent reduction in global warming potential (GWP) as compared to a reference
baseline building of similar size, function, complexity, type of construction, material specification, and location that
meets the requirements of the California Energy Code currently in effect. Software used to conduct the whole building
life cycle assessment, including reference baseline building, shall have a data set compliant with ISO 14044, and ISO
21930 or EN 15804, and the software shall conform to ISO 21931 and/or EN 15978. The software tools and data sets
shall be the same for evaluation of both the baseline building and the proposed building.
Notes:
1. Software for calculating whole building life cycle assessment is available for free at Athena Sustainable
Materials Institute (https://calculatelca.com/software/impact-estimator/) and OneClick LCA-Planetary
(www.oneclicklca.com/planetary). Paid versions include, but are not limited to, Sphera GaBi Solutions
(gabi.sphera.com), SimaPro (simapro.com), One-Click LCA (www.oneclicklca.com) and Tally for Revit
(apps.autodesk.com).
2. ASTM E2921-22 “Standard Practice for Minimum Criteria for Comparing Whole Building Life Cycle
Assessments for Use with Building Codes, Standards, and Rating Systems” may be consulted for the
assessment.
3. In addition to the required documentation specified in Section 5.409.2.3, Worksheet WS-9 may be
required by the enforcing entity to demonstrate compliance with the requirements.
5.409.2.1 Building components. Building enclosure components included in the assessment shall be limited
to glazing assemblies, insulation, and exterior finishes. Primary and secondary structural members included in
the assessment shall be limited to footings and foundations, and structural columns, beams, walls, roofs, and
floors.
5.409.2.2 Reference study period. The reference study period of the proposed building shall be equal to the
reference baseline building and shall be 60 years.
5.409.2.3 Verification of compliance. A summary of the GWP analysis produced by the software and
Worksheet WS-4 signed by the design professional of record shall be provided in the construction documents
as documentation of compliance. A copy of the whole building life cycle assessment which includes the GWP
analysis produced by the software, in addition to maintenance and training information, shall be included in the
operation and maintenance manual and shall be provided to the owner at the close of construction. The
enforcing agency may require inspection and inspection reports in accordance with Sections 702.2 and 703.1
during and at completion of construction to demonstrate substantial conformance. Inspection shall be
performed by the design professional of record or third party acceptable to the enforcing agency.
3URGXFW*:3FRPSOLDQFH²SUHVFULSWLYHSDWKEach product that is permanently installed and listed in
Table 5.409.3 shall have a Type III environmental product declaration (EPD), either product-specific or
factory-specific.
SECTION 5.503 FIREPLACES
5.503.1 FIREPLACES. Install only a direct-vent sealed-combustion gas or sealed wood-burning fireplace, or a sealed
woodstove or pellet stove, and refer to residential requirements in the California Energy Code, Title 24, Part 6,
Subchapter 7, Section 150. Woodstoves, pellet stoves and fireplaces shall comply with applicable local ordinances.
5.503.1.1 Woodstoves. Woodstoves and pellet stoves shall comply with U.S. EPA New Source Performance
Standards (NSPS) emission limits as applicable, and shall have a permanent label indicating they are certified
to meet the emission limits.
5.410.4.2 (Reserved)
Note: For energy-related systems under the scope (Section 100) of the California Energy Code, including
heating, ventilation, air conditioning (HVAC) systems and controls, indoor lighting system and controls, as well
as water heating systems and controls, refer to California Energy Code Section 120.8 for commissioning
requirements and Sections 120.5, 120.6, 130.4, and 140.9(b)3 for additional testing requirements of specific
systems.
5.410.4.2 Systems. Develop a written plan of procedures for testing and adjusting systems. Systems to be
included for testing and adjusting shall include at a minimum, as applicable to the project:
1. Renewable energy systems.
2. Landscape irrigation systems.
3. Water reuse systems.
5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance with manufacturer's
specifications and applicable standards on each system.
5.410.4.3.1 HVAC balancing. In addition to testing and adjusting, before a new space-conditioning
system serving a building or space is operated for normal use, the system shall be balanced in
accordance with the procedures defined by the Testing Adjusting and Balancing Bureau National
Standards; the National Environmental Balancing Bureau Procedural Standards; Associated Air Balance
Council National Standards or as approved by the enforcing agency.
N/A
Y
Y
N/A
Y
N/A
Y
Y
GR-3
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
GR
E
E
N
C
O
D
E
-
1
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
7 / 6 / 2025
5.504.4.3 Paints and coatings. Architectural paints and coatings shall comply with VOC limits in Table 1 of
the ARB Architectural Coatings Suggested Control Measure, as shown in Table 5.504.4.3, unless more
stringent local limits apply. The VOC content limit for coatings that do not meet the definitions for the specialty
coatings categories listed in Table 5.504.4.3 shall be determined by classifying the coating as a Flat, Nonflat
or Nonflat-High Gloss coating, based on its gloss, as defined in Subsections 4.21, 4.36 and 4.37 of the 2007
California Air Resources Board Suggested Control Measure, and the corresponding Flat, Nonflat or
Nonflat-High Gloss VOC limit in Table 5.504.4.3 shall apply.
5.504.4.3.1 Aerosol Paints and coatings. Aerosol paints and coatings shall meet the PWMIR Limits for
ROC in Section 94522(a)(3) and other requirements, including prohibitions on use of certain toxic
compounds and ozone depleting substances, in Sections 94522(c)(2) and (d)(2) of California Code of
Regulations, Title 17, commencing with Section 94520; and in areas under the jurisdiction of the
Bay Area Air Quality Management District additionally comply with the percent VOC by weight of product
limits of Regulation 8 Rule 49.
5.504.4.5 Composite wood products. Hardwood plywood, particleboard and medium density fiberboard
composite wood products used on the interior or exterior of the buildings shall meet the requirements for
formaldehyde as specified in ARB's Air Toxics Control Measure (ATCM) for Composite Wood (17 CCR 93120 et
seq.). Those materials not exempted under the ATCM must meet the specified emission limits, as shown in
Table 5.504.4.5.
5.504.4.5.3 Documentation. Verification of compliance with this section shall be provided as
requested by the enforcing agency. Documentation shall include at least one of the following:
1. Product certifications and specifications.
2. Chain of custody certifications.
3. Product labeled and invoiced as meeting the Composite Wood Products regulation (see
CCR, Title 17, Section 93120, et seq.).
4. Exterior grade products marked as meeting the PS-1 or PS-2 standards of the
Engineered Wood Association, the Australian AS/NZS 2269 or European 636 3S
standards.
5. Other methods acceptable to the enforcing agency.
SPECIALTY COATINGS
ALUMINUM ROOF COATINGS 400
BASEMENT SPECIALTY COATINGS 400
BITUMINOUS ROOF COATINGS 50
BITUMINOUS ROOF PRIMERS 350
BOND BREAKERS 350
CONCRETE CURING COMPOUNDS 350
CONCRETE/MASONRY SEALERS 100
DRIVEWAY SEALERS 50
DRY FOG COATINGS 150
FAUX FINISHING COATINGS 350
FIRE RESISTIVE COATINGS 350
FLOOR COATINGS 100
FORM-RELEASE COMPOUNDS 250
GRAPHIC ARTS COATINGS (SIGN PAINTS)500
HIGH-TEMPERATURE COATINGS 420
INDUSTRIAL MAINTENANCE COATINGS 250
LOW SOLIDS COATINGS1 120
MAGNESITE CEMENT COATINGS 450
MASTIC TEXTURE COATINGS 100
METALLIC PIGMENTED COATINGS 500
MULTICOLOR COATINGS 250
PRETREATMENT WASH PRIMERS 420
PRIMERS, SEALERS, & UNDERCOATERS 100
REACTIVE PENETRATING SEALERS 350
RECYCLED COATINGS 250
ROOF COATINGS 50
RUST PREVENTATIVE COATINGS 250
SHELLACS:
CLEAR 730
OPAQUE 550
SPECIALTY PRIMERS, SEALERS & UNDERCOATERS 100
STAINS 250
STONE CONSOLIDANTS 450
SWIMMING POOL COATINGS 340
TRAFFIC MARKING COATINGS 100
TUB & TILE REFINISH COATINGS 420
WATERPROOFING MEMBRANES 250
WOOD COATINGS 275
WOOD PRESERVATIVES 350
ZINC-RICH PRIMERS 340
1. GRAMS OF VOC PER LITER OF COATING, INCLUDING WATER & EXEMPT COMPOUNDS
2. THE SPECIFIED LIMITS REMAIN IN EFFECT UNLESS REVISED LIMITS ARE LISTED IN SUBSEQUENT COLUMNS
IN THE TABLE.
3. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIFORNIA AIR RESOURCES BOARD,
ARCHITECTURAL COATINGS SUGGESTED CONTROL MEASURE, FEB. 1, 2008. MORE INFORMATION IS
AVAILABLE FROM THE AIR RESOURCES BOARD.
TABLE 5.504.4.5 - FORMALDEHYDE LIMITS1
MAXIMUM FORMALDEHYDE EMISSIONS IN PARTS PER MILLION
PRODUCT CURRENT LIMIT
HARDWOOD PLYWOOD VENEER CORE 0.05
HARDWOOD PLYWOOD COMPOSITE CORE 0.05
PARTICLE BOARD 0.09
MEDIUM DENSITY FIBERBOARD 0.11
THIN MEDIUM DENSITY FIBERBOARD2 0.13
1. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIFORNIA AIR RESOURCES BOARD, AIR
TOXICS CONTROL MEASURE FOR COMPOSITE WOOD AS TESTED IN ACCORDANCE WITH ASTM E 1333. FOR
ADDITIONAL INFORMATION, SEE CALIFORNIA CODE OF REGULATIONS, TITLE 17, SECTIONS 93120 THROUGH 93120.12.
2. THIN MEDIUM DENSITY FIBERBOARD HAS A MAXIMUM THICKNESS OF 5/16 INCHES (8 MM).
5.508.2.6 Evacuation. The system shall be evacuated after pressure testing and prior to charging.
5.508.2.6.1 First vacuum. Pull a system vacuum down to at least 1000 microns (+/- 50 microns), and
hold for 30 minutes.
5.508.2.6.2 Second vacuum. Pull a second system vacuum to a minimum of 500 microns and hold for 30
minutes.
5.508.2.6.3 Third vacuum. Pull a third vacuum down to a minimum of 300 microns, and hold for 24 hours
with a maximum drift of 100 microns over a 24-hour period.
CHAPTER 7
INSTALLER & SPECIAL INSPECTOR QUALIFICATIONS
702 QUALIFICATIONS
702.1 INSTALLER TRAINING. HVAC system installers shall be trained and certified in the proper
installation of HVAC systems including ducts and equipment by a nationally or regionally recognized training or
certification program. Uncertified persons may perform HVAC installations when under the direct supervision and
responsibility of a person trained and certified to install HVAC systems or contractor licensed to install HVAC systems.
Examples of acceptable HVAC training and certification programs include but are not limited to the following:
1. State certified apprenticeship programs.
2. Public utility training programs.
3. Training programs sponsored by trade, labor or statewide energy consulting or verification organizations.
4. Programs sponsored by manufacturing organizations.
5. Other programs acceptable to the enforcing agency.
702.2 SPECIAL INSPECTION [HCD]. When required by the enforcing agency, the owner or the
responsible entity acting as the owner's agent shall employ one or more special inspectors to provide inspection or
other duties necessary to substantiate compliance with this code. Special inspectors shall demonstrate competence
to the satisfaction of the enforcing agency for the particular type of inspection or task to be performed. In addition to
other certifications or qualifications acceptable to the enforcing agency, the following certifications or education may be
considered by the enforcing agency when evaluating the qualifications of a special inspector:
1. Certification by a national or regional green building program or standard publisher.
2. Certification by a statewide energy consulting or verification organization, such as HERS raters, building
performance contractors, and home energy auditors.
3. Successful completion of a third party apprentice training program in the appropriate trade.
4. Other programs acceptable to the enforcing agency.
Notes:
1. Special inspectors shall be independent entities with no financial interest in the materials or the
project they are inspecting for compliance with this code.
2. HERS raters are special inspectors certified by the California Energy Commission (CEC) to rate
homes in California according to the Home Energy Rating System (HERS).
[BSC-CG] When required by the enforcing agency, the owner or the responsible entity acting as the owner's agent
shall employ one or more special inspectors to provide inspection or other duties necessary to substantiate
compliance with this code. Special inspectors shall demonstrate competence to the satisfaction of the enforcing
agency for the particular type of inspection or task to be performed. In addition, the special inspector shall have a
certification from a recognized state, national or international association, as determined by the local agency. The
area of certification shall be closely related to the primary job function, as determined by the local agency.
Note: Special inspectors shall be independent entities with no financial interest in the materials or the
project they are inspecting for compliance with this code.
703 VERIFICATIONS
703.1 DOCUMENTATION. Documentation used to show compliance with this code shall include but is not limited to,
construction documents, plans, specifications, builder or installer certification, inspection reports, or other methods
acceptable to the enforcing agency which demonstrate substantial conformance. When specific documentation or
special inspection is necessary to verify compliance, that method of compliance will be specified in the appropriate
section or identified applicable checklist.
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE
NONRESIDENTIAL MANDATORY MEASURES, SHEET 4 (July 2024 Supplement)
SECTION 5.505 INDOOR MOISTURE CONTROL
5.505.1 INDOOR MOISTURE CONTROL. Buildings shall meet or exceed the provisions of California Building Code,
CCR, Title 24, Part 2, Sections 1202 (Ventilation) and Chapter 14 (Exterior Walls). For additional measures, see
Section 5.407.2 of this code.
SECTION 5.506 INDOOR AIR QUALITY
5.506.1 OUTSIDE AIR DELIVERY. For mechanically or naturally ventilated spaces in buildings, meet the minimum
requirements of Section 120.1 (Requirements For Ventilation) of the California Energy Code, or the applicable local
code, whichever is more stringent, and Division 1, Chapter 4 of CCR, Title 8.
5.506.2 CARBON DIOXIDE (CO2) MONITORING. For buildings or additions equipped with demand control
ventilation, CO2 sensors and ventilation controls shall be specified and installed in accordance with the requirements
of the California Energy Code, Section 120(c)(4).
5.506.3 Carbon dioxide (CO2) monitoring in classrooms.
(DSA-SS) Each public K-12 school classroom, as listed in Table 120.1-A of the California Energy Code, shall be
equipped with a carbon dioxide monitor or sensor that meets the following requirements:
1.The monitor or sensor shall be permanently affixed in a tamper-proof manner in each classroom between 3 and
6 feet (914 mm and 1829 mm) above the floor and at least 5 feet (1524 mm) away from door and operable
windows.
2.When the monitor or sensor is not integral to an Energy Management Control System (EMCS), the monitor or
sensor shall display the carbon dioxide readings on the device. When the sensor is integral to an EMCS, the
carbon dioxide readings shall be available to and regularly monitored by facility personnel.
3.A monitor shall provide notification though a visual indicator on the monitor when the carbon dioxide levels in the
classroom have exceeded 1,100ppm. A sensor integral to an EMCS shall provide notification to facility
personnel through a visual and/or audible indicator when the carbon dioxide levels in the classroom have
exceeded 1,100ppm.
4.The monitor or sensor shall measure carbon dioxide levels at minimum 15- minute intervals and shall maintain a
record of previous carbon dioxide measurements of not less than 30 days duration.
5.The monitor or sensor used to measure carbon dioxide levels shall have the capacity to measure carbon dioxide
levels with a range of 400ppm to 2000ppm or greater.
6.The monitor or sensor shall be certified by the manufacturer to be accurate within 75ppm at 1,000ppm carbon
dioxide concentration and shall be certified by the manufacturer to require calibration no more frequently than
once every 5 years.
SECTION 5.507 ENVIRONMENTAL COMFORT
5.507.4 ACOUSTICAL CONTROL. Employ building assemblies and components with Sound Transmission Class
(STC) values determined in accordance with ASTM E 90 and ASTM E 413, or Outdoor-Indoor Sound Transmission
Class (OITC) determined in accordance with ASTM E 1332, using either the prescriptive or performance method in
Section 5.507.4.1 or 5.507.4.2.
Exception: Buildings with few or no occupants or where occupants are not likely to be affected by exterior
noise, as determined by the enforcement authority, such as factories, stadiums, storage, enclosed parking
structures and utility buildings.
Exception: [DSA-SS] For public schools and community colleges, the requirements of this section and all
subsections apply only to new construction.
5.507.4.1 Exterior noise transmission, prescriptive method. Wall and roof-ceiling assemblies exposed to
the noise source making up the building or addition envelope or altered envelope shall meet a composite STC
rating of at least 50 or a composite OITC rating of no less than 40, with exterior windows of a minimum STC of
40 or OITC of 30 in the following locations:
1. Within the 65 CNEL noise contour of an airport.
Exceptions:
1. Ldn or CNEL for military airports shall be determined by the facility Air Installation Compatible
Land Use Zone (AICUZ) plan.
2. Ldn or CNEL for other airports and heliports for which a land use plan has not been developed
shall be determined by the local general plan noise element.
2. Within the 65 CNEL or Ldn noise contour of a freeway or expressway, railroad, industrial source or
fixed-guideway source as determined by the Noise Element of the General Plan.
5.507.4.1.1. Noise exposure where noise contours are not readily available. Buildings exposed to a
noise level of 65 dB Leq - 1-hr during any hour of operation shall have building, addition or alteration
exterior wall and roof-ceiling assemblies exposed to the noise source meeting a composite STC rating of
at least 45 (or OITC 35), with exterior windows of a minimum STC of 40 (or OITC 30).
5.507.4.2 Performance Method. For buildings located as defined in Section 5.507.4.1 or 5.507.4.1.1, wall and
roof-ceiling assemblies exposed to the noise source making up the building or addition envelope or altered
envelope shall be constructed to provide an interior noise environment attributable to exterior sources that does
not exceed an hourly equivalent noise level (Leq-1Hr) of 50 dBA in occupied areas during any hour of operation.
5.507.4.2.1 Site Features. Exterior features such as sound walls or earth berms may be utilized as
appropriate to the building, addition or alteration project to mitigate sound migration to the interior.
5.507.4.2.2 Documentation of Compliance. An acoustical analysis documenting complying interior
soundlevels shall be prepared by personnel approved by the architect or engineer of record.
5.507.4.3 Interior sound transmission. Wall and floor-ceiling assemblies separating tenant spaces and tenant
spaces and public places shall have an STC of at least 40.
Note: Examples of assemblies and their various STC ratings may be found at the California Office of
Noise Control: www.toolbase.org/PDF/CaseStudies/stc_icc_ratings.pdf.
SECTION 5.508 OUTDOOR AIR QUALITY
5.508.1 Ozone depletion and greenhouse gas reductions. Installations of HVAC, refrigeration and fire suppression
equipment shall comply with Sections 5.508.1.1 and 5.508.1.2.
5.508.1.1 Chlorofluorocarbons (CFCs). Install HVAC, refrigeration and fire suppression equipment that do not
contain CFCs.
5.508.1.2 Halons. Install HVAC, refrigeration and fire suppression equipment that do not contain Halons.
5.508.2 Supermarket refrigerant leak reduction. New commercial refrigeration systems shall comply with the
provisions of this section when installed in retail food stores 8,000 square feet or more conditioned area, and that
utilize either refrigerated display cases, or walk-in coolers or freezers connected to remote compressor units or
condensing units. The leak reduction measures apply to refrigeration systems containing high-global-warming potential
(high-GWP) refrigerants with a GWP of 150 or greater. New refrigeration systems include both new facilities and the
replacement of existing refrigeration systems in existing facilities.
Exception: Refrigeration systems containing low-global warming potential (low-GWP) refrigerant with a GWP
value less than 150 are not subject to this section. Low-GWP refrigerants are nonozone-depleting refrigerants
that include ammonia, carbon dioxide (CO2), and potentially other refrigerants.
5.508.2.1 Refrigerant piping. Piping compliant with the California Mechanical Code shall be installed to be
accessible for leak protection and repairs. Piping runs using threaded pipe, copper tubing with an outside
diameter (OD) less than 1/4 inch, flared tubing connections and short radius elbows shall not be used in
refrigerant systems except as noted below.
5.508.2.1.1 Threaded pipe. Threaded connections are permitted at the compressor rack.
5.508.2.1.2 Copper pipe. Copper tubing with an OD less than 1/4 inch may be used in systems with a
refrigerant charge of 5 pounds or less.
5.508.2.1.2.1 Anchorage. One-fouth-inch OD tubing shall be securely clamped to a rigid base to
keep vibration levels below 8 mils.
5.508.2.1.3 Flared tubing connections. Double-flared tubing connections may be used for pressure
controls, valve pilot lines and oil.
Exception: Single-flared tubing connections may be used with a multiring seal coated with
industrial sealant suitable for use with refrigerants and tightened in accordance with manufacturer's
recommendations.
5.508.2.1.4 Elbows. Short radius elbows are only permitted where space limitations prohibit use of
long radius elbows.
5.508.2.2 Valves. Valves Valves and fittings shall comply with the California Mechanical Code and as
follows.
5.508.2.2.1 Pressure relief valves. For vessels containing high-GWP refrigerant, a rupture disc shall
be installed between the outlet of the vessel and the inlet of the pressure relief valve.
5.508.2.2.1.1 Pressure detection. A pressure gauge, pressure transducer or other device shall
be installed in the space between the rupture disc and the relief valve inlet to indicate a disc
rupture or discharge of the relief valve.
5.508.2.2.2 Access valves. Only Schrader access valves with a brass or steel body are
permitted for use.
5.508.2.2.2.1 Valve caps. For systems with a refrigerant charge of 5 pounds or more, valve caps
shall be brass or steel and not plastic.
5.508.2.2.2.2 Seal caps. If designed for it, the cap shall have a neoprene O-ring in place.
5.508.2.2.2.2.1 Chain tethers. Chain tethers to fit ovr the stem are required for valves
designed to have seal caps.
Exception: Valves with seal caps that are not removed from the valve during stem
operation.
5.508.2.3 Refrigerated service cases. Refrigerated service cases holding food products containing vinegar and
salt shall have evaporator coils of corrosion-resistant material, such as stainless steel; or be coated to prevent
corrosion from these substances.
5.508.2.3.1 Coil coating. Consideration shall be given to the heat transfer efficiency of coil coating to
maximize energy efficiency.
5.508.2.4 Refrigerant receivers. Refrigerant receivers with capacities greater than 200 pounds shall be fitted
with a device tha indicates the level of refrigerant in the receiver.
5.508.2.5 Pressure testing. The system shall be pressure tested during installation prior to evacuation and
charging.
5.508.2.5.1 Minimum pressure. The system shall be charged with regulated dry nitrogen and
appropriate tracer gas to bring system pressure up to 300 psig minimum.
5.508.2.5.2 Leaks. Check the system for leaks, repair any leaks, and retest for pressure using the same
gauge.
5.508.2.5.3 Allowable pressure change. The system shall stand, unaltered, for 24 hours with no more
than a +/- one pound pressure change from 300 psig, measured with the same gauge.
5.504.4.6 Resilient flooring systems. Where resilient flooring is installed, at least 80 percent of floor area
receiving resilient flooring shall meet the requirements of the California Department of Public Health,"Standard
Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using
Environmental Chambers," Version 1.2, January 2017 (Emission testing method for California Specifications
01350)
See California Department of Public Health's website for certification programs and testing labs.
https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx#material
5.504.4.6.1 Verification of compliance. Documentation shall be provided verifying that resilient flooring
materials meet the pollutant emission limits.
5.504.4.7 Thermal insulation
Comply with the requirements of the California Department of Public Health, "Standard Method of the Testing
and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers,
"Version 1.2, January 1.2, January 2017 (Emission testing method for California Specification 01350).
See California Department of Public Health's website for certification programs and testing labs.
https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx#material
5.504.4.7.1 Verification of compliance.
Documentation shall be provided verifying that thermal insulation materials meet the pollutant emission
limits.
5.504.4.8 Acoustical ceiling and wall panels.
Comply with the requirements of the California Department of Public Health, "Standard Method for the Testing
and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers, "
Version 1.2, January 2017 (Emission testing method for California Specification 01350).
See California Department of Public Health's website for certification programs and testing labs.
5.504.4.8.1 Verification of compliance. Documentation shall be provided verifying that acoustical
finish materials meet the pollutant emission limits.
5.504.5.3 Filters. In mechanically ventilated buildings, provide regularly occupied areas of the building with air
filtration media for outside and return air that provides at least a Minimum Efficiency Reporting Value (MERV) of
13. MERV 13 filters shall be installed prior to occupancy, and recommendations for maintenance with filters of
the same value shall be included in the operation and maintenance manual.
Exceptions: Existing mechanical equipment.
5.504.5.3.1 Labeling. Installed filters shall be clearly labeled by the manufacturer indicating the MERV
rating.
5.504.7 ENVIRONMENTAL TOBACCO SMOKE (ETS) CONTROL. Where outdoor areas are provided for smoking,
prohibit smoking within 25 feet of building entries, outdoor air intakes and operable windows and within the building as
already prohibited by other laws or regulations; or as enforced by ordinances, regulations or policies of any city,
county, city and county, California Community College, campus of the California State University, or campus of the
University of California, whichever are more stringent. When ordinances, regulations or policies are not in place, post
signage to inform building occupants of the prohibitions.
5.504.4.3.2 Verification. Verification of compliance with this section shall be provided at the request of
the enforcing agency. Documentation may include, but is not limited to, the following:
1. Manufacturer's product specification
2. Field verification of on-site product containers
5.504.4.4 Carpet Systems.
All carpet installed in the building interior shall meet the requirements of the California Department of Public
Health, "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor
Sources Using Environmental Chambers." Version 1.2, January 2017 (Emission testing method for California
Specifications 01350).
See California Department of Public Health's website for certification programs and testing labs.
https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx#material
5.504.4.4.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the
requirements of the California Department of Public Health,"Standard Method for the Testing and
Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental
Chambers,"Version 1.2, January 2017 (Emission testing method for California Specifications
01350).
See California Department of Public Health's website for certification programs and testing labs.
https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx#material
5.504.4.4.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 5.504.4.1.
DISCLAIMER:THIS DOCUMENT IS PROVIDED AND INTENDED TO BE USED AS A MEANS TO INDICATE AREAS OF COMPLIANCE WITH THE CALIFORNIA GREEN BUILDING STANDARDS (CALGREEN) CODE. DUE TO THE VARIABLES BETWEEN BUILDING DEPARTMENT JURISDICTIONS, THIS CHECKLIST IS TO BE USED ON AN INDIVIDUAL PROJECT BASIS AND MAY BE MODIFIED BY THE END USER TO MEET THOSE INDIVIDUAL NEEDS. THE END USER ASSUMES ALL RESPONSIBILITY ASSOCIATED WITH THE USE OF THIS DOCUMENT, INCLUDING VERIFICATION WITH THE FULL CODE.
Y N/A Y N/A Y N/A Y N/ARESPON.
PARTY
RESPON.
PARTY
RESPON.
PARTY
RESPON.
PARTY
Y = YES
N/A =NOT APPLICABLE
RESPON. PARTY =RESPONSIBLE PARTY (ie: ARCHITECT, ENGINEER,
OWNER, CONTRACTOR, INSPECTOR ETC.)
TABLE 5.504.4.3 - VOC CONTENT LIMITS FOR ARCHITECTURAL
COATINGS2,3
GRAMS OF VOC PER LITER OF COATING, LESS WATER & LESS EXEMPT COMPOUNDS
COATING CATEGORY CURRENT VOC LIMIT
FLAT COATINGS 50
NONFLAT COATINGS 100
NONFLAT HIGH GLOSS COATINGS 150
Y
Y
Y
Y
Y
Y
Y
Y
GR-4
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
GR
E
E
N
C
O
D
E
-
1
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
7 / 6 / 2025
EXIST'G GROUND
3P
200A
M
120/208V, 3Ø,4W
A
(E)
(E)
EXIST'G "MS"
SINGLE LINE DIAGRAM
200A
SCOPE OF WORK
.%
E-1
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
7 / 6 / 2 0 2 5
GE
N
E
R
A
L
N
O
T
E
S
,
L
E
G
E
N
D
,
E
Q
U
I
P
M
E
N
T
S
C
H
E
D
U
L
1
SI
N
G
L
E
L
I
N
E
D
I
A
G
R
A
M
&
S
I
T
E
P
L
A
N
-
-
2
GM DESIGN SERVICE INC.
SITE PLAN
N.T.S.
N
JOB SITE
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
1 PICK UP COUNTER CUSTOM MADE
1 POST STATION CASH REGISTER BY OWNER 120 3
EQUIPMENT SCHEDULE
15
16
11
13
14
12
10
9
8
7
6
5
4
2
3
DESCRIPTIONITEMQTY
ELECTRICAL
PH
EQUIPMENT
MFG. & MODEL VOLT
PLUMBING
HWKWAMPHPCW W GAS BTU1000 REMARK
1
17
18
1 AIR CURTAIN W/ MICRO SWITCH "MARS" MODEL#STD2 115 4.3 1/2 1600 FPM MIN.
1 3 COMPARTMENT SINK STEELTON 57"-18x18x12 1/2"~1/2"~2"~
1 LOCKER (12"x15"x5'H)STANDARD METAL LOCKER (NSF)
1 WORKING TABLE REGENCY, 30x48
1 ICE MAKER MANITOWOC, RNS-0244 115 1 10 1/2"~F/S
1 PREP. TABLE TURBO AIR, MST-48-N 115 1 4.4
19
20
21
22
23
24
1 WATER HEATER (70 GAL.)AMERICAN STANDARD, #CG-32-55T60 -1"1"F/S 3/4"60,000
1 (E) MOP-SINK W/ MOP RACK, W/BACK WATER PREVENT DEVICE "EAGLE" #F1916 1/2"~1/2"~2"~
1 (E) WALL MOUNT HAND SINK W/ SOAP & PAPER TOWEL DISPENSER, W/SPLASH GUAEDS "EAGLE" HSA-10-F 1/2"~1/2"~2"~
1 4 OPEN BURNER IMPERIAL, #IR-4 1"155,000
1 DEEP FRYER FRYMASTER, GF14 3/4"100,000
1 (E) PREP. SINK STEELTON 38 3/4" 1/2"1/2"F/S
1 WALL SHELF REGENCY, 18x60
2 POT RANGE BLUEAIR, BLSP1 -1"1"3/4"80,000
1 HOOD 9'x48 CUSTOM MADE, NSF TYPE -I
1 CHINESE WOK RADIANCE, TAWR 3/4"12,500
2 WORK TOP FREEZER BLUEAIR, BLUR48-HC 115 1 360 3
1 HOOD FIRE EXTINGUISHING SYSTEM BY FIRE PROTECT COMPANY
1 2 DOOR FREEZER TRUE, TS-35F 115 1 12.4
1 GREASE TRAP WATTS, WD-50
1 SBEEZE GUARDS CUSTOM MADE
1 TABLE CUSTOM MADE
S
DISCONNECT SWITCH
CONNECT TO SIGN
VIA ACCESSIBLE
CEILING MTD (TYP.)
SHOW WINDOW RECEPTACLE
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
WP
ON ROOF
pr
i
m
a
r
y
d
a
y
l
i
g
h
t
zo
n
e
se
c
o
n
d
a
r
y
d
a
y
l
i
g
h
t
zo
n
e
GFCI
WP
ON ROOF
"A"
S
S
Sa
b
Sc
d
POWER PLAN
SCALE: 1/4"=1'-0"
LIGTHING PLAN
SCALE: 1/4"=1'-0"
E-2
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
7 / 6 / 2 0 2 5
PO
W
E
R
P
L
A
N
A
N
D
L
I
G
H
T
I
N
G
P
L
A
N
1
-
-
2
GM DESIGN SERVICE INC.
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
LIGHTING SHUT OFF CONTROL DIAGRAM
7771 GARVEY AVE. #C
ROSEMEAD, CA 91770 626-327-4505
7771 GARVEY AVE. #C
ROSEMEAD, CA 91770
GM DESIGN SERVICE INC.
626-327-4505
55 E DURATE RD. #103
55 E DURATE RD. #103
E-3
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
7 / 6 / 2 0 2 5
TI
T
L
E
-
2
4
F
O
R
M
S
1
-
-
2
GM DESIGN SERVICE INC.
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
JOB SITE
LC
/Ä
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
7 / 6 / 2 0 2 5
1
)'0'4#.016'
ME
C
H
A
N
I
C
A
L
S
Y
M
B
O
L
S
,
LE
G
E
N
D
,
N
O
T
E
S
,
&
S
C
H
E
D
U
L
E
S
SITE PLAN
N.T.S.
GM DESIGN SERVICE INC.
DESCRIPTION
MECHANICAL EQUIPMENT SCHEDULE
NOTE:
An air balance test will be required to verify the minimum volumeof
outside air to comply with the T-24 calculations, before the final approval
of this project.
NOTE:
A performance test will be required to verify the rate of airflow and the
proper operation of the exhaust and make-up air for kitchen hood system
before the final approval of this installation
(2022 CMC Section 511.2.2.1).
ROOF ACCESS LADDER
EXHAUST FAN
ELECTRICAL: 208V, 3PH, 6.2A, 1500W, 2HP
UNIT OPERATING WEIGHT = 300 LBS.
UNIT SHALL EXHAUST 2700 CFM @ 0.5" ESP. RPM 625
TAG,FANS, LAU,MODEL#FGP15-9A
INTERLOCKED WITH "MUA-1"FOR HOOD-1
MAKE UP AIR
ELECTRICAL: 120V, 1PH, 0.7 AMPS, 1/3HP
UNIT SHALL BE INTERLOCKED WITH "EF-1"
UNIT SHALL SHALL PROVIDE 2700 CFM @ 0.1" ESP. 420 RMP
ESSICK AIR, MODEL#N40/45S
UNIT APPROX. WEIGHT = 200 LBS.
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
9-
5
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
R10'-0
"
PARTIAL ROOF PLAN
SCALE: 1/4"=1'-0"
CEILING PLAN
SCALE: 1/4"=1'-0"
NOTE:
FLOOR PLAN
SCALE: 1/4"=1'-0"
9'-
0
"
4'-3"
M-2
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
5 / 16 / 2 0 2 5
1 2
GM DESIGN SERVICE INC.
ME
C
H
A
N
I
C
A
L
F
L
O
O
R
P
L
A
N
ME
C
H
A
N
I
C
A
L
R
O
O
F
P
L
A
N
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
1 PICK UP COUNTER CUSTOM MADE
1 POST STATION CASH REGISTER BY OWNER 120 3
EQUIPMENT SCHEDULE
15
16
11
13
14
12
10
9
8
7
6
5
4
2
3
DESCRIPTIONITEMQTY
ELECTRICAL
PH
EQUIPMENT
MFG. & MODEL VOLT
PLUMBING
HWKWAMPHPCW W GAS BTU1000 REMARK
1
17
18
1 AIR CURTAIN W/ MICRO SWITCH "MARS" MODEL#STD2 115 4.3 1/2 1600 FPM MIN.
1 3 COMPARTMENT SINK STEELTON 57"-18x18x12 1/2"~1/2"~2"~
1 LOCKER (12"x15"x5'H)STANDARD METAL LOCKER (NSF)
1 WORKING TABLE REGENCY, 30x48
1 ICE MAKER MANITOWOC, RNS-0244 115 1 10 1/2"~F/S
1 PREP. TABLE TURBO AIR, MST-48-N 115 1 4.4
19
20
21
22
23
24
1 WATER HEATER (70 GAL.)AMERICAN STANDARD, #CG-32-55T60 -1"1"F/S 3/4"60,000
1 (E) MOP-SINK W/ MOP RACK, W/BACK WATER PREVENT DEVICE "EAGLE" #F1916 1/2"~1/2"~2"~
1 (E) WALL MOUNT HAND SINK W/ SOAP & PAPER TOWEL DISPENSER, W/SPLASH GUAEDS "EAGLE" HSA-10-F 1/2"~1/2"~2"~
1 4 OPEN BURNER IMPERIAL, #IR-4 1"155,000
1 DEEP FRYER FRYMASTER, GF14 3/4"100,000
1 (E) PREP. SINK STEELTON 38 3/4" 1/2"1/2"F/S
1 WALL SHELF REGENCY, 18x60
2 POT RANGE BLUEAIR, BLSP1 -1"1"3/4"80,000
1 HOOD 9'x48 CUSTOM MADE, NSF TYPE -I
1 CHINESE WOK RADIANCE, TAWR 3/4"12,500
2 WORK TOP FREEZER BLUEAIR, BLUR48-HC 115 1 360 3
1 HOOD FIRE EXTINGUISHING SYSTEM BY FIRE PROTECT COMPANY
1 2 DOOR FREEZER TRUE, TS-35F 115 1 12.4
1 GREASE TRAP WATTS, WD-50
1 SBEEZE GUARDS CUSTOM MADE
1 TABLE CUSTOM MADE
1
1
9-
5
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
NOTES ;
1. KITCHEN HOOD EXHAUST DUCT BE
EQUIPPED WITH TIGHT-FITTING
CLEAN-OUT DOORS WHERE
NECESSARY FOR MAINTENANCE. (UMC
2002-c)
2. ACCESS OPENING TO THE
CLEAN-OUT MUST HAVE A FIRE RATED
EQUAL TO SHAFT. (UMC 2002o)
3. ALL COOKING EQUIPMENT MUST
HAVE MIN. 6" HEIGHT NSF LEGS. OR 4"
HEIGHT CONTINUOUSLY COVED BASE.
OR ON APPROVED CASTERS.
4. SCREEN REQUIRED (PER BUILDING CODE)
EXHAUST OUT LETS ; SHALL BE AT
LEAST 40" MIN. ABOVE THE ROOF
SURFACE, AT LEAST 10'-0" FROM
PARTS OF THE SAME OR CONTIGUOUS
BUILDINGS, ADJACENT PROPERTY LINE
OR AIR INTAKE OPENING INTO ANY
BUILDING AND SHALL BE LOCATED AT
LEAST 10'-0" ABOVE THE ADJOINING
GRADE LEVEL.
THE MAX. TOTAL DEVELOPED LENGTH
OF THE DUCT OR FITTING MEASURED
ALONG THE CENTER LINE SHALL NOT
EXCEED 3 TIME THE VERTICAL
DIMENSION OF THE FAN OUTLET.
5. THE SURFACE OF THE GREASE DUCT
SHALL BE CONTINUOUSLY COVERED ON
ALL SIDES FROM THE POINT AT WHICH THE
FIELD APPLIED OR FACTORY BUILT
ENCLOUSURE PENETRATES A CEILING,
WALL OR FLOOR TO THE OUTLET
TERMINAL.
6. DUCTS AT EXTERIOR LOCATION SHALL
BE PROTECTED ON THE EXTERIOR BY
PAINT OR OTHER SUITABLE
WEATHER-PROTECTIVE COATING OR BE
CONSTRUCTED OF STAINLESS STEEL.
SECTION OF EXHAUST HOOD,DUCT
BLOWER & MAKE-UP AIR SYSTEM(N.T.S.)
EXHAUST
FAN
10'-0" MIN.
HORIZONTAL DUCT SYSTEM SHALL
SLOPE NOT LESS THAN 1/4" PER
LINEAL FEET.
MAKE-UP AIR. UNIT SIDE
DISCHARGE
REMOVEABLE COVER
RAIN CAP
VENT TO ATMOSPHERE
WELDED STEEL
ANGLE SUPPORT
METAL STUD
16 GAUGE GALV. ANGLE 2"X2"
BRACE TO ROOF JOIST 26
G
A
U
G
E
GA
L
V
.
D
U
C
T
.
2'
-
0
"
MI
N
.
BL
O
W
E
R
ST
A
N
D
ROOF
24" X 24"
DIFFUSER
STAINLESS STEEL HOOD SHALL BE
CONSTRUCTED OF AT LEAST 24
GAUGE STAINLESS STEEL.
3" MIN. AIR SPACE
6" MIN. BEYOND THE EDGE OF THE
COOKING SURFACE ON ALL OPEN
SIDE.
FLOOR OR BASE FINISH FOLLOW THE
ROOM FINISH SCHEDULE & HEALTH
DEPT. REQUIREMENT.
FOLLOW ALL EQUIPMENT
INSTALLATION INSTRUCTION FOR
COMBUSTIBLE BUILDING
INSTALLATION SPACE
REQUIREMENT.
4'
-
0
"
M
A
X
.
6'
-
6
"
M
I
N
.
7
'
-
0
"
M
A
X
.
10
'
-
0
"
5'
-
0
"
28
1
/
4
"
USE FIRE FIREMASTER
GREASE DUCT WRAP
WITH 3M.
4"
3' H EXTENSION ABOVE TOP OF
HAVC UNIT
HOOD SUB WILL
FABRICATE A SHEET
METAL TO COVER THE
OPENING
SEE
DETAIL#2
SEE
DETAIL#2PLATE FORMPLATE FORM
PLATE FORM
TEE BAR CEILING
18" MIN. FIRE RATE CEILING ON HOOD
OPEN SIDE. 5/8" GYP BOARD TYPE "X"
THICKNESS OF HOOD( MIN. 18 GAGE
CARBON STEEL OR 20 GAGE
STAINLESS STEEL)
TEE BAR CEILING
FRONT SECTION OF EXHAUST HOOD
14
N.T.S.
3'
-
6
"
6'
-
0
"
3'
-
6
"
15
'
10
'
1212
5'
15 17
9'
M-3
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
7 / 6 / 2 0 2 5
1 2
GM DESIGN SERVICE INC.
ME
C
H
A
N
I
C
A
L
H
O
O
D
D
E
T
A
I
L
S
Provide an 18” clearance to combustible material for the same distance.
NOTE:The wrap shall extend from 18” below any combustible wood joist to a point 18” above the surface of roof covering
NOTE:
Hoods, filters, exhaust fans, and ducts shall have a
clearance of at least 18” to combustible
materials, 3” to limited combustibles materia
material. (2022 CMC Section 507.4).
NOTE:
Grease duct rated enclosure shall be vented to the
exterior throughweather protected openings.
NOTE:
All interior surfaces of the exhaust system shall be
reasonably accessible for cleaning and
inspection purposes (2022 CMC, Section 507.2).
NOTE:
The make-up air quantity shall prevent negative
pressures in the commercial cooking area(s) from
exceeding 0.02 inch water column. Where the fire
extinguishing system activates, make-up air
supplied internally to a hood shall be shut-off. ( 2022
CMC, Section 511.3. )
NOTE:
Cooking equipment type used under the Type I hood shall be
indicated or specified. SEE equiment schedule on M-4.
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
9-
5
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
1
NOTES ;
1.HOODS ARE BUILT IN ACCORDANCE WITH
NFPA 96, NSF SPECIFICATIONS AND
CONFORMS TO THE U.L. 710 STANDARDS.
2.HOODS ARE CONSTRUCTED OF 18 GAUGE
STEEL.
3.GREASE FILTERS ARR 16" BAFFLE TYPE
4.GREASE TROUGH IS MADE TO RECEIVE
GRREASE EXTRACTED BY THE FILTER
5.EACH GREASE TROUGH IS EQUIPED WITH
A STAINLESS STEEL CUP
ACTUAL DIMENSIONS
19-5/8" x 19-5/8" x 1-7/8"
19-5/8" x 15-5/8" x 1-7/8"
15-5/8" x 19-5/8" x 1-7/8"
15-5/8" x 15-5/8" x 1-7/8"
FILTER INFORMATION
Region 86
20 x 20
16 x 20
16 x 16
20 x 16
NOM. SIZE
(H x W)(FPM)
2.28 11
1.78
1.39
1.78
9.1
7.4
8.9
(SQ. FEET)
FREE AREA
(H x W x D)(LBS)
WEIGHT
100 0.25
0.45
0.75
0.35
150
175
125
STATIC PRESSURE
(WATER GAUGE)
VELOCITY
SOUTHERN CALIFORNIA OFFICE
TUSTIN, CA 92780
PHONE: (714) 957-1500
EMAIL: SOCAL@CAPTIVEAIRE.COM
FOR QUESTIONS, CALL THE
HANGING ANGLE
THROUGH ANOTHER
CONNECTED TO ROOF JOIST
1/2" DIA. ALL THREAD ROD
AND WASHER - ONE ABOVE
1/2" DIA. HEAVY DUTY NUT
AND ONE BELOW HANGING ANGLE
ROD, NUTS, AND WASHERS TO BE SUPPLIED BY INSTALLING CONTRACTOR
CORNER HANGING ANGLE DETAIL ND-2
HANGING ANGLE IS PRE-PUNCHED AT FACTORY
STEEL HANGING ANGLE
3002 DOW AVE., SUITE 410
CAPTRATE
CAPTIVEAIRE
CAPTRATE & KLEEN-GARD FILTERS
ARE BUILT IN COMPLIANCE WITH
INT. MECH. CODE (IMC)
UL STANDARD #1046
NSF STANDARD #2
NFPA #96
UL 710 & ULC710 STANDARDS
E.T.L. LISTED 3054804-001
CAPTIVE-AIRE HOODS ARE
BUILT IN COMPLIANCE WITH
NFPA #96
ACTUAL DIMENSIONS
19-5/8" x 19-5/8" x 1-7/8"
19-5/8" x 15-5/8" x 1-7/8"
15-5/8" x 19-5/8" x 1-7/8"
15-5/8" x 15-5/8" x 1-7/8"
(FPM)
2.28
1.78
1.39
1.78
(SQ. FEET)
FREE AREA
(H x W x D)(LBS)
WEIGHT
100
150
175
125
STATIC PRESSURE
(WATER GAUGE)
VELOCITY
10
12
12
15
1.20
0.90
0.70
0.5020 x 20
16 x 20
16 x 16
20 x 16
NOM. SIZE
(H x W)
ACTUAL DIMENSIONS
19-5/8" x 19-5/8" x 1-7/8"
19-5/8" x 15-5/8" x 1-7/8"
15-5/8" x 19-5/8" x 1-7/8"
15-5/8" x 15-5/8" x 1-7/8"
(FPM)
2.23
1.73
1.35
1.73
(SQ. FEET)
FREE AREA
(H x W x D)(LBS)
WEIGHT
100
150
175
125
STATIC PRESSURE
(WATER GAUGE)
VELOCITY
20 x 20
16 x 20
16 x 16
20 x 16
NOM. SIZE
(H x W)
GREASE-STOP SOLO
FILTER INFORMATION
CAPTRATE
GREASE-STOP COMBO
FILTER INFORMATION
KLEEN-GARD
SS BAFFLE TYPE
11
9.1
7.4
8.9
0.10
0.20
0.25
0.15
Important Notes: Engineered Plans Above Are For New Construction or T.I. Only -
M-4
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
7 / 6 / 2 0 2 5
1 2
GM DESIGN SERVICE INC.
ME
C
H
A
N
I
C
A
L
H
O
O
D
D
E
T
A
I
L
S
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
9-
5
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
1
M-5
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
7 / 6 / 2 0 2 5
1 2
GM DESIGN SERVICE INC.
ME
C
H
A
N
I
C
A
L
E
X
H
A
U
S
T
F
A
N
&
M
U
A
D
E
T
A
I
L
S
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
M-6
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
7 / 6 / 2 0 2 5
1 2
GM DESIGN SERVICE INC.
ME
C
H
A
N
I
C
A
L
T
-
2
4
F
O
R
M
S
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
M-7
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
7 / 6 / 2 0 2 5
1 2
GM DESIGN SERVICE INC.
ME
C
H
A
N
I
C
A
L
T
-
2
4
F
O
R
M
S
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
LEGEND & ABBREVIATIONS
LEGEND & ABBREVIATIONS
DOMESTIC WATER CALCULATION
DOMESTIC WATER PIPING SIZING
DRAWING INDEXGENERAL NOTES GENERAL NOTES
NOTES
P-1
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
1
PL
U
M
B
I
N
G
S
Y
M
B
O
L
S
,
L
E
G
E
N
D
,
N
O
T
E
S
,
&
S
C
H
E
D
U
L
E
S
FIXTURE UNIT
2
FIXTURE CONNECTION SCHEDULE (BRANCH SIZES)
MISC. EQUIPMENT SCHEDULE
GM DESIGN SEVEICE INC.
7 / 6 / 2025
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
9-
2
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
LC
FLOOR PLAN(GAS)
SCALE: 1/4"=1'-0"
TDL: 100'
FLOOR PLAN(HOT & COLD WATER)
SCALE: 1/4"=1'-0"
FLOOR PLAN(WASTE & VENT)
SCALE: 1/4"=1'-0"
19
'
-
9
"
8'-4"
TABLE 12-8 (GAS PIPING SIZING)
SCHEDULE 40 METALLIC PIPE [NFPA 54: TABLE 6.2(b)]
1ST FLOOR
2ND FLOOR
2Ä
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
1
SITE PLAN
N.T.S.
2
SI
T
E
P
L
A
N
&
F
L
O
O
R
P
L
A
N
(
H
O
T
&
C
O
L
D
W
A
T
E
R
)
JOB SITE
GM DESIGN SEVEICE INC.
7 / 6 / 2025
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
)#54+5'4&+#)4#/
065
9-
2
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
1
1
3
9-
1
6
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
P-3
Sc
a
l
e
Ch
e
c
k
e
d
b
y
De
s
i
g
n
e
r
b
y
Pr
o
j
e
c
t
N
o
.
Dr
a
w
n
b
y
SHEET NO.
SH
E
E
T
T
i
t
l
e
DATE:
:::::
N.
G
.
Da
t
e
Re
v
i
s
i
o
n
s
Z.
J
.
-
-
-
PL
U
M
B
I
N
G
D
E
T
A
I
L
S
1 2
GM DESIGN SEVEICE INC.
7 / 6 / 2025
RU
Y
I
C
A
T
I
N
G
L
L
C
.
TE
N
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
55
E
D
U
R
A
T
E
R
D
.
#
1
0
3
AR
C
A
D
I
A
,
C
A
9
1
0
0
6
(6
2
6
)
-
2
5
4
-
5
6
8
5
9-
2
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
1
Grease trap installation detail
3
2
3
9-
1
6
-
2
0
2
5
CO
R
R
E
C
T
I
O
N
3
9-
2
6
-
2
0
2
5
CO
R
R
E
C
T
I
O
N