HomeMy WebLinkAboutItem 8f - Centennial Way Traffic Signal Improvements Project
STAFF REPORT
PUBLIC WORKS SERVICES DEPARTMENT
DATE: August 18, 2026
TO: Honorable Mayor and City Council
FROM: Paul Cranmer, Assistant City Manager/Public Works Services Director
Kevin Merrill, City Engineer/Deputy Public Works Services Director
By: Cong Chen, Assistant Engineer
SUBJECT: CONTRACT WITH DBX INC. FOR THE CENTENNIAL WAY TRAFFIC SIGNAL
IMPROVEMENTS PROJECT IN THE AMOUNT OF $719,065, WITH A 10%
CONTINGENCY
CEQA: Exempt
Recommendation: Approve
SUMMARY
The Fiscal Year 2024–25 Capital Improvement Program (“CIP”) Budget includes
funding for the Centennial Way Traffic Signal Improvements Project, which will
convert the existing unsignalized intersections at Centennial Way with eastbound
and westbound Huntington Drive into fully signalized intersections. The project
includes the installation of Advanced Traffic Controller (“ATC”) cabinets, traffic signal
poles, vehicular and pedestrian signal heads, pedestrian push buttons, conduits, pull
boxes, Closed-Circuit Television (“CCTV”) and video detection cameras, loop
detectors, and related traffic signal infrastructure to enhance public safety and
improve traffic operations along the Huntington Drive corridor. A formal competitive
bidding process was conducted to obtain the most responsive and cost-effective
proposal, and DBX Inc. was determined to be the lowest responsive and responsible
bidder.
It is recommended that the City Council approve, authorize, and direct the City
Manager to execute a contract with DBX Inc. for the Centennial Way Traffic Signal
Improvements Project in the amount of $719,065 and authorize a construction
contingency in the amount of 10%.
Centennial Way Traffic Signal Improvements Project
August 18, 2026
Page 2 of 4
BACKGROUND
The Centennial Way and El Monte Avenue Traffic Signal Improvements Project is
included in the City’s adopted CIP and was programmed in Fiscal Year 2024–25 to
improve safety, reduce vehicle delay, and enhance traffic operations at four existing
unsignalized intersections. Due to increasing vehicle, pedestrian, and bicycle
volumes, these intersections were identified in the City’s 2016 Traffic Impact Fee
Report as approaching the thresholds for signalization. Traffic engineering studies
subsequently determined that each of the following intersections satisfies at least
one signal warrant established by the California Manual on Uniform Traffic Control
Devices (“CA MUTCD”):
• Centennial Way at Eastbound Huntington Drive
• Centennial Way at Westbound Huntington Drive
• El Monte Avenue at Duarte Road
• El Monte Avenue at Campus Drive
To optimize project delivery, funding, and construction sequencing, the overall
project has been divided into two phases, with the Centennial Way traffic signal
improvements proceeding first. This phase includes the installation of new traffic
signals, roadway improvements, and Americans with Disabilities Act (“ADA”)
accessibility upgrades at the intersections of Centennial Way with eastbound and
westbound Huntington Drive. These intersections provide critical access to regional
destinations, including Santa Anita Park, Arcadia City Hall, the Arcadia Police
Department, and USC Arcadia Hospital.
The second phase, consisting of traffic signal improvements at El Monte Avenue and
Duarte Road and El Monte Avenue and Campus Drive, is scheduled to begin next
summer following completion of the Arcadia Unified School District's ongoing
construction activities. Sequencing the work in this manner will minimize disruptions
to Arcadia High School students, parents, faculty, and daily school traffic while
improving overall construction efficiency.
Advancing the Centennial Way improvements at this time is particularly important as
Santa Anita Park has been designated as the venue for equestrian events during the
2028 Summer Olympic Games. Completing these improvements will enhance traffic
operations and safety for current travel demand, accommodate anticipated
Centennial Way Traffic Signal Improvements Project
August 18, 2026
Page 3 of 4
increases in traffic during the Olympic Games, and support future growth. The
project will improve circulation, enhance access for residents, visitors, and
emergency responders, and provide long-term mobility and operational benefits to
the community.
DISCUSSION
In accordance with City Council Resolution No. 7483, a Notice Inviting Bids was
published and bid documents were made available to qualified contractors
specializing in this type of work. On July 2, 2026, the City Clerk received six sealed
bids, which were opened and publicly read. The bid results are summarized below:
Rank CONTRACTOR Location AMOUNT
1. DBX Inc. Temecula $ 719,065
2. California Professional Engineering Inc. La Puente $ 744,837
3. Select Electric, Inc. Anaheim $ 765,977
4. Crosstown Electrical & Data, Inc. Irwindale $ 778,937
5. Baker Electric & Renewable LLC. Escondido $ 782,960
6. Servitek Electric, Inc. Norwalk $ 946,832
All bid proposals were reviewed for responsiveness, and the qualifications,
experience, and recent project history of the apparent low bidder were evaluated.
Based on this review, DBX Inc. has been determined to be the lowest responsive and
responsible bidder. The firm has successfully completed similar traffic signal
improvement projects for several public agencies, including the Cities of Monrovia,
El Centro, El Cajon, Oceanside, and Desert Hot Springs, demonstrating the
experience and qualifications necessary to successfully complete the proposed work.
ENVIRONMENTAL ANALYSIS
The proposed project is categorically exempt from the California Environmental
Quality Act (“CEQA”) pursuant to CEQA Guidelines Sections 15301 (Class 1 – Existing
Facilities), 15302 (Class 2 – Replacement or Reconstruction), and 15303 (Class 3 – New
Construction or Conversion of Small Structures). The project consists of
improvements to existing roadway facilities, including the replacement and
installation of traffic signal infrastructure and related appurtenances, without
expanding the existing use or capacity of the roadway.
Centennial Way Traffic Signal Improvements Project
August 18, 2026
Page 4 of 4
FISCAL IMPACT
A total of $1,200,000 was appropriated in the Fiscal Year 2024–25 CIP Budget for the
Centennial Way and El Monte Avenue Traffic Signal Improvements Project. To
minimize project costs and mitigate anticipated long lead times for specialized
equipment, the City procured traffic signal cabinets, poles and mast arms, and
Intelligent Transportation Systems (“ITS”) equipment under a separate Purchase
Order. In addition, curb ramp design services have been completed. Total project
expenditures to date are $264,796.77, leaving an available balance of $935,203.23.
The contract amount for the Centennial Way Traffic Signal Improvements Project is
$719,065. Including the recommended 10% construction contingency, the total
authorized amount would be $790,971.50. Sufficient funds are available to support
the contract award and contingency.
An additional funding appropriation for the second phase of this project will be
requested when the second phase of the project is awarded.
RECOMMENDATION
It is recommended that the City Council determine that this project is exempt under
the California Environmental Quality Act (“CEQA”); and approve, authorize, and direct
the City Manager to execute a contract with DBX Inc. for the Centennial Way Traffic
Signal Improvements Project in the amount of $719,065, with a 10% contingency.
Attachments: Exhibit “A” – Project Location Map
Proposed Contract
CITY OF ARCADIA
CENTENNIAL WAY
TRAFFIC SIGNAL IMPROVEMENTS
PROJECT NO. 41852625
BETWEEN
CITY OF ARCADIA
AND
DBX, INC.
CONTRACT
CONTRACT
This CONTRACT, No. ________ is made and entered into this ____ day of _________________,
2026, by and between City of Arcadia, sometimes hereinafter called “City,” and DBX, INC.,
sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these
presents do covenant and agree with each other as follows:
a. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in
the Contract, and shall provide all labor, materials, equipment, tools, utility services, and
transportation to complete all of the Work required in strict compliance with the Contract
Documents as specified in Article 5, below, for the following Project:
CENTENNIAL WAY TRAFFIC SIGNAL IMPROVEMENTS / PROJECT NO. 41852625
The Contractor and its surety shall be liable to the City for any damages arising as a result of
the Contractor’s failure to comply with this obligation.
b. TIME FOR COMPLETION. Time is of the essence in the performance of the Work. The
Work shall be commenced on the date stated in the City’s Notice to Proceed. The Contractor shall
complete all Work required by the Contract Documents within 120 calendar days from the
commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor
agrees the time for completion set forth above is adequate and reasonable to complete the Work.
c. CONTRACT PRICE. The City shall pay to the Contractor as full compensation for the
performance of the Contract, subject to any additions or deductions as provided in the Contract
Documents, and including all applicable taxes and costs, the sum of SEVEN HUNDRED
NINETEEN THOUSAND, SIXTY-FIVE DOLLARS AND NO CENTS ($719,065.00). Payment
shall be made as set forth in the General Conditions.
d. LIQUIDATED DAMAGES. In accordance with Government Code section 53069.85, it is
agreed that the Contractor will pay the City the sum set forth in Section 00 73 13, Article 1.11 for
each and every calendar day of delay beyond the time prescribed in the Contract Documents for
finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is
not paid, the Contractor agrees the City may deduct that amount from any money due or that may
become due the Contractor under the Contract. This Article does not exclude recovery of other
damages specified in the Contract Documents.
e. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents” include the
following:
Notice Inviting Bids
Instructions to Bidders
Bid Form
Bid Bond
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor Registration Certification
Performance Bond
Payment (Labor and Materials) Bond
General Conditions
Special Conditions
Technical Specifications
Addenda
Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition, Except
Sections 1-9
Applicable Local Agency Standards and Specifications, as last revised
Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract
The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. This Contract shall
supersede any prior agreement of the parties.
f. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE. Each and
every provision of law required to be included in these Contract Documents shall be deemed to
be included in these Contract Documents. The Contractor shall comply with all requirements of
applicable federal, state and local laws, rules and regulations, including, but not limited to, the
provisions of the California Labor Code and California Public Contract Code which are applicable
to this Work.
g. INDEMNIFICATION. Contractor shall provide indemnification and defense as set forth in
the General Conditions.
h. PREVAILING WAGES. Contractor shall be required to pay the prevailing rate of wages
in accordance with the Labor Code which such rates shall be made available at the City’s
Administrative Office or may be obtained online at http://www.dir.ca.gov and which must be
posted at the job site.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on
the day and year above written.
CITY OF ARCADIA
By:
Dominic Lazzaretto
City Manager
[INSERT CONTRACTOR'S NAME]
By:
Signature
Print Name and Title
Attest:
By:
City Clerk
By:
Signature
Print Name and Title
Approved as to Form:
Michael J. Maurer
City Attorney
(CONTRACTOR’S SIGNATURE MUST BE NOTARIZED AND CORPORATE SEAL AFFIXED)
END OF CONTRACT