SUMMARY
The Public Works Services Department's (“PWSD”) Water Supply Well Inspection and
Rehabilitation Program provides preventive maintenance for the City's 10 active
water supply wells through scheduled video inspections and rehabilitation every 7 to
10 years to maintain performance and minimize the risk of mechanical failure. Peck
Well is scheduled for rehabilitation under this program. Following a formal
competitive bidding process, General Pump Company, Inc. submitted the lowest
responsive bid, ensuring competitive pricing and quality service.
It is recommended that the City Council approve and authorize the City Manager to
execute a contract with General Pump Company, Inc. for the Peck Well Inspection
and Rehabilitation Project in the amount of $417,540, with a 10% contingency.
BACKGROUND
The City operates and maintains 10 groundwater wells that produce approximately
14,000 acre-feet of water annually. Regular inspection and maintenance are essential
to maintaining well efficiency, maximizing production capacity, and reducing the risk
of unexpected failures.
Award Inspection and Rehabilitation of Peck Well Project
August 18, 2026
Page 2 of 3
The American Water Works Association (“AWWA”) recommends preventative
maintenance of water supply wells every 7 to 10 years, including removal of the well
pump assembly, video inspection of the well casing, and evaluation of pump
components. The PWSD follows these guidelines through its Water Supply Well
Inspection and Rehabilitation Program, prioritizing one to two wells annually based
on inspection history, maintenance records, and well efficiency.
The program schedule includes the inspection and rehabilitation of Peck Well, which
was drilled in 1962 and last rehabilitated in 2017. The well’s current production is
below optimal levels due to mineral buildup and aging pump components.
Rehabilitation will improve well efficiency and production capacity while reducing the
risk of extended outages and costly emergency repairs.
DISCUSSION
A Notice Inviting Bids was published in accordance with City Council Resolution No.
7483, and bid packages were provided to contractors that perform this type of work.
The City Clerk received two bids on June 30, 2026, with the following results:
Bidder Location Bid Amount
General Pump Company, Inc. San Dimas, CA $ 417,540
Best Drilling and Pump, Inc. Colton, CA $ 481,443
Although the notice inviting bids was distributed to qualified contractors and
published on the City’s website, only two bids were received. Staff contacted
contractors that received the notice to inquire about their decision not to submit
bids; however, no responses were received despite multiple outreach attempts.
Due to the specialized nature of this work, there are limited contractors capable of
performing the required services. After review, General Pump Company, Inc., was
determined to have submitted the lowest responsive bid and is qualified to complete
the project in accordance with the bid documents. General Pump Company, Inc. has
successfully completed preventative maintenance on City of Arcadia wells and has
performed similar projects for several other municipalities, including the Cities of
Ontario, Monrovia, Riverside, Santa Monica, and Orange.
Award Inspection and Rehabilitation of Peck Well Project
August 18, 2026
Page 3 of 3
ENVIRONMENTAL ANALYSIS
This well inspection and rehabilitation project is considered a Class 1 exemption as
defined in Section 15301(b) of the California Environmental Quality Act, since the
project consists of the maintenance of an existing public facility providing public
utility service.
FISCAL IMPACT
A total of $950,000 was appropriated in the Fiscal Year 2024-25 Capital Improvement
Program (“CIP”) for the Inspection and Rehabilitation of Peck Well. The CIP project
scope also identifies the conversion of the Peck Well service switchgear from 2,400
volts to 3-phase 480 volts and replacement of the Peck Well motor control center.
These electrical improvements will be performed under a separate contract.
The estimated cost to complete the inspection and rehabilitation of Peck Well is
$417,540. Including a 10% project contingency, the total authorized project amount
is estimated at $459,294. Sufficient CIP funding is available to complete the
inspection and rehabilitation work, while preserving adequate funding for the future
service switchgear conversion and motor control center replacement.
RECOMMENDATION
It is recommended that the City Council determine this project is exempt under the
California Environmental Quality Act (“CEQA”); and approve, authorize, and direct the
City Manager to execute a contract with General Pump Company, Inc. for the
inspection and rehabilitation of the Peck Well Project in the amount of $417,540, with
a 10% contingency.
Attachments: Exhibit “A” – Project Location Map
Proposed Contract
CITY OF ARCADIA
WELL INSPECTION AND REHABILITATION OF PECK WELL
PROJECT NO.: 72863625
BETWEEN
CITY OF ARCADIA
AND
GENERAL PUMP COMPANY, INC.
CONTRACT
Contract - 1
CONTRACT FOR THE
CITY OF ARCADIA
This CONTRACT, No. ________ is made and entered into this ____ day of ______________,
2026, by and between City of Arcadia, sometimes hereinafter called “City,” and General Pump
Company, Inc., sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these
presents do covenant and agree with each other as follows:
A. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the
Contract, and shall provide all labor, materials, equipment, tools, utility services, and
transportation to complete all of the Work required in strict compliance with the Contract
Documents as specified in Article 5, below, for the following Project:
Well Inspection and Rehabilitation of Peck Well Project
Project No. 72863625
The Contractor and its surety shall be liable to the City for any damages arising as a result of
the Contractor’s failure to comply with this obligation.
B. TIME FOR COMPLETION. Time is of the essence in the performance of the Work. The Work
shall be commenced on the date stated in the City’s Notice to Proceed. The Contractor shall
complete all Work required by the Contract Documents within 90 calendar days from the
commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor
agrees the time for completion set forth above is adequate and reasonable to complete the Work.
C. CONTRACT PRICE. The City shall pay to the Contractor as full compensation for the
performance of the Contract, subject to any additions or deductions as provided in the Contract
Documents, and including all applicable taxes and costs, the sum of FOUR HUNDRED
SEVENTEEN THOUSAND, FIVE HUNDRED FORTY DOLLARS AND NO CENTS
($417,540.00). Payment shall be made as set forth in the General Conditions.
D. LIQUIDATED DAMAGES. In accordance with Government Code section 53069.85, it is
agreed that the Contractor will pay the City the sum set forth in Special Conditions, Article 1.11
for each and every calendar day of delay beyond the time prescribed in the Contract Documents
for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this
is not paid, the Contractor agrees the City may deduct that amount from any money due or that
may become due the Contractor under the Contract. This Article does not exclude recovery of
other damages specified in the Contract Documents.
E. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents” include the
following:
Notice Inviting Bids
Instructions to Bidders
Bid Form
Bid Bond
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor Registration Certification
Contract - 2
Performance Bond
Payment (Labor and Materials) Bond
General Conditions
Special Conditions
Technical Specifications
Addenda
Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition, Except
Sections 1-9
Applicable Local Agency Standards and Specifications, as last revised
Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract
The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. This Contract shall
supersede any prior agreement of the parties.
F. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE. Each and every
provision of law required to be included in these Contract Documents shall be deemed to be
included in these Contract Documents. The Contractor shall comply with all requirements of
applicable federal, state and local laws, rules and regulations, including, but not limited to, the
provisions of the California Labor Code and California Public Contract Code which are applicable
to this Work.
G. INDEMNIFICATION. Contractor shall provide indemnification and defense as set forth in the
General Conditions.
H. PREVAILING WAGES. Contractor shall be required to pay the prevailing rate of wages in
accordance with the Labor Code which such rates shall be made available at the City’s
Administrative Office or may be obtained online at dir.ca.gov and which must be posted at the job
site.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Contract - 3
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on
the day and year above written.
CITY OF ARCADIA
By:
Dominic Lazzaretto
City Manager
GENERAL PUMP COMPANY, INC.
By:
Signature
Print Name and Title
Attest:
By:
City Clerk
By:
Signature
Print Name and Title
Approved as to Form:
Michael J. Maurer
City Attorney
(CONTRACTOR’S SIGNATURE MUST BE NOTARIZED AND CORPORATE SEAL AFFIXED)
Contract - 4
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me
that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s)
on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
Contract - 5
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me
that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s)
on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above