Loading...
HomeMy WebLinkAboutItem 09m - Purchase of Cyclic Storage Water STAFF REPORT PUBLIC WORKS SERVICES DEPARTMENT DATE: October 6, 2026 TO: Honorable Mayor and City Council FROM: Paul Cranmer, Assistant City Manager/Public Works Services Director By: John Corona, Utilities Manager SUBJECT: PURCHASE 2,469.99 ACRE-FEET OF IMPORTED CYCLIC STORAGE WATER FROM THE MAIN SAN GABRIEL BASIN WATERMASTER IN THE AMOUNT OF $2,684,879.13 CEQA: Not a Project Recommendation: Approve SUMMARY The City of Arcadia obtains a significant portion of its drinking water supply from the Main San Gabriel Groundwater Basin (“Main Basin”). The remaining water demand is met through City-owned wells that pump a fixed quantity of groundwater from the Raymond Basin. Arcadia maintains a Cyclic Storage Account with the Main Basin, which allows the City to store supplemental Replacement Water for future use. The City has an opportunity to pre-purchase imported water made available through the Upper San Gabriel Valley Municipal Water District (“Upper Water”), at a cost of $1,087 per acre-foot. This rate is $100 per acre-foot less than the typical cost of Replacement Water. The purchased water will be used to meet the City’s water demands during Fiscal Year 2026-27, with any unused water remaining in storage for future use. By securing water at the lower pre-purchase rate, the City and its customers are expected to realize savings of approximately $246,999 in water costs. It is recommended that the City Council approve the purchase of 2,469.99 acre-feet of Imported Cyclic Storage Water from the Main San Gabriel Basin Watermaster, in the amount of $2,684,879.13. Authorize Purchase of Cyclic Storage Water October 6, 2026 Page 2 of 3 BACKGROUND In 1973, an overproduction of water from the Main Basin resulted in a stipulated judgment that created the Main San Gabriel Basin Watermaster. The Main San Gabriel Basin Watermaster is a nine-person board appointed by the Los Angeles County Superior Court that administers and enforces the provisions of the Main San Gabriel Basin Judgment. This Judgment established water rights and responsibilities for the efficient management of the quantity and quality of the Main Basin. This is accomplished, in part, by the Main San Gabriel Basin Watermaster determining the total amount of water that can be pumped from the Main Basin each year, free from a Replacement Water assessment; this amount is referred to as the Operating Safe Yield. The Operating Safe Yield was set at 160,000 acre-feet. The City of Arcadia’s annual share of the Operating Safe Yield is 4.23%, or 6,769.68 acre-feet. Pumping more water than the amount established for a given year is allowed; however, the City must then purchase Replacement Water to recharge the groundwater basin. For context, one acre-foot is approximately the size of an entire football field buried in one foot of water. DISCUSSION The Main San Gabriel Basin Watermaster has established the Replacement Water rate at $1,187 an acre-foot for Fiscal Year 2026-27. To encourage water agencies to purchase available water from the State Water Project, a reduced rate of $1,087 per acre-foot is being offered for purchases made prior to January 1, 2027. By pre- purchasing 2,469.99 acre-feet of additional imported supplemental water at the reduced rate, the City will save approximately $246,999 compared to purchasing Replacement Water at the standard Fiscal Year 2026-27 rate. The advantages of pre-purchasing imported supplemental water and storing it in the City’s Cyclic Storage Account are two-fold. First, it ensures that water is delivered to the Main Basin, which helps maintain higher groundwater levels than would otherwise be achieved through the purchase of Replacement Water. Second, the water is secured at a lower purchase price and may be credited to the City’s Cyclic Storage account for up to five years, providing additional flexibility in managing future water demands. Authorize Purchase of Cyclic Storage Water October 6, 2026 Page 3 of 3 Because the cost of Replacement Water is expected to increase annually, pre- purchasing the imported supplemental water at the current reduced rate will provide increasing cost savings over time. ENVIRONMENTAL ANALYSIS The proposed action does not constitute a project under the California Environmental Quality Act (“CEQA”), under Section 15061 (b)(3) of the CEQA Guidelines, as it can be seen with certainty that it will have no impact on the environment. FISCAL IMPACT Sufficient funds have been budgeted in the Fiscal Year 2026-27 Water Operations Budget for the purchase of Imported Cyclic Storage Water. No General Funds are required for this purchase and pre-purchasing this water at the reduced rate will save the City approximately $246,999. RECOMMENDATION It is recommended that the City Council determine that this action does not constitute a project under the California Environmental Quality Act (“CEQA”); and approve the purchase of 2,469.99 acre-feet of Imported Cyclic Storage Water from the Main San Gabriel Basin Watermaster in the amount of $2,684,879.13.