HomeMy WebLinkAbout11-10-26 Agenda PacketARCADIA PLANNINGCOMMISSION
REGULAR MEETING AGENDA
Tuesday, November 10, 2026, 6:30 PM
Location: City Council Chambers, 240 W. Huntington Drive
Pursuant to the Americans with Disabilities Act, persons with a disability who require a disability related modification or
accommodation in order to participate in a meeting, including auxiliary aids or services, may request such modification or
accommodation from the City Clerk at (626) 574-5455. Notification 48 hours prior to the meeting will enable the City to make
reasonable arrangements to assure accessibility to the meeting.
(626) 574-5455 48
Pursuant to the City of Arcadia’s Language Access Services Policy, limited-English proficient speakers who require translation
services in order to participate in a meeting may request the use of a volunteer or professional translator by contacting the City
Clerk’s Office at (626) 574-5455 at least 72 hours prior to the meeting.
(626) 574-
5455 72
CALL TO ORDER
ROLL CALL:
Vincent Tsoi, Chair
Angela Hui, Vice Chair
David Arvizu, Commissioner
Ricky Lau, Commissioner
Chang Lee, Commissioner
SUPPLEMENTAL INFORMATION FROM STAFF REGARDING AGENDA ITEMS
PUBLIC COMMENTS (5 minute time limit per person)
Commission. Under the Brown Act, the Commission or Board Members are prohibited from
discussing or taking action on any item not listed on the posted agenda.
PUBLIC HEARING
All interested persons are invited to appear at a public hearing and to provide evidence or
testimony concerning any of the proposed items set forth below for consideration. Separate
and apart from the applicant (who may speak longer at the discretion of the Commission)
1
speakers shall be limited to . The applicant may additionally
submit rebuttal comments, at the discretion of the Commission.
You are hereby advised that should you desire to legally challenge in court or in an
administrative proceeding any action taken by the City Council regarding any public hearing
item, you may be limited to raising only those issues and objections you or someone else
raised at the public hearing or in written correspondence delivered to the City Council at, or
prior to, the public hearing.
1. Resolution No. 2197– Approving Conditional Use Permit No. CUP 25-05, Architectural
Design Review No. ADR 25-16, and Lot Line Adjustment No. LLA 26-03 for a new
convenience store with off-site beer and wine sales and the consolidation of two lots
into one lot for an existing gas station located at 701 W. Huntington Drive
CEQA: Exempt
Recommendation: Adopt
Applicant: Sara De La Cruz of A&S Engineering on behalf of Moller Retail, Inc.
There is a ten day appeal period. Appeals are to be filed by 4:30 p.m. on Friday, November 20,
2026.
CONSENT CALENDAR
All matters listed under the Consent Calendar are considered to be routine and can be acted
on by one roll call vote. There will be no separate discussion of these items unless members
of the Commission, staff, or the public request that specific items be removed from the
Consent Calendar for separate discussion and action.
2. Minutes of the October 27, 2026, Regular Meeting of the Planning Commission
Recommendation: Approve
MATTERS FROM CITY COUNCIL LIAISON
MATTERS FROM PLANNING COMMISSIONERS
MATTERS FROM ASSISTANT CITY ATTORNEY
MATTERS FROM STAFF INCLUDING UPCOMING AGENDA ITEMS
ADJOURNMENT
The Planning Commission will adjourn this meeting to Tuesday, November 24, 2026, at 6:30
p.m.
2
Welcome to the Arcadia Planning Commission Meeting!
The Planning Commission encourages public participation and invites you to share your
views on City business.
MEETINGS: Regular Meetings of the Planning Commission are held on the second and fourth
Tuesdays of each month at 7:00 p.m. in the City Council Chambers. A full Planning
Commission agenda packet with all backup information is available at City Hall, the Arcadia
Public Library, and on the City’s website at www.ArcadiaCA.gov. Copies of individual Agenda
Reports are available via email upon request (Planning@ArcadiaCA.gov). Documents
distributed to a majority of the Planning Commission after the posting of this agenda will be
Arcadia, California.
CITIZEN PARTICIPATION: Your participation is welcomed and invited at all Planning
Commission meetings. Time is reserved at each regular meeting for those in the audience
who wish to address the Planning Commission. The City requests that persons addressing
the Planning Commission refrain from making personal, slanderous, profane, or disruptive
remarks. When the Chair asks for those who wish to speak please come to the podium and
state your name and address for the record. Please provide a copy of any written materials
used in your address to the Planning Commission as well as a copy of any printed materials
you wish to be distributed to the Planning Commission.
MATTERS NOT ON THE AGENDA should be presented during the time designated as
“PUBLIC COMMENTS.” In general, each speaker will be given (5) minutes to address the
Planning Commission; however, the Chair, at his/her discretion, may shorten the speaking
time limit to allow all speakers time to address the Planning Commission. By State law, the
Planning Commission may not discuss or vote on items not on the agenda. The matter
will automatically will be
placed on the agenda of a future meeting.
PUBLIC HEARINGS AND APPEALS are items scheduled for which public input is either
required or desired. Separate and apart from an applicant or appellant (who may speak
longer at the discretion of the Planning Commission), speakers shall be limited to (5) minutes
per person. The Chair, at his/her discretion, may shorten the speaking time limit to allow all
speakers to address the Planning Commission. The applicant or appellant may also be
an additional opportunity for rebuttal comments.
AGENDA ITEMS: The Agenda contains the regular order of business of the Planning
Commission. Items on the Agenda have generally been reviewed and investigated by the City
3
a matter before making its decision.
CONSENT CALENDAR: Items listed on the Consent Calendar are considered to be routine by
the Planning Commission and may be acted upon by one motion. There will be no separate
so requests. In this event, the item will be removed from the Consent Calendar and
considered and acted on separately.
DECORUM: While members of the public are free to level criticism of City policies and the
action(s) or proposed action(s) of the Planning Commission or its members, members of the
public may not engage in behavior that is disruptive to the orderly conduct of the
proceedings, including, but not limited to, conduct that prevents other members of the
audience from being heard when it is their opportunity to speak, or which prevents members
of the audience from hearing or seeing the proceedings. Members of the public may not
threaten any person with physical harm or act in a manner that may reasonably be
interpreted as an imminent threat of physical harm. All persons attending the meeting are
expected to adhere to the City’s policy barring harassment based upon a person’s race,
religious creed, color, national origin, ancestry, physical handicap, medical condition, marital
status, gender, sexual orientation, or age. The Chief of Police, or such member or members
of the Police Department, may serve as the Sergeant-at-Arms of the Planning Commission
meeting. The Sergeant-at-Arms shall carry out all orders and instructions given by the
the meeting. Any
person who violates the order and decorum of the meeting may be placed under arrest and
such person may be prosecuted under the provisions of Penal Code Section 403 or
applicable Arcadia Municipal Code section.
4
(Arcadia Public Library) (www.ArcadiaCA.gov)
(Planning@ArcadiaCA.gov)
(City Hall, 240 W. Huntington Drive,
Arcadia, California)
“” (5)
(5)
“”
“”
403
5
STAFF REPORT
DEVELOPMENT SERVICES DEPARTMENT
DATE: November 10, 2026
TO:Honorable Chairperson and Planning Commission
FROM:Jared Rosengren, Deputy Development Services Director
By: Edwin Arreola, Senior Planner
SUBJECT:RESOLUTION NO. 2197 APPROVING CONDITIONAL USE PERMIT NO. CUP 25-
05, ARCHITECTURAL DESIGN REVIEW NO. ADR 25-16, AND LOT LINE
ADJUSTMENT NO. LLA 26-03 FOR A NEW CONVENIENCE STORE WITH OFF-SITE
BEER AND WINE SALES AND THE CONSOLIDATION OF TWO LOTS INTO ONE
LOT FOR AN EXISTING GAS STATION LOCATED AT 701 W. HUNTINGTON DRIVE
CEQA: Exempt
Recommendation: Adopt
SUMMARY
The Applicant, Sara De La Cruz of A&S Engineering, on behalf of the property owner, Moller
Retail, Inc., is requesting approval of Conditional Use Permit (CUP) No. CUP 25-05,
Architectural Design Review No. ADR 25-16, and Lot Line Adjustment No. LLA 26-03 to
demolish an existing 1,568 square foot convenience store/service bay building and replace
it with a new 3,549 square foot, one story convenience store (dba: Conserv Fuel) located at
beer and wine sales for
off-site consumption. The Project would also consolidate two existing parcels into a single
33,890 square foot lot.
It is recommended that the Planning Commission adopt Resolution No. 2197 and find that
the Project is Categorically Exempt under CEQA and approve Conditional Use Permit No. CUP
25-05, Architectural Design Review No. ADR 25-16, and Lot Line Adjustment No. LLA 26-03,
subject to the conditions listed in this staff report (refer to Attachment No. 1).
BACKGROUND
The Project site is comprised of two lots totaling 33,890 square feet and is located on the
northwest corner of West Huntington Drive and South Baldwin Avenue. Currently, the
existing gas service station, originally built in 1967, is developed with two fueling canopies,
6
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 2 of 18
each containing eight (8) fuel dispensers for a total of 16 fuel dispensers. It also has a 1,568
square foot, one-story convenience store with service bays at the rear of building.
The site is zoned C-O, Professional Office, and has a General Plan Land Use Designation of
Commercial (refer to Figure 1 below and Attachment No. 2 for an Aerial Photo with zoning
information and photos of the subject property).
Figure 1 Aerial of the Subject Site.
PROJECT SITE
7
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 3 of 18
The surrounding land uses and zoning are as follows (see Table 1):
Table 1. Surrounding Land Uses
Direction Use Zoning
West Medical C-O (Professional Office)
South Financial (Chase Bank) C-G (General Commercial)
East Fire Station PF (Public Facilities)
North Multifamily Residential R-3 (High Density Residential)
In December 2022, the Planning Commission approved the replacement of the two existing
fueling canopies with one new large canopy and the demolition of the existing convenience
store/service bay building for a new 3,120 square foot, one-story convenience store that was
to be located at the northernmost part of the site. The applicant did not move forward with
the construction of the Project, and it has since expired.
PROPOSAL
The subject project would demolish the existing 1,568 square foot convenience store/service
bay building with a new 3,549 square foot, one-story convenience store on the west side of
the property (refer to Attachment No. 3 for the Architectural Plans). The two existing fueling
canopies and 16 existing fuel dispensers would remain in place without changes. With the
new building, the site would have a floor area ratio (FAR) of 10.5 percent, well under the 50
percent maximum allowed in the C-O zone.
The design of the proposed convenience store will consist of smooth cement plaster walls, a
glass storefront, concrete tile roofing, stone veneer, and metal accents. The building would
be 27 -5 its highest roof ridge. The interior of the convenience store will consist of
retail space, restrooms, and backroom storage area. Vehicular access would continue to be
provided from both W. Huntington Drive and S. Baldwin Avenue (see Figure 2).
8
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 4 of 18
Figure 2 Site Plan
The proposed CUP would bring the existing use of the service station into conformance with
the Development Code and allow the sale of beer and wine for off-site consumption. The
service station currently operates as a legal non-conforming use, meaning the use was
approved legally without a CUP under prior zoning regulations but does not conform to
current requirements. As part of this proposal, the entire site must be brought into
compliance with the current Development Code, including all required entitlements. The
Applicant also proposes to sell beer and wine for off-site consumption under a Type 20
Alcohol Beverage Control (ABC) License.
Hours of operation are subject to approval, as part of the CUP. The Applicant requests 24-
hour fuel sales, which is typical of most service stations. The convenience store will be open
between the hours of 5:00 AM and 11:00 PM, seven days a week with alcohol sales limited to
New Convenience Store
9
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 5 of 18
6:00 AM and 11:00 PM. The business will offer air and water service, a propane exchange
program, and electric vehicle charging. No third-party sales or independent vending will be
permitted and no more than two employees will be present on site at any given time.
The site is currently comprised of two lots with a smaller 11,760 square foot lot located on
the west side of the site and a 22,130 square foot lot located on the east. The existing
structures are built across the shared lot line. To bring the site into conformance, the two
lots will be consolidated into a single 33,890 square foot lot through a Lot Line Adjustment.
ANALYSIS
The C-O zone allows service stations and beer and wine sales for off-site consumption
subject to the approval of a CUP. The CUP ensures the proposed business is appropriate for
the property and compatible with the surrounding uses. Retail uses, such as the proposed
convenience store, are permitted as an ancillary use in conjunction with service stations.
The existing service station was permitted by right when the site was developed
and is currently legal nonconforming. Under the current development code, a Conditional
Use Permit is required to bring the site into conformance and allow the use to continue. The
fueling component of will not change and the two existing canopies and 16 existing fuel
dispensers will remain. A new, larger convenience store will be constructed farther west on
the property. Because the Project continues an established use on the site, the service
station will remain compatible with the surrounding uses.
The sale of beer and wine for off-site consumption is common at convenience stores in
Arcadia and elsewhere. The use is not anticipated to adversely affect neighboring properties
because beer and wine will be sold for off-site consumption only and sales will be limited to
approved hours of operation. The Applicant will be required to comply with all applicable
ABC) regulations and employees involved in alcohol sales will be required to complete the
ABC mandated training, which includes recognizing signs of intoxication and verifying
customer identification. The Fire Department and Police Department reviewed the
application and raised no concerns.
Hours of operation are subject to review under the CUP. Service stations typically offer 24
hour fueling due to the ability to pay for fuel at the fuel dispenser with credit card. The
convenience store, however, will be limited to 5:00 AM to 11:00 PM, seven days a week,
consistent with many service stations that offer 24-hour fueling but close the store overnight.
Additionally, since the business abuts residential properties, the Development Code limits
delivery hours between 7:00 AM to 10:00 PM.
The Development Code requires one (1) parking space per 200 square feet of retail floor
area. Based on the 3,549 square foot convenience store, a total of 18 parking spaces are
10
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 6 of 18
Figure 3 - Front Elevation of Convenience Store
required and provided including one accessible space and at least one electric charging
space. Additionally, the Project will provide two bicycle parking spaces, as required per the
Development Code. Since the property is within 100 feet of residential properties, parking
lot lighting fixtures are limited to 15 feet in height and will need to comply with the
Development Code regulations for parking lot lighting must be hooded and directed away
from the adjoining properties and streets to minimize light and glare. As proposed, the
Project complies with all applicable parking and lighting requirements.
The proposed building is designed in a contemporary style consistent with other
convenience store buildings within the vicinity. Materials include smooth cement plaster
walls, a glass storefront, concrete tile roofing, stone veneer, and metal accents. Roof
parapets will screen all rooftop mechanical equipment. The colors and materials palette
provides a neutral color base with accent finishes. Overall, the design is consistent with the
The C-O zone allows a maximum building height of 40 feet, and the new convenience store
is proposed at 27 feet 5inches. The Project also complies with all C-O zone development
standards, including setbacks, floor area ratio, and landscaping.
The Lot Line Adjustment will consolidate the two existing lots into one lot, placing the entire
use on a single lot. with the proposed adjustment satisfies all applicable requirements for a
Lot Line Adjustment.
FINDINGS
Conditional Use Permit
Section 9107.09.050(B) of the Development Code requires that the Planning Commission
may approve a Conditional Use Permit if all of the following findings can be made:
11
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 7 of 18
1. The proposed use is consistent with the General Plan and any applicable specific
plan; and is allowed within the applicable zone, subject to the granting of a
Conditional Use Permit, and complies with all other applicable provisions of the
Development Code and the Municipal Code.
Facts to Support This Finding: The site has a General Plan land use designation of
Commercial allows for a wide-range of commercial uses that serve both neighborhood
and citywide markets.
Project continues that use with a new, larger convenience store with the addition of beer
and wine sales for off-site consumption.
The site is zoned C-O (Professional Office) which under Development Code Section
9102.03.020, Table 2-8, allows service stations and off-site beer and wine sales, subject
approval of a Conditional Use Permit. The proposed business will comply with all other
applicable provisions of the Development Code and the Municipal Code. Approval of the
CUP will bring the existing legal non-conforming service station into conformance with
the Development Code, and the Lot Line Adjustment will consolidate the site into a single
lot, eliminating structures built across the existing lot line. The use will be consistent with
the intended commercial use of the property and will be required to comply with all other
State or County safety requirements. The proposed use will remain as a service station.
Therefore, approval of the service station will not adversely affect the comprehensive
General Plan, and it is consistent with the following General Plan policy:
Land Use and Community Design Element
Policy LU-1.1: Promote new infill and redevelopment projects that are consistent with
Policy LU-6.7: Encourage a balanced distribution of commercial development
throughout the City, ensuring that neighborhoods and districts have adequate access
to local-serving commercial uses.
2. The design, location, size, and operating characteristics of the proposed activity
will be compatible with the existing and future land uses in the vicinity.
Facts to Support This Finding: The site has operated as a service station since 1967 and
the proposed operating characteristics will be similar to the existing use. Additionally, the
site is being improved and reconfigured to make efficient use of the property including
an expanded convenience store offering off-site beer and wine sales for off-site
consumption. All operations are to be contained on site and will provide the required
parking. Therefore, the proposed service station and off-site beer and wine sales will be
consistent with the existing and future land uses in the vicinity.
12
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 8 of 18
3. The site is physically suitable in terms of:
a. Its design, location, shape, size, and operating characteristics of the
proposed use in order to accommodate the use, site improvements, loading,
and parking.
Facts to Support This Finding: The service station will consist of two existing fueling
canopies with 16 existing fuel dispensers and a new 3,560 square foot convenience store.
The site can accommodate the proposed use and structures since the number fuel
dispensers will not change and the convenience store will provide the required parking,
including an accessible space. Service stations are typically located on busy corridors or
intersections in order to provide fuel to commuters, such as at the subject site and off-
site beer and wine sales are common at convenience stores of this type. Therefore, the
proposed use is physically suitable in terms of its design, location, shape, size, and
operating characteristics.
b. Streets and highways adequate to accommodate public and emergency
vehicle (e.g., fire and medical) access.
Facts to Support This Finding: The site is located on the northwest corner of W.
Huntington Drive and South Baldwin Avenue. The site has access off both major
thoroughfares. These streets are adequate in width and pavement type to carry
emergency vehicles and traffic generated by the proposed use and existing uses on the
site. The Project will not impact these rights-of-way.
c. Public protection services (e.g., fire protection, police protection, etc.).
Facts to Support This Finding: The Fire and Police Department have reviewed the
application and determined that no additional improvements are needed to provide
adequate protection services to the subject site.
d. The provision of utilities (e.g., potable water, schools, solid waste collection
and disposal, storm drainage, wastewater collection, treatment, and
disposal, etc.).
Facts to Support This Finding: The site can be adequately served by all required utilities
through interconnection with existing utilities in the W. Huntington Drive and Baldwin
Avenue rights-of-way. The project will require new utility connections for potable water,
sewer, and storm drainage, and best management practices during construction and
operation will protect water quality. The sale of beer and wine for off-site consumption
13
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 9 of 18
will not impact the existing infrastructure serving the site. Therefore, no impacts on the
provision of utilities are anticipated.
4. The measure of site suitability shall be required to ensure that the type,
density, and intensity of use being proposed will not adversely affect the public
convenience, health, interest, safety, or general welfare, constitute a nuisance,
or be materially injurious to the improvements, persons, property, or uses in
the vicinity and zone in which the property is located..
Facts to Support This Finding: The site is an existing legal non-conforming service
station on a commercial corridor with a range of businesses serving the surrounding
community. The Project continues essentially the same use, provides the required
parking, and orients the convenience store away from the residential uses to the north.
Beer and wine sales will be ancillary to the service station and convenience store, limited
to off-site consumption, and subject to ABC regulations and the approved hours. The
proposed business will provide a commercial service to the general public in compliance
with and pursuant to the Arcadia Development Code and Arcadia Municipal Code
standards. Therefore, the sale of off-site beer and wine at this location will not adversely
affect the public convenience, health, interest, safety, or general welfare, constitute a
nuisance, or be materially injurious to persons, property, or uses in the vicinity.
Service/Fueling Stations
Section 9104.02.280(B.1.) of the Development Code requires that the Planning Commission
may permit a service/fueling station if all of the following findings can be made:
1. The proposed use complies with all requirements set forth for the issuance of a
Conditional Use Permit.
Facts to Support This Finding: All the findings for a Conditional Use Permit can be made,
as described above. The proposed use is consistent with the Commercial General Plan
land use designation of this site and meets all the requirements of the Development
Code and Municipal Code, is compatible with the land uses in the vicinity and is on a
physically suitable site for the proposed use. Additionally, the service station will not
adversely affect the public or constitute a nuisance.
2. The proposed use will not substantially increase vehicular traffic on any street
in a residential zone.
Facts to Support This Finding: The Project site is currently used as a service station with
16 fuel dispensers and a convenience store. The project will not add fuel dispensers and
the new convenience store will not be substantially increased in size. The site will be
14
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 10 of 18
accessed off of two primary thoroughfares in the City, W. Huntington Drive and S. Baldwin
Avenue, which are not residential streets. Therefore, the Project is not expected to
substantially increase vehicular traffic on any street in a residential zone compared to
the current use.
3. The proposed use will not lessen the suitability of any nearby commercially
zoned property for commercial use by interfering with pedestrian traffic.
Facts to Support This Finding: The Project updates the convenience store and layout of
an existing service station. The two driveway aprons closest to the street intersection will
be removed reducing conflicts with pedestrian in the public right-of-way and the Project
will include sidewalk improvements. The Project will not interfere with pedestrian traffic
or lessen suitability of nearby commercially zoned properties for commercial use.
4. The proposed use will not create increased traffic hazards to pedestrians when
located near a school, place of religious assembly, auditorium, theater, or other
place of assembly.
Facts to Support This Finding: The proposed service station is located on the corner of
two major thoroughfares, W. Huntington Drive and Baldwin Avenue, which primarily
consist of commercial and multi-family residential uses within the vicinity of the site. No
schools, places of religious assembly, auditoriums, theaters, or other places of assembly
are located within the vicinity of the site. Therefore, the Project will not create increased
traffic hazards for pedestrians associated with such uses.
Architectural Design Review
Section 9107.19.050(F) of the Development Code requires that the Planning Commission
may approve a Site Plan and Design Review if all of the following findings can be made:
1. The proposed development is in compliance with all applicable development
standards and regulations in the Development Code.
Facts to Support This Finding: The proposed convenience store complies with the
applicable C-O zone development standards, including but not limited to the setbacks,
floor area ratio, landscaping, building height, parking. The proposed convenience store
provides --3 property, provides a
-
-18 parking spaces, including one accessible parking
space and one electric vehicle charging space. Therefore, the Project complies with the
Development Code and all other applicable City regulations and policies.
15
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 11 of 18
2. The proposed development is compatible in terms of scale and aesthetic design
with surrounding properties and developments.
Facts to Support This Finding: The proposed convenience store is consistent with the
the existing developments along this portion of Baldwin Avenue and W. Huntington
Drive. The proposed design incorporates a variety of finishes and materials, plaster
stucco, stone veneer, and decorative metal elements, that add visual interest along
Baldwin Avenue and at this prominent intersection and blend in with the commercial and
residential buildings in the area. Since this is a compatible continuation of the use, the
service station will still be compatible with the surrounding uses.
3. The proposed development will have an adequate and efficient site layout in
terms of access, vehicular circulation, parking and landscaping.
Facts to Support This Finding: The Project provides a functional site layout for the
service station and new convenience store. The fuel dispenser layout will remain
unchanged and the site has historically functioned without circulation or access issues.
Locating the convenience store towards the west side of the site will improve circulation
around the fuel dispenser area. Additionally, removing the driveways closest to the
intersection on both W. Huntington Drive and Baldwin Avenue will add additional safety
precautions by moving vehicles to enter and exit farther away from the intersection,
avoiding potential blind spots with vehicles turning at the corner. Overall, the site layout
efficiently accommodates the development and its associated improvements.
4. The proposed development will be in compliance with all of the applicable
criteria identified in Subparagraph 9107.19.040(C.5).
Facts to Support This Finding: All applicable City requirements regarding disabled
access and facilities, occupancy limits, building and fire safety, health code compliance,
emergency access and equipment, environmental regulations, parking, and site design
shall be complied with by the Applicant/Property Owner to the satisfaction of the Building
Official, City Engineer/Deputy Director, Deputy Development Services Director, Fire
Marshal, Public Works Services Director, or their respective designees. The proposed
development will also be required to comply with the General Plan, Development Code,
applicable City Design Guidelines, conditions of approval, and all other applicable City
regulations.
Lot Line Adjustment
Section 9105.07.030(C) of the Development Code requires that the Planning Commission
may approve a Lot Line Adjustment if all of the following findings can be made:
16
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 12 of 18
1. The lot line adjustment would not create any new lots, include lots created
illegally, involve more than four lots, or involve lots that are not adjoined.
Facts to Support This Finding: The proposed lot line adjustment will not create new lots
but instead seeks to consolidate the two existing lots into a single legal parcel, resulting
in a total lot area of 33,890 square feet. This consolidation aligns with the intent of this
finding.
2. No street or alley dedication or improvements are necessary to properly service
the properties involved in the proposed lot line adjustment.
Facts to Support This Finding: The proposed lot line adjustment will consolidate the two
existing legal lots and will not require any new street or alley dedication or improvements
necessary to service the proposed Project nor properties involved in the proposed lot
line adjustment.
3. The lots, as proposed by the lot line adjustment, will conform, in all respects, to
the minimum provisions of this Division and those of this Development Code.
Facts to Support This Finding: The legal lots joined together by the lot line adjustment
will fully comply with the provisions of the Development Code, ensuring that the
proposed Project meet all applicable requirements. As such, the proposed lot line
adjustment fulfills the intent of this finding.
4. The lot line adjustment does not create additional lots.
Facts to Support This Finding: The proposed Lot Line Adjustment will consolidate two
existing legal lots; therefore, no additional lots will be created.
5. All lien holders, record owners, and trust deed holders consent in writing to the
lot line adjustment.
Facts to Support This Finding: Both legal lots are under the same ownership and all
owners and holders have provided written consent to the lot line adjustment, ensuring
full approval from all interested parties.
6. A title report prepared by a title insurer, with the title report required to be
dated no older than within 90 days from the filing date of the lot line
adjustment application, is submitted.
Facts to Support This Finding: The owner has submitted a title report prepared by a
title insurer, with the report dated not more than 90 days from the filing date of the lot
line adjustment application before the lot line adjustment and will comply with the
requirement to submit a title report prepared by a title insurer, with the report dated not
17
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 13 of 18
more than 90 days from the filing date of a certificate of compliance and recordation by
All City requirements regarding disabled access and facilities, occupancy limits, building
safety, health code compliance, emergency equipment, environmental regulation
compliance, and parking and site design shall be complied with by the Property
Owner/Applicant to the satisfaction of the Building Official, City Engineer, Planning &
Community Development Administrator, Fire Marshal, and Public Works Services Director,
or their respective designees.
ENVIRONMENTAL IMPACT
It has been determined that the Project site is less than five (5) acres; the Project site has no
value as a habitat for endangered, rare or threatened species; the proposed Project will not
have any significant effects upon the environment, and the site can be adequately served by
all the required utilities and public services. The site was listed on the hazardous material
database, however the site has been cleaned-up and the case was closed in 1993. Therefore,
the Project is exempt under Class 32 (In-Fill Development Projects) pursuant to Section 15332
of the CEQA Guidelines (refer to Attachment No. 4).
PUBLIC COMMENTS/NOTICE
30, 2026. It was also
mailed to the property owners located within 300 feet of the subject property. As of
November 6, 2026, no comments were received regarding this Project.
RECOMMENDATION
It is recommended that the Planning Commission adopt Resolution No. 2197 approving
Conditional Use Permit No. CUP 25-05, Architectural Design Review No. ADR 25-16, and Lot
Line Adjustment No. LLA 26-03 to demolish an existing 1,568 square foot convenience
store/service bay building and replace it with a new 3,549 square foot, one-story convenience
store with added beer and wine sales for off-site consumption at an existing gas station site
and to consolidate the two existing parcels the comprise the site into a single 33,890 square
foot lot located at 701 W. Huntington Drive find that the Project is Categorically Exempt under
the California Environmental Quality Act (CEQA), subject to the following conditions of
approval:
1. The use approved by CUP 25-05 shall be limited to a service station with 16 fuel
dispensers and an ancillary convenience store offering beer and wine sales for off-site
consumption, and it shall be operated and maintained in a manner that is consistent
18
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 14 of 18
with the approved plans and may be subject to periodic inspections to ensure that the
business is operated per the approval. Off-site beer and wine sales shall remain
incidental to the convenient store and are authorized only in conjunction with the
service station business approved under CUP 25-05. If the business ceases to operate,
the authorization for sale of off-site beer and wine under this Conditional Use Permit
shall terminate and shall not apply to any subsequent business or tenant, unless the
subsequent use is also a service station with an ancillary convenience store and the
continued authorization is approved by the City. A change in ownership or operator
shall be subject to City review and approval to the extent permitted by applicable law
and the Development Code.
2. The Project shall be operated and maintained in substantial conformance with the
project description and plans approved under CUP 25-05, ADR 25-16, and LLA 26-03.
Any proposed changes to the use shall be subject to review and approval by the
Development Services Director, or their designee.
3. The operating hours shall be limited to 5:00 AM to 11:00 PM, seven days a week. Beer
and wine sales for off-site consumption shall be limited to 6:00 AM to 11:00 PM, seven
days a week. Any changes to the hours of operation shall be subject to review and
approval by the Development Services Director, or their designee.
4. All deliveries shall be limited between the hours of 7:00 AM and 10:00 PM. The operator
of the business shall ensure that loitering does not occur around the entryways of the
convenience store or in the parking areas.
5. The parking lot lighting shall be limited to 15 feet in height and shall comply with the
Development Code regulations for Parking Lot Lighting. The lighting shall be hooded
and arranged to reflect away from the adjoining properties and streets.
6. The plans submitted for plan check in Building Services shall comply with the latest
adopted edition of the following codes as applicable:
a. California Building Code
b. California Electrical Code
c. California Mechanical Code
d. California Plumbing Code
e. California Energy Code
f. California Fire Code
g. California Green Building Standards Code
h. California Existing Building Code
i. Arcadia Municipal Code
19
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 15 of 18
7. Prior to issuance of a Certificate of Occupancy, the existing ADA ramp on the corner of
W. Huntington Drive and S. Baldwin Avenue shall be replaced with the most current
standard per the Engineering Division. Any portion of the ADA ramp that is not within
the public right-of-way shall be dedicated to the City of Arcadia. This shall be subject to
review and approval by the City Engineer or designee.
8. The existing curb, gutter, and sidewalk shall be replaced from property line to property
line. The sidewalk shall be installed for the full public parkway except for tree wells.
Existing tree wells shall be expanded where possible and maintained with a minimum
-
approval by the City Engineer.
9. Install electrical conduit infrastructure for up to a maximum of four future pedestrian
lights along Baldwin Avenue. The exact number and placement of infrastructure will be
determined during plan check.
10. Install one pedestrian light next to the bus stop on W. Huntington Drive. The exact
location of the pedestrian light will be determined during plan check.
11. Street trees are required to be planted on both parkway frontages, subject to review
and approval by the Streets Superintendent from Public Works Services Department.
The new street trees must be planted prior to issuance of a Certificate of Occupancy.
12. The driveway approaches that serve the subject property shall be replaced and brought
required by Engineering Services.
13. Any damages to the asphalt street frontages, from property line to property line, that
was caused by the development shall be repaired. This shall be left to the discretion of
the City Engineer and Street Superintendent, and it must be completed prior to
issuance of a Certificate of Occupancy or within a timeframe agreed upon by the City.
14. The proposed development is required to comply with Low Impact Development (LID)
and provide permanent treatment of the stormwater runoff and a SWPPP for the
stormwater runoff during construction. The LID plan may include infiltration trenches,
bioretention planter boxes, roof drains connected to a landscaped area, pervious
concrete/paver, etc.
15. An automatic fire sprinkler system shall be installed within the convenience store and
it shall be monitored by a UL listed central station per the City of Arcadia Fire
Department.
16. A knox box shall be provided adjacent to the main entrance of the convenience store.
20
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 16 of 18
17. The Applicant/Property Owner shall provide calculations to determine the maximum
commercial demand and maximum fire demand in order to verify the required water
service size required.
18. A separate landscape water meter is required for common area landscape irrigation.
The backflow preventer on the common area irrigation shall be of a Reduced Pressure
Backflow Assembly, as required by the Public Works Services Department.
19. Separate commercial water service shall be provided by a common master meter
installed within the public right-of-way. An approved Reduce Pressure Backflow
Assembly shall be installed for meter services protection and approved by the Public
Works Services Department.
20. A Water Meter Permit Application shall be submitted to the Public Works Department
for review and approval prior to permit issuance. New water service installations shall
be installed by the Applicant/Property Owner. Abandonment of existing water services,
if necessary, shall be carried out by the Property Owner/Applicant.
21. If connecting to a City sewer main, the Applicant/Property Owner shall utilize existing
sewer lateral(s), if any.
22. Noncompliance with the plans, provisions and conditions of approval for CUP 25-05,
ADR 25-16, and LLA 26-03 shall be grounds for immediate suspension or revocation of
any approvals, which could result in termination of this Project.
23. Approval of CUP 25-05, ADR 25-16, and LLA 26-03 shall not be in effect unless the
Property Owner and Applicant have executed and filed the Acceptance Form with the
City on or before 30 calendar days after the Planning Commission has adopted the
Resolution. The Acceptance Form to the Development Services Department is to
indicate awareness and acceptance of the conditions of approval. The
Applicant/Property Owner shall comply with all City requirements regarding building
safety, fire prevention, detection, suppression, emergency access, public right-of-way
improvements, parking, water supply and water facilities, sewer facilities, trash
reduction and recycling requirements, and National Pollutant Discharge Elimination
System (NPDES) measures, all to the satisfaction of the Building Official, Fire Marshal,
Public Works Services Director, and Deputy Development Services Director.
Compliance with these requirements is to be determined by having fully detailed
construction plans submitted for plan check review and approval by the foregoing City
officials and employees.
24. To the maximum extent permitted by law, Applicant must defend, indemnify, and hold
the City, any departments, agencies, divisions, boards, and/or commissions of the City,
and its elected officials, officers, contractors serving as City officials, agents, employees,
21
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 17 of 18
claims, actions, or proceedings for damages for personal injuries, including death, and
claims for property damage, and with respect to all other actions and liabilities for
in connection with CUP 25-05, ADR 25-16, and LLA 26-03
and which may arise from the direct or indirect operations of the Applicant or those of
ent and/or construction of the Project.
This indemnity provision applies to all damages and claims, actions, or proceedings for
damages, as described above, regardless of whether the City prepared, supplied, or
approved the plans, specifications, or other documents for the Project.
In the event of any legal action challenging the validity, applicability, or interpretation
of any provision of this approval, or any other supporting document relating to the
Project, the City will notify the Applicant of the claim, action, or proceedings and will
cooperate in the defense of the matter. The Applicant must indemnify, defend and hold
harmless the Indemnitees, and each of them, with respect to all liability, costs and
expenses incurred by, and/or awarded against, the City or any of the Indemnitees in
Applicant shall provide to the City a cash deposit to cover legal fees, costs, and expenses
incurred by City in connection with defense of any legal action in an initial amount to
be reasonably determined by the City Attorney. The City may draw funds from the
deposit for such fees, costs, and expenses. Within 5 business days of each and every
notice from the City that the deposit has fallen below the initial amount,
Applicant/Property Owner shall replenish the deposit each and every time in order for
Applicant/Property Owner any unexpended funds from the deposit within 30 days of:
(i) a final, non-appealable decision by a court of competent jurisdiction resolving the
legal action; or (ii) full and complete settlement of legal action. The City shall have the
right to select legal counsel of its choice. The parties hereby agree to cooperate in
defending such action. The City will not voluntarily assist in any such third-party
challenge(s). In consideration for approval of the Project, this condition shall remain in
effect if the entitlement(s) related to this Project is rescinded or revoked, at the request
of the Applicant or not.
PLANNING COMMISSION ACTION
Approval
If the Planning Commission intends to approve this proposal, the Commission should pass
a motion to approve Conditional Use Permit No. CUP 25-05, Architectural Design Review No.
ADR 25-16, and Lot Line Adjustment No. LLA 26-03, stating that the proposal satisfies the
22
Resolution No. 2197 CUP 25-05, ADR 25-16, and LLA 26-03
November 10, 2026
Page 18 of 18
requisite findings, and adopt the attached Resolution No. 2197 that incorporates the
requisite environmental and Conditional Use Permit findings and the conditions of approval
as presented in this staff report, or as modified by the Commission.
Denial
If the Planning Commission intends to deny this proposal, the Commission should pass a
motion to deny Conditional Use Permit No. CUP 25-05, Architectural Design Review No. ADR
25-16, and Lot Line Adjustment No. LLA 26-03, stating the finding(s) that the proposal does
not satisfy with reasons based on the record, and direct staff to prepare a resolution for
findings.
If any Planning Commissioner, or other interested party has any questions or comments
regarding this matter prior to the November 10, 2026, Planning Commission Meeting, please
contact Senior Planner, Edwin Arreola, at (626) 821-4334 or by email at
earreola@ArcadiaCA.com.
Approved:
Jared Rosengren
Deputy Development Services Director
Attachment No. 1: Resolution No. 2197
Attachment No. 2: Aerial Photo with Zoning Information and Photos of the Subject
Property and Vicinity
Attachment No. 3: Architectural Plans
Attachment No. 4: Preliminary Exemption Assessment
Jared Rosengren
23
Attachment No. 1
Attachment No. 1
Resolution No. 2197
24
1
RESOLUTION NO. 2197
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
ARCADIA, CALIFORNIA, APPROVING CONDITIONAL USE PERMIT NO.
CUP 25-05, ARCHITECTURAL DESIGN REVIEW NO. ADR 25-16, AND LOT
LINE ADJUSTMENT NO. LLA 26-03 FOR A NEW CONVENIENCE STORE
WITH OFF-SITE BEER AND WINE SALES AND THE CONSOLIDATION OF
TWO LOTS INTO ONE LOT FOR AN EXISTING GAS STATION LOCATED AT
701 W. HUNTINGTON DRIVE
WHEREAS, on November 11, 2025, applications for Conditional Use Permit No.
CUP 25-05 and Architectural Design Review No. ADR 25-16
20, 2026, an application for Lot Line Adjustment No. LLA 26-03 was the
Applicant,
Moller Retail, Inc., to demolish an existing 1,568 square foot convenience
and replace it with a new 3,560 square foot, one-
convenience store (dba: Conserv Fuel) located at 701 W. Huntington Drive (“Project”).
-site consumption. The
Project would also consolidate two existing parcels into a single 33,890 square foot
lot; and
WHEREAS, on October 26, 2026, Planning Services completed an
environmental assessment for the Project in accordance with the California
Class 32 Categorical Exemption under CEQA pursuant to Section 15332 of the CEQA
Guidelines because the Project is considered an in-; and
25
2
WHEREAS, on November 10
before the Planning Commission on said application, at which time all interested
NOW THEREFORE, THE PLANNING COMMISSION OF THE CITY OF ARCADIA,
CALIFORNIA, DOES HEREBY FIND, DETERMINE AND RESOLVE AS FOLLOWS:
SECTION 1. The
November 10, 2026, are true and correct.
SECTION 2. This
pursuant
Conditional Use Permit
This to Section
9107.09.050(B) of the Development Code,
1.
Conditional Use Permit, and complies with all other applicable provisions of this
Development Code and the Municipal Code.
FACT: The site has a General Plan land use designation of Commercial allows
for a wide-range
markets. The site has operated as a service station since the 1960’s and the Project
26
3
continues that use with a new, larger convenience store with the addition of beer and
-site consumption.
The site is zoned C-
Section 9102.03.020, Table 2--site beer and wine
sales, subject approval of a Conditional Use Permit. The proposed business will
r applicable provisions of the Development Code and the
Municipal Code. Approval of the CUP will bring the existing legal non-conforming
service station into conformance with the Development Code, and the Lot Line
Adjustment will consolidate the site into a single lot, eliminating structures built
across the existing lot line. The use will be consistent with the intended commercial
emain as a service station. Therefore,
:
-
27
4
-6.7: Encourage a balanced distribution of commercial
adequate access to local-serving commercial uses.
2. The design, location, size, and operating characteristics of the proposed
.
FACT: The site has operated as a service station since 1967 and the proposed
operating characteristics will be similar to
--site
consumption. All operations are to be contained on site and will provide the required
-site beer and wine sales will
.
3.
a. Its design, location, shape, size, and operating characteristics of the
proposed use in order to accommodate the use, site improvements loading, and
parking.
FACT: The service station will consist of two existing fueling canopies with 16
existing fuel dispensers and a new 3,560 square foot convenience store. The site can
accommodate the proposed use and structures since the number fuel dispensers
will not change and the convenience store will provide the required parking,
28
5
or intersections in order to provide fuel to commuters, such as at the subject site and
-
Ther
shape, size, and operating characteristics.
b.
.
FACT: The site is located on the northwest corner of W. Huntington Drive and
oposed use and existing uses on the site. The Project will
not impact these rights-of-.
c. .
FACT: The Fire and Police Department have reviewed the application and
determined that no additional improvements are needed to provide adequate
protection services to the subject site.
d. The provision of utilities (e.g., potable water, schools, solid waste
collection and disposal, storm drainage, wastewater collection, treatment, and
disposal, etc.).
29
6
FACT:
interconnection with existing utilities in the W. Huntington Drive and Baldwin Avenue
rights-of-
sewer, and storm drainage, and best management practices during construction and
-site
consumption will not impact the existing infrastructure serving the site. Therefore,
no impacts on the provision of utilities are anticipated.
4.
.
FACT: The site is an existing legal non-conforming service station on a
orients the convenience s
-site consumption, and subject to ABC regulations and the approved hours. The
proposed business will provide a commercial service to the general public in
compliance with and pursuant to the Arcadia Development Code and Arcadia
30
7
-site beer and wine at this
.
Service/Fueling Stations
This
5. The proposed use complies with all requirements set forth for the
issuance of a Conditional Use Permit.
FACT: a Conditional Use Permit can be made, as described
above. The proposed use is consistent with the Commercial General Plan land use
designation of this site and meets all the requirements of the Development Code and
Municipal Code, is compatible with the
.
6.
street in a residential zone.
FACT:
dispensers and a convenience store. The project will not add fuel dispensers and the
31
8
, W. Huntington Drive and S.
Baldwin Avenue, which are not residential streets. Therefore, the Project is not
compared to the current use.
7.
FACT:
-of-
will include sidewalk improvements. The Project will not interfere with pedestrian
use.
8.
FACT: The proposed service station is located on the corner of two major
commercial and multi-
schools, places of religio
32
9
.
Architectural Design Review
This
9. The proposed development is in compliance with all applicable
development standards and regulations in the Development Code.
FACT: The proposed convenience store complies with the applicable C-O zone
landscaping, building height, parking. The proposed convenience store provides a
10’-rd setback from the adjacent R-
-5” that is well
under the 40’-0” maximum, and 18 parking spaces, including one accessible parking
space and one electric vehicle charging space. Therefore, the Project complies with
.
10. The proposed development is compatible in terms of scale and
aesthetic design with surrounding properties and developments.
FACT:
Guidelines since the proposed mass, scale, and design are compatible with the
existing developments along this portion of Baldwin Avenue and W. Huntington
33
10
stucco, stone veneer, and decorative metal elements, that add visual interest along
Baldwin Avenue and at this prominent intersection and blend in with the commercial
and residential buildings in the area. Since this is a compatible continuation of the
use, the service station will still be compatible with the surrounding uses.
11.
.
FACT:
and the site
convenience store towards the west side of the site will improve circulation around
intersection on both W. Huntington Drive and Baldwin Avenue will add additional
intersection, avoiding potential blind spots with vehicles turning at the corner.
Overall, the site
improvements.
12. The proposed development will be in compliance with all of the
34
11
FACT:
and equipment, environmental regulations, parking, and site design shall be
Marshal, Public Works Services Director, or their respective designees. The proposed
development will also be
.
Lot Line Adjustment
This
13.
FACT: The proposed lot line adjustment will not create new lots but instead
seeks to consolidate the two existing lots into a single legal parcel, resulting in a total
.
14.
service the properties involved in the proposed lot line adjustment.
35
12
FACT: The proposed lot line adjustment will consolidate the two existing legal
lot line adjustment.
15.
respects, to the minimum provisions of this Division and those of this Development
Code.
FACT:
with the provisions of the Development Code, ensuring that the proposed Project
the intent of t .
16. The lot line adjustment does not create additional lots.
FACT: The proposed Lot Line Adjustment will consolidate two existing legal
lots; therefore, no additional lots will be created.
17. All lien holders, record owners, and trust deed holders consent in
writing to the lot line adjustment.
FACT: Both legal lots are under the same ownership and all owners and
holders have provided written consent to the lot line adjustment, ensuring full
approval from all interested parties.
36
13
18.
application, is submitted.
FACT:
submit a titl
.
SECTION 3.
Act (“CEQA”), this Project is subject to a Class 32 Categorical Exemption -
development project per Section 15332 of the CEQA Guidelines.
SECTION 4. For the foregoing reasons, the Planning Commission determines
that the Project is exempt per Class 32, Section 15332 of the CEQA
Guidelines and approves Conditional Use Permit No. CUP 26-07 to allow the
demolition of
and replace it with a new 3,560 square foot, one-
-site consumption and to consolidate the two existing
parcels the comprise the site into a single 33,890 square foot lot located at 701 W.
Huntington Drive, subject to the conditions of approval attached hereto.
37
14
SECTION 5.
38
15
Passed, approved and adopted this 10th November, 2026.
_______________________________
Vincent Tsoi
Chair, Planning Commission
ATTEST:
Jared Rosengren
APPROVED AS TO FORM:
Michael J. Maurer
39
16
40
17
RESOLUTION NO. 2197
Conditions of Approval
1.-05 shall be limited to a service station with 16 fuel
-site consumption, and it shall be operated and maintained in a manner that
is consistent wit
-site beer and wine
conjunction with the service station business approved under CUP 25-05. If the
-site beer and wine
subsequent business or tenant, unless the subsequent use is also a service
Development Code.
2. The Project shall be operated and maintained in substantial conformance with
the project description and plans approved under CUP 25-05, ADR 25-16, and
LLA 26-
rvices Director, or their designee.
3.
-site consumption shall be limited to 6:00 AM to 11:00
to review and ap
4. All deliveries shall be limited between the hours of 7:00 AM and 10:00 PM. The
operator of the business shall ensure that loitering does not occur around the
5.
the Development Code regulations for Parking Lot Lighting. The lighting shall be
6.
latest adopted edition of the following codes as applicable:
a. California Building Code
41
18
b. California Electrical Code
c. California Mechanical Code
d. California Plumbing Code
e.
f. California Fire Code
g. California Green Building Standards Code
h. California Existing Building Code
i. Arcadia Municipal Code
7.
corner of W. Huntington Drive and N. Baldwin Avenue shall be replaced with the
ramp that is not within the public right-of-
Arcadia. This shall be subject t
designee.
8.
for tree wells. Existing tree wells shall be expanded where possible and
maintained with a minimum 4’-0” wide sidewalk around the tree wells. The
9. Install electrical conduit infrastructure for up to a maximum of four future
pedestrian lights along Baldwin Avenue. The exact number and placement of
infrastructure will be determined during plan check.
10. Install one pedestrian light next to the bus stop on W. Huntington Drive. The
exact location of the pedestrian light will be determined during plan check.
11.
Department. The new street trees must be planted prior to issuance of a
12.
13.
42
19
14.
n planter boxes, roof drains connected
to a landscaped area, pervious concrete/paver, etc.
15.
store
Arcadia Fire Department.
16. A knox box shall be provided adjacent to the main entrance of the convenience
store.
17.
the required water service size required.
18. A separate landscape water meter is required for common area landscape
Department.
19.
meter installed within the public right-of-
Department.
20. A Water Meter Permit Application shall be submitted to the Public Works
Department for review and approval prior to permit issuance. New water
Abandonment of existing water services,
21.
22. Noncompliance with the plans, provisions and conditions of approval for CUP
25-05, ADR 25-16, and LLA 26-03 shall be grounds for immediate suspension or
43
20
23. Approval of CUP 25-05, ADR 25-16, and LLA 26-
adopted the Resolution. The Acceptance Form to the Development Services
Department is to indicate awareness and acceptance of the conditions of
approval.The
access, public right-of-
facilities, sewer facilities, trash re
ith these
24.
and with respect to all other actions and liabilities for damages caused or
with CUP 25-05, ADR 25-16, and LLA 26-03 (“Project”) on the Project site, and
licant or those
acting on Applicant’s behalf, which relate to the development and/or
claims, actions, or proceedings for damages, as described above, regardless of
other documents for the Project.
action, or proceedings and will cooperate in the defense of the matter. The
itees in relation to such action.
44
21
funds from the deposit for such fees, costs, and expenses. Within 5 business
-
a court of competent jurisdiction resolving the legal action; or (ii) full and
rate in defending such
-
the entitlement(s) related to this Project is rescinded or revoked, at the request
of the Applicant or not.
45
Attachment No. 2
Attachment No. 2
Aerial Photo with Zoning Information and
Photos of the Subject Property and Vicinity
46
Overlays
Selected parcel highlighted
Parcel location within City of Arcadia
N/A
Property Owner(s):
Lot Area (sq ft):
Year Built:
Main Structure / Unit (sq. ft.):
C-O
Number of Units:
C
Property Characteristics
1967
1,568
1
Property Owner
Site Address:701 W HUNTINGTON DR
Parcel Number: 5777-028-021
N/A
Zoning:
General Plan:
N/A
Downtown Overlay:
Downtown Parking Overlay:
Architectural Design Overlay:Yes
N/A
N/A
N/A
Residential Flex Overlay:
N/A
N/A
N/A
Yes
Special Height Overlay:
N/A
Parking Overlay:
Racetrack Event Overlay:
This map is a user generated static output from an Internet mapping site and is for
reference only. Data layers that appear on this map may or may not be accurate, current,
or otherwise reliable.
Report generated 08-Dec-2022
Page 1 of 1 47
48
Attachment No. 3
Attachment No. 3
Architectural Plans
49
50
51
52
53
54
55
56
57
58
59
Attachment No. 4
Attachment No. 4
Preliminary Exemption Assessment
60
Preliminary Exemption Assessment
PRELIMINARY EXEMPTION ASSESSMENT
1.Name or description of project:CUP 25-05, ADR 25-16, and LLA 26-03 to allow a new 3,549
square foot, one-story convenience store with added beer and
wine sales for off-site consumption and to consolidate two
existing parcels into a single 33,890 square foot lot with a
Categorical Exemption under the California Environmental
2.Project Location Identify street
address and cross streets or
attach a map showing project site
topographical map identified by
quadrangle name):
701 W. Huntington Drive (Northwest Corner of W. Huntington
Drive and Baldwin Avenue)
3.Entity or person undertaking
project:
A.
B.Other (Private)
(1)Name Sara De La Cruz, Applicant
(2)Address 28405 Sand Canyon Rd, Ste B
Canyon Country, CA 91387
4.Staff Determination:
accordance with the Lead Agency's "Local Guidelines for Implementing the California Environmental
Quality Act (CEQA)" has concluded that this project does not require further environmental
assessment because:
a.The proposed action does not constitute a project under CEQA.
b.The project is a Ministerial Project.
c.The project is an Emergency Project.
d.The project constitutes a feasibility or planning study.
e.The project is categorically exempt.
Applicable Exemption Class: 15332 Class 32 (In-fill development)
f.The project is statutorily exempt.
Applicable Exemption:
g.The project is otherwise
exempt on the following basis:
h.The project involves another public agency, which constitutes the Lead Agency.
Name of Lead Agency:
Date: October 26, 2026 Staff: Edwin Arreola, Senior Planner
61
ARCADIA PLANNING COMMISSION
REGULAR MEETING MINUTES
TUESDAY, OCTOBER 27, 2026
Any writings or documents provided to a majority of the Planning Commission regarding any item on this agenda will be made
available for public inspection in the City’s Planning Services Office located at 240 W. Huntington Drive, Arcadia, California, during
normal business hours.
CALL TO ORDER Chair Tsoi called the meeting to order at 6:37 p.m.
ROLL CALL
PRESENT: Chair Tsoi, Vice Chair Hui (arrived at 6:36 p.m.), and Commissioner Lau
ABSENT: Commissioner Arvizu and Commissioner Lee
It was moved by Commissioner Lau and seconded by Vice Chair Hui to excuse Commissioner Arvizu
and Commissioner Lee from the meeting.
SUPPLEMENTAL INFORMATION FROM STAFF REGARDING AGENDA ITEMS
Deputy Development Services Director Jared Rosengren informed the Commission that the
conditions of Resolution No. 2201 were revised, and Senior Planner Edwin Arreola would provide
further details in his staff report presentation.
PUBLIC COMMENTS (5 minute time limit per person)
There were none.
PUBLIC HEARING
1. Resolution No. 2201 – Approving Conditional Use Permit No. CUP 26-07 to allow for the off-
site sale of beer and wine within a grocery store (DBA: Sprouts Farmers Market) located at
610 Las Tunas Drive
CEQA: Exempt
Recommendation: Adopt
Applicant:Terri Dickerhoff on behalf of Sprouts Farmers Market
MOTION - PUBLIC HEARING
Chair Tsoi introduced the item, and Senior Planner,Edwin Arreola,presented the staff report.
Mr. Arreola reported that a potential delay in the tenant improvement plan check review has
been identified and therefore Condition No. 2 was added to the draft resolution, stating the
Conditional Use Permit (CUP) for the off-site sale of beer and wine shall become null and
62
2 10/27/2026
void if a Certificate of Occupancy from the Building Division is not issued within 12 months
from the day of the approval.
The public hearing was opened.
The Applicant, Terri Dickerhoff, was present and available to answer any questions from the
Commissioners.
There were no public comments for this item.
Vice Chair Hui made a motion to close the public hearing.
Commissioner Lau seconded the motion.
Without objection, the motion was approved.
DISCUSSION
Commissioner Lau stated that the new grocery store was a good addition to the City and
welcomed Sprouts to Arcadia.
Vice Chair Hui stated that the request for a beer and wine license is typical for a grocery store
and had no concerns. She said the grocery store will be a good fit for the community and is
in support of approving the project.
Chair Tsoi agreed and stated that the location is a good fit for a grocery store and had no
issues with the proposal.
MOTION
It was moved by Vice Chair Hui, seconded by Commissioner Lau to adopt Resolution No.
2201 approving Conditional Use Permit No. CUP 26-07 with the addition of Condition No. 2
to allow for the off-site sale of beer and wine within a grocery store (DBA: Sprouts Farmers
Market) located at 610 Las Tunas Drive. It is exempt from CEQA and all findings were made.
ROLL CALL
AYES: Chair Tsoi, Vice Chair Hui, and Commissioner Lau
NOES: None
ABSENT: Commissioners Arvizu and Lee
The motion was approved.
63
3 10/27/2026
There is a ten (10) day appeal period. Appeals are to be filed by 4:30 p.m. on Friday, November 6, 2026.
2. Resolution No. 2203 – Approving Multi-Family Architectural Design Review No. MFADR 25-
05, Planning Commission Administrative Modification No. PC AM 26-01 for a street side
setback reduction, and Tentative Parcel Map No. TPM 26-01 for a new four unit, three story
condominium development at 1046 Fairview Avenue
CEQA: Categorically Exempt
Recommendation: Adopt
Applicant: Eric Tsang on behalf of Meridian Consulting
MOTION - PUBLIC HEARING
Chair Tsoi introduced the item, and Senior Planner Melissa Chipres, presented the staff
report.
Commissioner Lau asked if the setback reduction will obstruct the visibility of Sunset
Boulevard from the westbound lane of Fairview Avenue.
Ms. Chipres stated the setback reduction will not obstruct the visibility triangle of Sunset
Boulevard and Fairview Avenue.
Commissioner Lau asked if the bus stop on Sunset Boulevard would be affected.
Ms. Chipres stated that the Los Angeles County Metropolitan Transportation Authority (LA
Metro) was contacted for input and they did not express any concerns.
Vice Chair Hui asked if the Applicant considered reducing the size of the units to meet both
the minimum density and the required setback regulations.
Ms. Chipres stated that all design alternatives were considered through the review process.
The public hearing was opened.
The applicant, Kaizen Chen, introduced himself and explained the design process of the
project.
Commissioner Lau asked if they would consider alternative designs to minimize the setback
reduction.
Mr. Chen stated that he would consult the architect, Eric Tsang, about making one of the
units smaller than the others; however, accommodating the request would be challenging.
64
4 10/27/2026
Vice Chair Hui asked why the units were not designed smaller.
Assistant City Attorney Kellan Martz explained that the setback reduction is necessary to
meet the minimum density requirements, and the applicant is permitted to request a
modification to meet that requirement. Furthermore, staff and legal counsel have reviewed
the project as proposed and made the findings to promote uniformity of development and
prevent unreasonable hardship on the property owner.
There were no public comments for this item.
Vice Chair Hui made a motion to close the public hearing.
Commissioner Lau seconded the motion.
Without objection, the motion was approved.
DISCUSSION
Vice Chair Hui and Commissioner Lau were concerned about the setback reduction but
approved the project.
Chair Tsoi stated that the project is very well designed and the setback reduction is hardly
noticeable because of the articulation of the building and the third floor is pushed back
enough to conceal the mass.
MOTION
It was moved by Vice Chair Hui, seconded by Commissioner Lau to adopt Resolution No.
2203 approving Multi-Family Architectural Design No. MFADR 25-05, Planning Commission
Administrative Modification No. PC AM 26-01 for a street side setback reduction, and
Tentative Parcel Map No. TPM 26-01 for a new four unit, three story condominium
development at 1046 Fairview Avenue. It is exempt from CEQA and all findings were made.
ROLL CALL
AYES: Chair Tsoi, Vice Chair Hui, and Commissioner Lau
NOES: None
ABSENT: Commissioners Arvizu and Lee
The motion was approved.
There is a ten (10) day appeal period. Appeals are to be filed by 4:30 p.m. on Friday, November 6, 2026.
65
5 10/27/2026
3. Resolution No. 2202 – Approving Tentative Tract Map No. TTM 26-03 (Tentative Tract Map
No. 85200) and Multiple-Family Architectural Design Review No. MFADR 26-03 for the
conversion of an existing seven unit townhome development to condominium ownership at
772 W. Huntington Drive
CEQA: Categorically Exempt
Recommendation: Adopt
Applicant: Jimmy Shouyi Lee on behalf of JLDB Investment LLC
MOTION - PUBLIC HEARING
Chair Tsoi introduced the item, and Senior Planner Melissa Chipres, presented the staff
report.
Chair Tsoi asked why the Architectural Design Review (MFADR) was necessary if there will be
no design modifications to the exterior of the building.
Ms. Chipres clarified that the MFADR is for the construction of the trash enclosure.
The public hearing was opened.
Jeff Lee introduced himself and spoke on behalf of the property owner.
Vice Chair Hui asked if they are planning to do any improvements to the exterior of the
building.
Mr. Lee stated that they are not proposing improvements but will be updating the
landscaping on the property.
Commissioner Lau asked if the structural integrity of Unit No. 7 will be affected with the
proposed removal of the guest parking.
Mr. Lee stated that they will work with the Building Division to ensure code compliance, and
do not expect to have any issues.
There were no public comments for this item.
Commissioner Lau made a motion to close the public hearing.
Vice Chair Hui seconded the motion.
Without objection, the motion was approved.
66
6 10/27/2026
DISCUSSION
Vice Chair Hui and Commissioner Lau had no concerns about the project.
Chair Tsoi had concerns about the design of the trash enclosure and the orientation of the
trash bins. He asked if the sliding gate could be replaced with a double swinging gate for
better access to the trash bins.
Ms. Chipres stated that there is a garage stall across from the enclosure and the swing gates
could affect the garage entrance.
Chair Tsoi asked staff to verify the dimensions of the trash enclosure, make sure the
orientation of the bins will be practical for use, and to install double swinging gates instead
of the sliding gate if necessary.
MOTION
It was moved by Commissioner Lau, seconded by Vice Chair Hui to adopt Resolution No.
2202 approving Tentative Tract Map No. TTM 26-03 (Tentative Tract Map no. 85200) and
Multiple-Family Architectural Design Review No. MFADR 26-03 for the conversion of an
existing seven unit townhome development to condominium ownership at 772 W.
Huntington Drive. It is exempt from CEQA and all findings were made.
ROLL CALL
AYES: Chair Tsoi, Vice Chair Hui, and Commissioner Lau
NOES: None
ABSENT: Commissioners Arvizu and Lee
The motion was approved.
There is a ten (10) day appeal period. Appeals are to be filed by 4:30 p.m. on Friday, November 6, 2026.
CONSENT CALENDAR
4. Minutes of the October 13, 2026, Regular Meeting of the Planning Commission
Commissioner Lau motioned to approve the minutes and seconded by Chair Tsoi.
ROLL CALL
AYES: Chair Tsoi and Commissioner Lau
NOES: Commissioners Arvizu and Lee
67
7 10/27/2026
ABSTAINED: Vice Chair Hui
The motion was approved.
MATTERS FROM CITY COUNCIL LIAISON
Mayor Pro Tem David Fu reported that there will not be a City Council meeting on November 3 in
observation of the General Election and the next meeting will be on November 17, 2026.
Mayor Pro Tem David Fu also reported that the City Council will be conducting an analysis and
discussion about structures in the City that could pose a hazard in case of a fire emergency.
MATTERS FROM THE PLANNING COMMISSONERS
Vice Chair Hui reported that the group, The Spinners, will be performing at the Arcadia Performing
Arts Center in January 2027.
MATTERS FROM ASSISTANT CITY ATTORNEY
Assistant City Attorney Kellan Martz informed the Commission that there are new Accessory
Dwelling Unit laws in the pipeline and there is more information to come.
MATTERS FROM STAFF INCLUDING UPCOMING AGENDA ITEMS
Mr. Rosengren reported that the November 10 Planning Commission meeting is tentative and there
will be one item on the agenda.
ADJOURNMENT
The Planning Commission adjourned the meeting at 8:00 p.m., to Tuesday, November 24, 2026, at
6:30 p.m. in the City Council Chamber.
Chair, Planning Commission
68
8 10/27/2026
ATTEST: ____________________________________
Jared Rosengren
Secretary, Planning Commission
69