HomeMy WebLinkAboutItem 9g - Accept Stormdrain Repair Project STAFF REPORT PUBLIC WORKS SERVICES DEPARTMENT DATE: December 1, 2026 TO: Honorable Mayor and City Council FROM: Paul Cranmer, Assistant City Manager / Public Works Services Director By: Michael Kwok, Associate Civil Engineer SUBJECT: ACCEPT ALL WORK PERFORMED BY GRBCON, INC. FOR THE STORMDRAIN REPAIR PROJECT AS COMPLETE CEQA: Exempt Recommendation: Approve SUMMARY On April 21, 2026, the City Council approved a contract with GRBCON, Inc. in the amount of $144,325 for the Stormdrain Repair Project. The terms and conditions of this project have been complied with and the work has been performed to the satisfaction of the Project Manager for a total project cost of $143,000. This amount reflects the original contract amount of $144,325, minus contract change orders totaling $1,325, or 0.9% less than the original contract amount. It is recommended that the City Council accept all work performed by GRBCON, Inc. for the Stormdrain Repair Project as complete, and authorize the final payment to be made in accordance with the contract documents, subject to the retention of $7,150. BACKGROUND The Public Works Services Department (“PWSD”) owns and maintains various catch basins and stormdrain lines throughout the City. During previous storms, staff observed that water was unable to properly drain from a curb opening catch basin on Fallen Leaf Road. City crews located the pipe in this catch basin and attempted to perform an inspection utilizing Closed Circuit Television (“CCTV”) equipment. The CCTV camera could not get through the pipe, which indicated that the pipe was damaged and likely collapsed. Replacement of the damaged pipe with a new Accept Stormdrain Repair Project December 1, 2026 Page 2 of 3 reinforced concrete pipe was necessary to restore proper stormwater flow in that area and eliminate potential flooding. DISCUSSION On April 21, 2026, the City Council approved a contract with GRBCON, Inc. for the Stormdrain Repair Project. The work performed included replacement of the existing damaged 18-inch stormdrain pipe on Fallen Leaf Road. During the course of work, the City received credits for reductions in quantities of material needed to complete the project. Below is a breakdown of total contract change orders. CCO Description Amount 1. Deleted (5 LF) – Remove Existing Stormdrain Pipe and Replace with New 18” RCP Pipe ($1,325) Total ($1,325) The change orders listed reduced the overall contract amount by $1,325, or 0.9% less than the original contract amount. All terms and conditions of this contract have been complied with, and the work has been performed to the satisfaction of the Project Manager. GRBCON, Inc. completed the work as defined in the project plans and specifications in an efficient and timely manner. ENVIRONMENTAL ANALYSIS This project involves the replacement and minor alteration of an existing utility system with no expansion of the system, and therefore, qualifies as a Class 2 categorical exemption per Section 15302(2) of the California Environmental Quality Act (“CEQA”). FISCAL IMPACT Gas Tax (HUTA) Funds in the amount of $100,000 were budgeted for the Stormdrain Repair Project, in the FY 2025-26 Capital Improvement Program. However, these funds were insufficient to complete the project. Therefore, on April 21, 2026, the City Council approved a supplemental budget appropriation of $58,757.50 from the Capital Outlay Fund bringing the total funds available to $158,757,50. Accept Stormdrain Repair Project December 1, 2026 Page 3 of 3 The total construction cost for this project is $143,000. The total cost reflects the original contract amount of $144,325, minus change orders totaling $1,325, or 0.9% less than the original contract amount. Therefore, sufficient funds are available. RECOMMENDATION It is recommended the City Council determine that this project is exempt under the California Environmental Quality Act (“CEQA”); and accept all work performed by GRBCON, Inc. for the Stormdrain Repair Project as complete, and authorize a final payment to be made in accordance with the contract documents, subject to the retention of $7,150.